ML20205D769
| ML20205D769 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 03/26/1999 |
| From: | Marschall C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20205D773 | List: |
| References | |
| 50-458-99-02, 50-458-99-2, NUDOCS 9904020297 | |
| Download: ML20205D769 (5) | |
See also: IR 05000458/1999002
Text
l
\\
-
p*%
UNITED STATES
j
0
4
NUCLEAR REGULATORY COMMISSION
-
5
S
E
j
REGloN IV
,8
611 RYAH PLAZA DRIVE, SulTE 400
<,
'*
ARLINGTON, TEXAS 76011-8064
,, g
MAR 2 61999
Randall K. Edington, Vice President - Operations
River Bend Station
-
Entergy Operations, Inc.
P.O. Box 220
.)
St. Francisville, Louisiana 70775
'
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-02
Dear Mr. Edington:
This refers to the inspection conducted on January 24 through March 6,1999, at th'e River
Bend Station facility. The en::losed report presents the scope and results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at River Bend
Station was generally characterized by safety-conscious operations, sound engineering and
1
maintenance practices, and careful radiological work controls. Based on the results of this
)
inspection, the NRC has determined that one violation of NRC requirements occurred. This
i
violation is being treated as a noncited violation , consistent with Appendix C of the
{
Enforcement Policy. The NCV is described in the subject inspection report.
If you contest the violation or severity level of the noncited violation, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-
'
0001, with copies to the Regional Administrator, Region IV, and the Director, Offico of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
(
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
l
Should you have any questions concerning this inspection, we will be pleased to discuss them
1
with you.
Sincerely,
j
'
& S. 7/& g C '
Charles S. Marschall, Chief
Project Branch C
Division of Reactor Projects
Docket No.:
50-458
License No.: NPF-47
)
I
'
,
9904020297 990326
ADOCK 05000458
G
J
!
.. - - - - -
-
.
-
-
-
.
-
-
MAR 2 61999
'
,
' Entergy Operations, Inc.
-2--
,.
.
. Enclosure:
NRC Inspection Report No.
' 50-458/99-02 ~
cc w/ enclosure:
' Executive Vice President and ,
Chief Operating Officer-
'
Entergy Operations, Inc.
P.O. Box 31995
' Jackson, Mississippi 39286-1995
Vice President -
'
Operations Support
' Entergy Operations,'inc.
P.OL. Box 31995 '
Jackson, Mississippi 39286-1995
General Manager
!
'
Plant Operations
River Bend Station
Entergy Operations, Inc.
' P.O. Box 220"
St. Francisville, Louisiana 70775
.
Director - Nuclear Safety
~'
'
River Bend Station'
- Entergy Operations, Inc.
P.O. Box 220 -
St; Francisville, Louisiana 70775
I
Wise, Carter, Child & Caraway
'
P.O. Box 651 -
Jackson, Mississippi 39205 -
Mark J. Wettehahn Esq.
' Winston & Strawn
1401 L Street, N W.
4
Washington, D.C. 20005-3502
,
Manager - Licensing.
River Bend Station
i
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
1
,
]
r.
j
-
i
'
.
Entergy Operations,'Inc.
-3-
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana ~~
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
l
H. Anne Plettinger
j
3456 Villa Rose Drive
i
Baton Rouge, Louisiana 70806
President of West Feliciana
j
Police Jury
j
P.O. Box 1921
i
~
St. Francisville, Louisiana 70775
Ronald L. Wascom, Administrator
Louisiana Department of Environmental Quality
P.O. Box 82135
,
Baton Rouge, Louisiana 70884 2135
l
1
I
i
1
,
,
4. ,
- Entergy Operations, Inc.
-4-
- E-Mail report to T. Frye (TJF)
'
J
E-Mail report to D. Lange (DJL)'
_
.
- E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK) .
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01),
,
.
_
. bec distrib'. by RIV:
.
' Regional Administrator
l Resident inspector
DRP Director -
DRS-PSB
DRS Director,-
MIS System
Branch Chief (DRP/C)
RIV File
.
,
- Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
,
)
\\
DOCUMENT N'AME: R:\\_RB\\RB902RP.GDR
To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
,
RIV:Rl:DRP/C
SRI:DRP/C
C:DRP/C
NPGarrett ' ' /-
GDReplogie L *-
CSMarschall'E
3/ ?-/99
3/ . * /99
3/ ' /99
OFFICIAL RECORD COPY
<
020039
1
.
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
,
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IFAS)
- E-Mail report to Document Control Desk (DOCDESK) .
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
~ bec distrib. by RIV:
Regional Administrator'
Resident inspector-
'DRP Director
DRS-PSB
DRS Director
MIS System -
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/L)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:(RB\\RB902RP.GDR
)
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
l
RIV:RI:DRP/C
SRI:DRP/C
C:DRP/C
NPGarrett @#/n GDReplogie f6ff/rn
CSMarschallSh?
"
3/t(/99
3/2C/99
3/&/99
OFFICIAL RECORD COPY
j
hm
a-
-
I