e
" " ' 4,
UNITED STATES
l
/
\\
NUCLEAR REGULATORY COMMISSION
1
.
REGloN iv
g ,y , q j
611 RYAN PLAZA DRIVE, sulTE 400
1
4 ,,,,,
ARLINGTON, texas 76011-8064
MAY I 81999
-
Randall K. Edington, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-03
Dear Mr. Edington:
l
This refers to the inspection conducted on March 7 through April 17,1999, at the River Bend
?
Station facility. The enclosed report presents the results of this inspection.
I
Based on the results of this inspection, the NRC has determined that eight violations of NRC
requirements occurred. These violations are being treated as noncited violations (NCVs),
consistent with Appendix C of the Enforcement Policy. Several have been consolidated as
multiple examples of failing to follow procedures. We are concerned since almost all of the
problems identified in this report were associated with poor human performance (e.g.,
procedural adherence). Of particular note were the failures associated with fue! and its
movement, the three inadvertent engineered safety features actuations, and failures to properly
perform weekly Division lli standby service water pump breaker checks. Although none of
these problems, in and of themselves, imposed significant plant risk, they give rise to concerns
about River Bend's overall outage performance.
We are also concerned with the continuing engineering performance problems that, during this
period, culminated in a design control violation. The engineering evaluation to determine the
design fouling rate for the Division I residual heat removal heat exchangers failed to consider all
operational conditions and changes that could impact the evaluation results; furthermore, your
processes and procedures did not identify the quality shortcomings of this product. It was only
when you conducted performance testing in response to our concerns that you discovered that
the actual degradation rate was three times what the evaluation predicted. Recent NRC reports
have highlighted similar instances where the validity of engineering assumptions and the quality
j
of engineering product reviews have been questioned.
Increased management attention is needed to address this continuing concern. In this regard,
{
we would like to meet with you to better understand your assessment of performance during
{
this outage and its implication on overall River Bend operations. We believe this meeting would
j
best be conducted after your outage review has been completed. We also believe this meeting
would be most effective at the River Bend location. Mr. David N. Graves, Chief, Project
Branch B, will contact your staff to coordinate the details of this meeting.
>
If you contest the violation or severity level of these NCVs, you should provide a response
j
within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with
9905250275 990518
ADOCK 05000458
i
i
G
'
j
[
.
Entergy Operations, Inc.
-2-
'
copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,
.
United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
i
enclosure will be placed in the NRC Public Document Room (PDR).
j
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Ken E.
rockman, Dire tor
Division of Reactor Projects
Docket No.:
50-458
License No.: NPF-47
Enclosure:
NRC Inspection Report No.
50-458/99-03
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
)
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
j
i
__ __ ____ -
. _ _ _ _
.
.
Entergy Operations, Inc.
-3-
Director - Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne P!ettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
Ronald L. Wascom, Administrator
Louisiana Department of Environmental Quality
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
..
. .
.
.
._
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
__.
.
l
\\
.
Entergy Operations, Inc.
-4-
MAY I 81999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Oorreia (RPC)
E-Mail report to Fra;ik Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\ RB\\RB903RP.GDR
,
To receive copy of document. Indicate in box: 'C" = Copy without enclosures "E" = Copy with enclosures *N" = t$ngpy
RIV:Rl:DRP/C l
SRI:DRP/C l
D:DRS/PS l
C:DRP/C
D:DRP(l /, ,
NPGarrett*
GDReplogle*
GMGood*
CSMarselills
KEBrogmilh ' '
5/11/99 (T)
5/11/99 (T)
5/11/99
5/11/9k'~Jh\\ 5/ /T/99
- previously concurred
OFFICIAL RECORD COPY
y-
_
e'
.
.
Entergy Operations, Inc.
-4-
,
MAY I 81999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
]
E-Mail report to NRR Event Tracking System (IPAS)
'
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS PSB
DRS Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
i
I
i
250072
- DOCUMENT NAME: R:\\_RB\\RB903RP.GDR
'
To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = %py
RIV:RI:DRP/C
SRI:DRP/C
D:DRS/PS
C:DRP/C
D:DRP(f tm
NPGarrett*
GDReplogle*
GMGood*
CSMars# fell
KEBrgmf '
i
5/11/99 (T)
5/11/99 (T)
5/11/99
5/11/9( 7 0 5/ /T/99
- previously concurred