ML20217L768
| ML20217L768 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/19/1999 |
| From: | Johnson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20217L771 | List: |
| References | |
| 50-458-99-12, NUDOCS 9910270069 | |
| Download: ML20217L768 (5) | |
See also: IR 05000458/1999012
Text
.
%
[p $s ra%
t
UNITED STATES
t
NUCLEAR REGULATORY COMMISSION
-
li
?,
E
1
REGloN IV
D
[
611 RYAN PLAZA DRIVE, sulTE 400
q
ARLINGTON, texas 760118064
g
OCT l 9 l999
Randal K. Edington, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-12
Dear Mr. Edington:
This refers to the inspection conducted on August 22 through October 2,1999, at the River
Bend Station facility. The enclosed report presents the results of this inspection.
Based on the results of this inspection, the NRC has determined that four Severity Level IV
violations of NRC requirements occurred. The violations are being treated as noncited
violations (NCVs), consistent with Appendix C of the Enforcement Policy. The NCVs are
described in the subject inspection repoi!. If you contest the violations or severity level of the
NCVs, you should provide a response within 30 days of the date of this inspection report, with
the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control
Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear
Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,
the Director, Office of E:nforcement, United States Nuclear Raoulatory Commission,
Washington, DC 20555-0001, and the NRC Resident inspects e-
the River Bend Station
facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if requested, will be placed in the NRC Public Document
Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
\\
LOT
\\\\
William . Johnson, Chief
Project Branch B
Division of Reactor Projects
l
I
Docket No.:
50-458
l
License No.: NPF-47
i
l
9910270069 991019
i
ADOCl( 05000458
G
!
F~
j
-.
3.
l
,-
Entergy Operations, Inc.
-2-
Enclosure:
NRC inspection Report No.
50-458/99-12
cc w/encloe !re:
3
l
Executive Vice_ President and
I
l
Chief Operating Officer
l
Entergy Operations, Inc.
l
L
P.O. Box 31995 '
L
Jackson, Mississippi 39286-1995
'
-.
Vice President
,
'
Operations Support
.
Entergy Operations, Inc.
l-
P.O. Box 31995
l
' Jackson, Mississippi 39286-1995
<
. General Manager l
Plant Operations
River Bend Station .
!~
Entergy Operations, Inc.
'
P.O. Box 220
l
St. Francisville, Louisiana 70775
J
l.
Director - Nuclear Safety
. River Bend Station
i
,
,
Entergy Operations, Inc.
l
P.O. Box 220
l
St. Francisville, Louisiana 70775 -
t
Wise, Carter, Child & Caraway '
,
l
P.O. Box 651 -
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
- Winston & Strawn
1401 L Street, N.W.
j
l
. Washington, DC 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
t
l
l
a
--
...
,
,
.
Entergy Operations, Inc;
-3-
,
'The Honorable Richard P. leyoub
' Attorney General.z
'.' Department of Justice
State of Louisiana -
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
- Baton Rouge, Louisiana .70806
. ..
~ President
West Feliciana Parish Police Jury'.
P.O. Box 1921
- .St. Francisville, Louisiana 70775
' Ronald Wascom, Administrator
and State Liaison Officer
Department of Environmental Quality
l
P.O. Box 82135
Baton Rouge, Louisiana - 70884-2135
)
i
i
l
1
'.
.
Entergy Operations, Inc.'
-4 .
-
OCT I 91999
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01) -
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
,
l DRS Director -
RITS Coordinator
!
Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
I
L
l
,
i
DOCUMENT NAME: R:\\_RB\\RB912RP,TWP
To receive copy at document, Indicate in box; "C" = Copy without encipsiures "E" = Copy with enclosures "N" = No copy
- -
RIV:RI:D$P/@
_ SRI:DRP/$ M, DDRP/B j
1
'
NPGarretl7An\\F TWPruet@ff,lEW WDJohnsfri
Vi
10/$99. "
10f%99 "
,108/99
- OFFICIAL RECORD COPY
i
i
i
g_.
'
..
5'
-
'i
Entergy Operations, Inc.
-4-
f'
OCT l 91999
E
E-Mail' report to D. Lange (DJL)
E-Mail report to NRR Event Tracking Systen (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
,
E-Mail report to Richard Correia (RPC)
,
~
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)~
bec distrib. by RIV:
Regional Administrator
Residsit ins >ector
DRP Director
RiV Fils
DRS Director
RITS Coordinator
Branch Chief (DRP/B).
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_RB\\RB912RP.TWP
To receive copyaf. document, Indicate in Dox; "C" = Copy wthout enciMtires "E" = Copy with enclosures "N" = No copy
RIV:RI:DRP/S.-
_SRl:DRP/h l/, D:DRP/B j
NPGarrethb\\# TWPruet@(74,)RW WDJohns6s
,10(4/99 s' '
10/ff99
104%99 "
'
OFFICIAL RECORD COPY
i
270009
- - - -