ML20206N881

From kanterella
Jump to navigation Jump to search

Forwards Notice of Withdrawal of 981120 Amend Request for License NPF-47.Proposed Amend Would Have Established New TS 3.10.9, Control Rod Pattern - Cycle 8, Added to Section 3.10, Special Operations
ML20206N881
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/12/1999
From: Robert Fretz
NRC (Affiliation Not Assigned)
To: Edington R
ENTERGY OPERATIONS, INC.
Shared Package
ML20206N887 List:
References
TAC-MA4213, NUDOCS 9905180095
Download: ML20206N881 (2)


Text

-.

a .A h y 12, 1999 Mr. Randall K. Edington LVice President - Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA .70775.

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MA4213)

Dear Mr. Edington:

By letter dated November 20,1998, you applied for an amendment to Facility Operating License NPF-47. The proposed amendment would have established a new Technical _

Specification (TS) TS 3.10.9, " Control Rod Pattern - Cycle 8," added to Section 3.10, "Special Operations." The new TS 3.10.9 was requested as a result of a plant-specific configuration where control rods were inserted into the reactor core for neutron flux suppression surrounding fuel assemblies that were identified as having possible fuel cladding defects. Subsequently, by letter dated April 8,1999, you withdrew the amendment request.

1 The Commission has filed the encfosed Notice of Withdrawal of Application for Amendment to l Facility Operating License with the Office of the Federal Register for publication. i Sincerely, i

ORIGINAL SIGNED BY Robert J. Fretz, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket' No. 50-458. DISTRIBUTION

%Dechet Filg SRichards /

Enclosure:

Notice of Withdrawal , PUBLIC Kerockman,RIV

'cc: See next page!

PDIV-1 Reading ACRS OGC /

M/ 1 DocumenI Name:- G':\RIVERBND\WDMA4213.WPD To receive cow of document indicate E = copy w/enci C = copy w/o enci N = no copy

~J l OFFICE PM/PDIV-1' , E- LA/PDIV 1 A 3 E SC/PDIV 1_ E l NAME RFretz:db - [4/ LBerry N RGramm W DATE' S / /t/99 h / B /99 h(M9

. OFFICIAL RECORD COPY.

9905190095 990512 PDN ADOCK 05000458 L P POR [

A ..

' t River Bend Station ec:

Winston & Strawn Executive Vice President and 1400 L Street, N.W. Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager- Licensing Jackson, MS 39286 ,

Entergy Operations, Inc.

River Bend Station General Manager - Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support Regional Administrator, Region IV Entergy Operations, Inc.

U S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attomey General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70006 Baton Rouge, LA 70804 9095 Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135

.. . _ .