Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-27. Understands That Comparison of Expanded Unreviewed Safety Question Committee Data Base Will Be Reviewed by Committee
ML20247D466
Person / Time
Site: River Bend 
Issue date: 09/11/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8909140267
Download: ML20247D466 (2)


See also: IR 05000458/1989027

Text

r17L

y--

g -

-

= - - - - -

- - -

-

- -

-

,

- p ua , ,,

g

,

n

p

,

s

,

y

,

,

,

-

'

,

-

,

-

,g.s.;.

.

SEP l'l 1989

.

,

'/

In. Reply' Refer"To:.

Docket:- 50-458/89-27

+

m,

_--

n,

..

.,

'o-

-.

.

,i '

i

Gulf States Utilities

r

'l ~ > ? ATTN:; Mr. James C. Deddens .

_

Senior'Vice' President'(RBNG)

m

.

P.0'.': Box 220-

,

..

-

'

'

St. Francisville, Louisiana?-70775:

,

'

m 7

.

,

-

'

4

".

.

.

^

Gentlemen:

F

,

- '

+

..

.

i

,

1Thank you for your letter of August 11,1989, in response to our letter and

Notice of: Violation dated July 17, 1989. We understand,-as discussed with;'

n.

,

'

'.

your Mr.' Rick King during a' telephone call on August 29, 1989, that

'

comparison'of the expanded unrevi_ewed safety question.conmittee' database-

'against the list of unreviewed safety question ' determinations '(USQDs) will .

'

Y

address"all previous USQDs, with review by the' Facility Review CommitteeLand'
  • <

,

~ " ~

the' Nuclear _ Review Board as required.

'

We'will' review the implementation of your corrective actions during a future '

= inspection to determine'that full compliance has'been achieved and.will be1

.

, maintained.'

Sincerely,

e

C%inalsigned sy:

Thomas P.Gwynn

'

James L. Milhoan, Director-

Division of Reactor Projects

'

cc:

-

-Gulf States Utilities-

ATTN:

J. E. Booker, Manager-

River Bend Oversight

M

P.O. Box 2951-

Beaumont,-Texas 77704

-

m

7

.RIV:RI:HQPS*-

C:MQPS*

D:DRS*

RP

7

WMcNeill/cjg

IBarnes

LJCallan

JLMilhoen

</: /89

./ /89

/ /89

7 //' /89

?

*previously concurred:

/fa

\\

8909140267 890?ll

PDR

ADOCK 05000458

\\

FDC

Q

. c

gg:gr ,

.

p.

.

,

.

Jr ,

R

= . L ., .

, 3ll(.R ' < .

+'

V

h, ,

Wp

,.

e

-

g:

.

-

a

-

1,o ,

_ . , . ,

,

,

g

'z

,:*-.

L

. . .1. is

,

,

'

j. i('

'

,y.

N"

' Gulf States Utilities'

' 2 --

-

u

, ( ' 1!

!: '

'

,

,

1.

. Gulf States Utilities"

.

-

ATTNi LestEngland,-^ Director

t

'

1.' Nuclear Licensing - RBNG

'

' LP.O. Box 220

'

! .v. 3

.

St.Francisville,L'o01siana 70775-

)

'

lg

.9

_

J

' Louisiaha State University',

Y

Government Documents Department.

,'

~.

,

K

Louisiana Radiation.Contrc1" Program Director

v

7

. .

,

,

,

bectoDMB;(IE01)

. bcc distrib..by RIV:

..

'

DRP.

RRI

n;c

R.:D. Martin..-RA'

SectionChief'(DRP/C)

Lisa Shea,'RM/ALF

MIS System

~'

'

RPB-DRSS

RSTS Operator

Project _ Engineer (DRP/C)

RIV File

'W. Paulson, NRR Project Manager'(MS:

13-D-18)

.

.. ;

DRS.

N

'i

1. Barnes..

W. ' McNeill'.

L

il

..(

e,

a

P

,'t

k

.

,

^I

.

,,

'*

.

-i

4

!

J

l

9

-

_-

a

_ _ _ _ _ _ _ _ - -

.;

i i . l ,'

~

,

',Q }g

xg

~'

GULF STATES

UTILXTIES

COMPANY

~.u - m

,

n

August 11, 1989

RBG-31351

File Nos. G9.5, G15.4.1

-

_

U. S. Nuclear Regulatory Commission

$bb

Document Control Desk

)!

Washington, D.C.

20555

gl8@

Gentlemen:

al

-

River Bend Station - Unit 1

Refer to: Region IV

Docket No. 50-458/89-27

Pursuant to 10CFR2.201, this letter provides Gulf States Utilities

Company's (GSU) response to the Notice of Violation for NRC Inspection

Report No.

50-458/89-27. The inspection was performed by Messrs. W.

M. McNeill and D. L. Kelley during the periods of June 5-9 and 19-23,

1989 of activities authorized by NRC Operating License NPF-47 for

River Bend Station - Unit 1.

GSU's response to the violation is

provided in the attachment. GSU's response to this item ,is complete.

Should you have any questions, please contact Mr. L. A. England at

(504) 381-4145.

Sincerely,

m

J. C. Deddens

Senior Vice President

[

River Bend Nuclear Group

JCD/JEB/LAE/lgkRG/'F/JLB/ch

Tf

h

Attachment

cc: U. S. Nuclear Regulatory Commissicn

Region IV

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

Senior Resident Inspector

P.O. Box 1051

St. Francisville, LA 70775

f-89-2i4

ff

-

_

_--

+

-

t,

.,plo

^

-

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

STATE OF LOUISIANA

)

PARISH OF WEST FELICIANA

)

Docket No. 50-458

In'the Matter of

)

GULF STATES UTILITIES COMPANY

)

(River Bend Station - Unit 1)

AFFIDAVIT

J.

C.

Deddens,

being

duly

sworn,

states that he is a

Senior Vice President of Gulf States Utilities

Company;

that

he

is authorized on the part of said_ company to sign and file

with the Nuclear Regulatory Commission the documents

attached

hereto;

and

that

all such documents are true and correct to.

the best of his knowledge, information and belief.

.

/

hew

J. CT Deddens

Subscribed and sworn to before me, a Notary Public in

and

for

the

State

and

Paris.h

above named, this ,_//'

, day of

h/, W

19 k .

My Commission expires with Life.

,

,_

A

e

- - .Claud2.a F.

Hurst

Not.*.ry Public in and for

West Feliciana Parish, Louisiana

_-__--_____________-_m

m,

{i *

'

,. . y

-

ATTACIMENT

RESPONSE TO NOTICE OF VIOLATION 50-458/8927-01

LEVEL IV

i

REFERENCE

Notice of Violation - Letter from J. L. Milhoan to

J.

C.

Deddens, dated

July 17, 1989.

FAILURETOREVIEWSAFETYQUESTIONSASSOCIATEDWITHMODIFICATIOM

Technical

Specifications

(TS) Section 6 established the requirements for

the FRC and NRB and the requirements for these groups to review various

'

activities.

Section

6.5.1.6 requires FRC to be responsible for review of

all modifications to structures, components, systems, or equipment that

l

affect nuclear safety. Section 6.5.3.7 requires NRB to be responsible for

the review of safety evaluations for changes to equipment or systems

completed under the provision of 10CFR50.59 to verify that such action did

not constitute an unreviewed safety question.

Contrary to the above, the FRC and NRB had not reviewed the activities

required by TS.

FRC reviewed only 12 modification requests (MRs) of a

sample of 19 facility changes described in the 1987-1988 annual

10CFR50.59

report.

NRB reviewed only 17 safety evaluations associated with the same

sample of changes identified above.

REASON FOR THE VIOLATION

Regarding the FRC, the River Bend Station Safety Analysis Report (SAR),

paragraph 13.4.1.5 stated,

"The FRC is responsible for ... review of all

proposed permanent modifications to safety-related structures, systems, and

l

components."

NUREG-0989,

" Safety Evaluation Report related to the

,

Operation of River Bend Station," section

13.4.1,

" Facility

Review

)

Committee," concludes "The FRC responsibilities also cover the appropriate

1

area of responsibility." Administrative Procedure (ADM)-0002, " Charter of

l

the

FRC,"

fn section 5.11.4 states, "The FRC is responsible for the ...

I

review of all

proposed changes to structures, components, systems or

equipment that affect nuclear safety." To date, the FRC has only reviewed

3

those modifications that are classified as safety-related.

A memorandum

'

issued in August 1985 by the FRC Chairman and the Plant Manager stated,

"Unless specifically requested by the Plant Menoger,

the FRC need not

review non-safety related charges, changes to the fire protection systems,

or changes to the radwaste systems."

Regarding the NRB, until August 1987, an unreviewed safety question

determination (USQO) was performed on all MRs. At that time, the Initial

!

Safety and Environmental Evaluation (ISEE) program was initirted to answer

appropriate screening questions to determine

if a USQD is required in

c

accordance with 10CFR50.5?.

The 10CFRSC.59 safety

evaluations

for

i

permanent plant modifications are reviewed by the Unrev f wed Safety

-

I

Question Committee (USQC). The USQC is appointed by the Nuclear Review

Board (NRB) to conduct the post-reviews required by Technical Specification , (TS) 6.5.3.7.

The USQC is comprised of members from the Independent Safety

Page 1 of 2

1

-__-

-

.-

$ngineering Group (ISEG). The NRB chartered the USQC during initial plant

'

start-up in late 1985.

Subsequently, a number of changes have been

implemented

in the MR process.

As the USQC. became aware of the

implications of these programmatic changes,.the USQC review methods were

also changed.

For example, the USQC Chairman requested Design Engineering

to send the USQC copies of Field Change Notices-(FCN) to MRs and USQDs, as

well as,

initial MRs.and USQDs. . This was done to ensure that changes and

revisions to MRs did not invalidate the 10CFR50.59 reviews contained in the

USQDs.

This request was made when it was realized that review of FCN and

USQD revisions were not included in the.USQC's original methods. . Evidence-

exists that the USQC has reviewed a significant majority of completed MRs

with USQDs.

The root cause for the violation was the lack of USQC reviews of FCNs and

USQD revisions early in River Bend Station's operating history and a

defined responsibility in the RBS SAR for FRC review to be different than

the inspectors inspection criteria. The failure to perform a 100 percent

review'of USQDs was due to the evolving nature of the MR program.

CORRECTIVE ACTIONS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED

Of'the 19 facility changes described in the 1987-1988 annual

10CFR50.59

report, GSU has found that eleven were reviewed and approved by the FRC.

The remaining eight modifict. tion requests (MRs) were either classified as

non-safety related or did not result in a physical modification of the

plant.

The USQC has commenced efforts to ensure its computerized database of

reviewed documents is up-to-date. This includes the entry of all documents

reviewed and listed in USQC meeting minutes prior to June 1988.

CORRECTIVE ACTIONS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS

ADM-0002, " Charter of the FRC," will be modified to. include the review of

all proposed changes or modifications to structures, components, systems or

equipment, changes to procedures, or tests and experiments described in the

USAR which results in an USQD performed in accordance with 10CFR50.59 to

the responsibility of the FRC.

Reference to the reviewed USQDs will

be

noted in the FRC meeting minutes and sent to the USQC Chairman for the

RM/USQC review in accordance with TS 6.5.3.7.

The expanded USQC database will be compared to the list of sli USQDs for

Ws .

Any USQDr. which have not received a USOC review will be reviewed in

accordance with TS 6.5.3.7.

Use of a task force for this will be

,

i

considered if the increase in USQC workload causes a significant impact on

other ISES duties.

DAl'E WHEN FULL COMPLIANCE WILL BE ACHIEVED

A0M-0002 will be revised by September 30, 1989.

The USQC database update will be completed by October 31, 1989.

The USQC review of backlogged USQD's of unreviewed MRs will be completed by

December 15, 1989.

Page 2 of 2