ML20215L104

From kanterella
Revision as of 23:01, 18 April 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/86-27 on 860801-0915 & Notice of Violation
ML20215L104
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20215L106 List:
References
NUDOCS 8610280471
Download: ML20215L104 (2)


See also: IR 05000458/1986027

Text

r

. .

OCT 2 41956

In Reply Refer To:

Docket: 50-458/86-27

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President,

River Bend Nuclear Group

P. O. Box 220

St. Francisville, Louisiana 70775

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain, W. B.

Jones, and W..R. Bennett of this office during the period August 1 through

September 15, 1986. of activities authorized by NRC Operating License NPF-47

for River Bend Station, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included review of Licensee Event

Reports (LERs), licensee action on IE Notices, startup test result evaluation,

safety system walkdown, surveillance witnessing, maintenance witnessing,

operational safety verification, followup on allegations, and in-office review

of written reports of non-routine. events at power reactor facilities. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

.

Sincerely,

Oridnal Signed By'

$0]g gg@$j58 J. E. Gagilardo

g PDR J. E. Gagliardo, Chief

Reactor Projects Branch

j,h (

Enc o res: (see n - age) ,

i

SJ :RPB/A R:'RP /A PI:RPB/Appf CRBA EC k C:RPB d

WRBennett JPJaudon MEEmerson JEGagliardo

hDChamberlaihWJones

f g/ lb/86 /0/p /86 4/u./86 jo//t)/86 /

4/9/86 /d/23 ,861

1

(. ,

-

.

. .

s .

.

Gulf States Utilities -2-

.

.

Enclosures:

1. Appendix A - Notice of Violation ,

2. Appendix B - NRC Inspection Report

50-458/86-27

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • SectionChief(RPB/A) *D. Weiss, LFMB (AR-2015)
  • MIS System *RSB
  • RSTS Operator *W. R. Bennett
  • R&SPB *RIV File

M. E. Emerson, RIV

  • w/766