ML20134D43912 August 1985Withers B
Portland General Electric
Discusses Auxiliary Feedwater Sys.Administrative Limit of Greater than or Equal to 60% Established for Water Level in Condensate Storage Tank.Review of History of Sys Will Be PerformedOther
ML20132B33313 September 1985Butcher E
Office of Nuclear Reactor Regulation
Requests Tech Spec Changes to Eliminate Inconsistency in Tech Spec 3.7.1.4 Requirement for Condensate Storage Tank Min Level of 47% Water & 60% Water Level Determined to Be Necessary After 850720 Auxiliary Feedwater Pump TripOther
ML20137Y1868 October 1985NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Zukor D
Forwards AEOD/E514, Engineering Evaluation for Core Damage Precursor Event at Trojan. Most Serious of Five Events Occurred on 840920.Events Indicate Lack of Attention to Detail & Lack of Good Maint PracticesOther
ML20137Y19831 October 1985NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Zukor D
Engineering Evaluation for Core Damage Precursor Event at TrojanOther
ML20137H53725 November 1985Withers B
Portland General Electric
Forwards Review of Auxiliary Feedwater Sys for Reliability Improvements. List of Sys Mods & Schedule for Completion of Mods Encl.License Change Application Will Be Submitted to Add safety-related Surveillance RequirementsOther
ML20137H59830 November 1985BECHTEL GROUP
INC.
Review of Auxiliary Feedwater Sys for Reliability ImprovementsOther
ML20203N84529 April 1986Withers B
Portland General Electric
Forwards Description of Effects of Planned Auxiliary Feedwater Sys Mods on Long-Term Recommendations GL-2 & GL-4, SRP Section 10.4.9 & Fsar.Sys Mods Scheduled for 1986 Refueling Outage Which Started on 860416Other
ML20203L32421 August 1986Withers B
Portland General Electric
Discusses Status of Action Items Re Auxiliary Feedwater Sys Mods,Per Util .All Items Scheduled for Implementation by Startup of 1986 Outage Complete,Except as ListedOther
ML20213F39710 November 1986NRCSafety Evaluation Supporting Util Responses Re Effects of Proposed Mods to Improve long-term Reliability of Auxiliary Feedwater Sys Per Recommentations GL-2 & GL-3Approval
ML20213F38210 November 1986Chan T
Office of Nuclear Reactor Regulation
Forwards Safety Evaluation Supporting Util Responses in 851125 Rept on Auxiliary Feedwater Sys Design.Mods Consistent W/Recommendations GL-2 & GL-3 & AcceptableApproval
ML20214N97024 November 1986Lindblad W
Portland General Electric
Informs That Due to Problems W/Mechanical Overspeed Trip, 860821 Mod to Remove Electrical Overspeed Trip Reevaluated. Problems Identified During Setpoint Verification Testing. Electrical Overspeed Trip Will Remain OperationalOther