RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47
ML20216G115
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/23/1999
From: King R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216G118 List:
References
RBF1-99-0281, RBG-45122, NUDOCS 9909280426
Download: ML20216G115 (2)


Text

fg. . -. EntIrgy oper:tions, Inc.

/ \ River Bend Station

) j. 5485 U.S. Highway 61

/' 'l _ .,f ' P O. Box 220 v} St Francisville. LA 70775 Tel 225 336 0225 Fax 225 635 50G8 Rick J. King Dnector Nuclear Safety Assarante September 23,1999 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Ninth Fuel Cycle Core Operating Limits Report (COLR), Revision 3 File Nos.: 09.5, G9.25.1.5 RBG-45122 RBF1-99-0281 Ladies and Gentlemen:

1 Enclosed is Revision 3 of the River Bend Station (RBS) Core Operation Limits Report (COLR) j for the ninih fuel cycle. This report is submitted in accordance with Technical Specification 5.6.5 of Appendix A of the Facility Operating License NPF-47.

For further information, contact Ms. P. L. Campbell ct (225) 381-4615.

S' erely, Q \..

RJK/BMB/

enclosure

/k( (f..wl .

()80 *

,,o,aso4a 9,ovas PDR ADOCK OSooo438' P PDR w J

', Ninth Fuel Cycle Core Operating Limits Report 3 (COLR), Revision 3 September 23,1999

' RBF1-99-0281 I RBG-45122 F Page2 of 2 cc: Mr. Robert Fretz U. S. Nuclear Regulatory Commission M/S OWFN 04-D-03 ,

Washington, DC 20555 NRC ResidentInspector P. O. Box 1050 St.Francisville,LA 70775 U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400  ;

Arlington,TX 76011 I

l I