ML20211H592

From kanterella
Revision as of 17:02, 6 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-155/87-04 on 870126-29.No Violations Noted
ML20211H592
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/20/1987
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20211H597 List:
References
NUDOCS 8702260217
Download: ML20211H592 (2)


See also: IR 05000155/1987004

Text

~

, .

ONB

W

FEB 2 01987

Docket No. 50-155

Consumers Power Company

ATTN: Dr. F. W. Buckman

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

This refers to the routine safeguards inspection conducted by

Messrs. G. Pirtle and J. Belanger of this office on January 26-29, 1987, of

activities at Big Rock Point Nuclear Power Plant authorized by NRC Operating

License No. DPR-6 and to the discussion of our findings with Mr. D. Hoffman

and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

A concern was noted during the inspection pertaining to progress in resolving

a deteriorating assessment capability and is addressed in Section 7 of the

report Details. Please provide us a written response, within 30 days after

receipt of this letter, addressing management actions and time-frames for

resolving the concern. Because this issue has been identified for almost

a year and has not yet been adequately addressed, this issue warrants senior

management support until it is resolved.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report

of this inspection will not be placed in the NRC Public Document Room.

The written response directed by this letter is not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

9 jhk

g 22gggy 738$ Q3

G

Enclosure contains

SAFEGUARDS INFORMATION

Opon separation this

gg page is Dccontrolled

-

7

.

Consumers Power Company 2 FEB 2 01987

i

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J. A. Hind, Director

Division of Radiation Safety

and Safeguards

Enclosure: Inspection Report

No. 50-155/87004(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

D. P. Hoffman, Plant

Superintendent

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Caller., Michigan

Public Service Commission

Nuclear Facilities and

Environmental Monitoring

Section

Enclosure contatns

SAFEGUARDS INFORMATION

Oponseparationthis

page is D controlled

, >

RIII RIII RIII RIII RII

Pir e 1ms Bela ger dadi (1 4a

~-- .-

Val ll w

m , . . _ , 0 .. h,(