Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl
ML20210J969
Person / Time
Site: River Bend, 050458O  Entergy icon.png
Issue date: 07/30/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Edington R
ENTERGY OPERATIONS, INC.
References
NUDOCS 9908050152
Download: ML20210J969 (7)


Text

c,J#'%c UNITED STATES NUCLEAR REGULATORY COMMISSION 3

2 7,

5 j

REGDN IV

[

611 RYAN PLAZA DRIVE, SulTE 400 ARLINGTON, TEXAS 76011-8064 j

yj JUL 301999 Randal K. Edington, Vice President - Operations River Bend Station j

Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

SUBJECT:

SUMMARY

OF PUBLIC MEETING HELD ON JULY 19,1999, AT THE NRC REGION IV OFFICE TO DISCUSS THE FAILED FUEL RECOVERY PROJECT

Dear Mr. Edington:

This refers to the meeting conducted on July 19,1999, at the NRC Region IV office, Arlington, Texas. The purpose of the meeting was to permit representatives from Entergy Operations, Inc. to discuss with the Region IV staff the findings of the root cause investigation into fuel cladding failures that occurred during the recent Cycle 8 operation. This meeting was a compressed presentation of the information presented at a meeting held in Washington D.C. on June 22,1999. A portion of this meeting involved discussions pertaining to proprietary information and was closed to the public. Also discussed was the reorganization of the engineering department.

There was no new nonproprietary information presented at the July 19 meeting and the handout presented was the same as the one included in the meeting summary dated June 29, 1999, of the June 22 meeting. Enclosed is a copy of the new engineering organization chart.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions, please contact me at 817/860-8248.

Sincerely, wh w

jw n E. Broc n, Di 6ctor ivision of Reactor P;rojects Docket No.:

50-458 License No.: NPF-47 l

Enclosures:

j

1. Attendance List
2. RBS Engineering Organization Chart 9908050152 990730 PDR ADOCK 05000458 P

PDR

F Entergy Operations, Inc. cc w/ enclosures:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

F.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn

-1401 L Street, N.W.

Washington, D.C. 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General l

Department of Justice State of Louisiana P.O. Box 94005 i

Baton Rouge, Louisiana 70804 9005

Entergy Operations, Inc.-

. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775

^

Ronald Wascom, Administrator Louisiana Radiation Protection Division

' P.O. Box 82135 Baton Rouge, Louisiana 70884 2135

I Entergy Operations, Inc. JUL 3 01999 bec distrib. by RIV:

. Regional Administrator Resident inspector DRP Director RIV File DRS Director RITS Coordinator Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

I DOCUMENT NAME: R:\\_RBS\\RB7-19MS-DRP.wpd To receive copy of document. Indicate in box: "C" - Copy without enclosures *E* = Copy with enclosures *N' = No copy RIV:PE:DRP/B -V// C:DRP/B D:DRP l

l RAKopriva;df /4%

DNGraves P KEBrockman V) 7/2c3/99

'7 /10/99 9 / 40 /9 9 OFFICIAL RECORD COPY 05.0037 l

ENCLOSURE 1 PUBLIC MEETING ATTENDANCE LICENSEE / FACILITY Entergy Operations, Inc. / River Bend Station DATE/ TIME July 19,1999; LOCATION Region IV Training Conference Room NAME (PLEASE PRINT)

ORGANIZATION TITLE ha% Cxwes Nitc /en /u e d e A CA.M

&a & b wi Mc / PET /DAP SeguesP 8erer En

/b L

.J ae / axsw n

n-2 n

/

~

fas /Y)ews em-f AHLc/171T Sc,auu.0om,~usrurve to;/L

n. :r;Ln.,

xxcinrr/oap nc+:2 ce,nay i's:,-ac-te-hqW A.

Powsn s Nac/KR/DRS /EM b Cee F kue. bles not/ms me-TuA song TAN 2Ae 9 ' less h-E,wm eenn s J

./

h

  • dd W hk g

a i

I Page _ of _

1

I I

ENCLOSURE 2 RBS Engineering O m.

Dan Pa Directi Enginee W

I I

Bill Mashbum Amir Shahkarami Manager Manager Program & Components System Engineering De:

Otto Dulich Roger Barnes Ridy Fili Technical Assistant Scott Martin Supervisor Supervisor Supervisir Plant Programs Component Engineering Mechanical Syste 7

Dob Lundholm Tam Gates Hudy Kerar Erwin Zodi to Dewee x!

Mike Smas Alex Abella SUP"'"i'0' 6'P"i'"'

Melissa Utheria.

NSSS DOP Cyron Ellis Kerry Cran Jodi Fur-Chip Holbert Duncan Parks Eve Clevenge.

Don Crankst:aw Norm Pressler Ghodrat Javener Vince Bacankas Jorge Merchan Sada Dhinara Grry Lipham Rach Martan Snan #- editerkort Ken Klamert Tom HoMman Doug Steinsiek Jim Roberts George Mermigas Steve Burd James Schletdnt Joe Mead Quoc Nguyen Ken Garner Dit Stuart Wendell McDougald Diane Stewad Tom Scheibel Randy Gauthree Chris ForpaN Scott Young Loyd Sullivan Supervisir Supervisor Dean Sandten Jan Wilson Electnces Codes Program Vacart Randy G'ued Vacart Vacare l'#" D '

t em Avellone I

O"# N

GLirwi Chatterton Roanee Cole Dick Frayer Fatesha Corte Tony Glass Supervisor Supervisor 8

f.eggie Jacksorg Ella C Computers. MR & EPtX

,,"o S Girland Mahan Zoom Nguyen R aiesh Gupta John Jostai John Lee Supervisor Jim Huddleston David Robinson Piping Jerry Parker Dell Costenett Melinda Robinette Steve Hagge Kevin Dorneman Floyd Lenox Tom Carpenter Gerry Hendt ones air gis Vacart Vacant Rena Len Camilo Cuadn Devendra Dost Harry Goodman Superirtendert Reactor Engineering Andrew Detveu

[

John Vukovics l

Tony Huieu Ken Shacter Vacart I

J ENCLOSURE 2 Organization Chart Pcce e

cctor ucring i

Donna Fancher Secretary

=t E

I i

Russ Brian Bob Azzarallo Paul Sicard Manager Manager Manager Dssign Engineering Engineering Support Safety Analysis r

T om Ohphart artin Pad Miktus Allan Sori Jane Arstoirs Tom Hunt isar Supervisor Supervisor Supervisor Systems Civd Minor Mo6fication Configureton Managemera Chns Pratt John Maher Phu Vo VirgN Furr Wai Law p

e ne Mansoor Ahrned Jamee (aneza Norman Guidry Loys Dedell herland Hamin Grunes Joe CampbeJ Mike Poulard ur-Maher Kassar Jamil Khan Terri Swid eriger Moussef Aart Dett Sirnps4,n Rick Ludwig vaherian John Dunkelberg Erkan Dorazand Judy Patin i

sinJra Cedric Jones Rman

'*no-Debra Rogers gg gg Manager Dave uoody Project Management

. Chrm ux Grin Firteneur Supervisor Engineenng Administration isw Supervisor Procuremert Coorenata cat ISC l

.44 Matrix from P&$

PlanrtnD & Schedutirg i

Uenny Jettarc Ed Lestee Wells Amar Datawart I

Dill Claran hrmai John Langberg Rick Redmond Dave Wilson Tom Crouse Corley Debbie Janicek Chris Deaudet Dob Jones Ken Suhrke hander Paul Matzke John Ashley Bobby low Ron Bullard r stka Lee Drescher Dergamin Dem Fred Wison Deverly Neff Jerrell Campbet

~

Vijay Shertudke Ron Findish lupta Juartta Clark L"

Kevin Danes

' O Chuck Henderson h-* -

Oscar Robertson Projed Managers

]

Mark Walton ugis

.so asadra Dosti Dwigtut Gilley-Maintenance Mike Murray-Technical Assistarst-PLS Clerical smport provided from clerical pool as needed L

w

Entergy Operations, Inc. JUL 301999 bec to DCD (IE45) i bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director RIV File DRS D! rector RITS Coordinator Branch Chief (DRP/B) l Project Engineer iDRP/B)

Branch Chief (DRP/TSS)

)

1 t

DOCUMENT NAME: R:\\_RBS\\RB7-19MS-DRP.wpd To receive copy of document, Indicate in box: "C" - Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/B - V/2 C:DRP/B l D:DRP l

l RAKopriva;df /4f%

DNGraves IP KEBreckman V) 7/29/99 7 /10/99 9 /;0/99 OFFICIAL RECORD COPY i