ML20196E060

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations
ML20196E060
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/18/1999
From: Graves D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Edington R
ENTERGY OPERATIONS, INC.
Shared Package
ML20196E065 List:
References
50-458-99-05, 50-458-99-5, NUDOCS 9906280031
Download: ML20196E060 (4)


See also: IR 05000458/1999005

Text

..

.

.

  1. "4,

UNITED STATES

3

%

NUCLEAR REGULATORY COMMISSION

"

4

O

li.

e

REGloN IV

t.,

611 RYAN PLAZA DRIVE, SUITE 400

%,,

ARLINGTON, texas 76011-8064

,,

JUN I 81999

Randall K. Edington, Vice President - Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-05

Dear Mr. Edington:

l

This refers to the inspection conducted on April 18 through May 29,1999, at the River Bend

Station facility. The enclosed report presents the scope and results of this inspection.

During the 6-week period covered by this inspection, your conduct of activities at River Bend

Station were generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological work controls. Based on the results of this

inspection, the NRC has determined that four violations of NRC requirements occurred. These

violations are being treated as noncited violations (NCVs), consistent with Appendix C of the

Enforcement Policy. These NCVs are described in the subject inspection report.

If you contest the violation or severity level of these NCVs, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with

copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Y

c!

-

/f

/

David N. Graves, Chief

Project Branch B

Division of Reactor Projects

Docket No.:

50-458

License No.: NPF-47

9906280031 990618

PDR

ADOCK 05000458

G

PDR

r

.

.

Entergy Operations, Inc.

-2-

Enclosure:

NRC Inspection Report No.

50-458/99-05

cc w/ enclosure:

Executive Vice President and

- Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

General Ma.iager

Plant Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Director - Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn

1401 L Street, N.W.

Washington, D.C. 20005-3502

Manager - Licensing

River Bend Station

' Entergy Operations, Inc.

'

P.O. Box 220

St. Francisville, Louisiana 70775

i

l

.

i

..

Entergy Operations, Inc.

-3-

The Honorable Richard P. leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

. Baton Rouge, Louisiana 70804-9005

H. Anne Plettinger

3456 Villa Rose Drive -

Baton Rouge, Louisiana 70806 -

President of West Feliciana

' Police Jury

P.O. Box 1921

St. Francisville, Louisiana 70775

Ronald Wascom, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

I

F*

l

-

JUN I 81999

Ent v jy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident I:ispector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/B)

RIV File

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:\\_RB\\RB905RP.GDR

,

. To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:RI:DRP/B

SRl:DRP/B

C:DRP/B

NPGarrett

GDReplogie /,

DNGraves

v.

6/ d /99 W

6/d /99

kV

6/l 9 /99

'Y

DFFICIAL RECORD COPY

'

T

>;9-

r-.

8'

JUN I 81999

Entergy Operations, Inc.

-4-

i

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

I

E Mail report to Document Control Desk (DOCDESK) .

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) -

bec to DCD (IE01)-

bec distrib. by RIV:

Regional Administrator

Resident inspector

z

DRP Director

DRS-PSB

DRS Director

MIS System

f

Branch Chief (DRP/B)

RIV File

Project Engineer (DRP/B)

)

Branch Chief (DRP/TSS)

{

i

l

[g ') O '

E

.

{1

DOCUMENT NAME: R:\\_RB\\RB905RP.GDR

To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:RI:DRP/B

SRI:DRP/B

C:DRP/B

NPGarrett

GDReplogie /,

DNGraves

r

6/ \\ /99

(V

6/d /99

LV

6/l 9 /99

i

OFFICIAL RECORD COPY