ML20215L104
| ML20215L104 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/24/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20215L106 | List: |
| References | |
| NUDOCS 8610280471 | |
| Download: ML20215L104 (2) | |
See also: IR 05000458/1986027
Text
r
.
.
OCT 2 41956
In Reply Refer To:
Docket:
50-458/86-27
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President,
River Bend Nuclear Group
P. O. Box 220
St. Francisville, Louisiana 70775
Gentlemen:
This refers to the inspection conducted by Messrs. D. D. Chamberlain, W. B.
Jones, and W..R. Bennett of this office during the period August 1 through
September 15, 1986. of activities authorized by NRC Operating License NPF-47
for River Bend Station, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included review of Licensee Event
Reports (LERs), licensee action on IE Notices, startup test result evaluation,
safety system walkdown, surveillance witnessing, maintenance witnessing,
operational safety verification, followup on allegations, and in-office review
of written reports of non-routine. events at power reactor facilities. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
inspectors. The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
.
Sincerely,
Oridnal Signed By'
$0]g
gg@$j58
J. E. Gagilardo
j,h
J. E. Gagliardo, Chief
g
Reactor Projects Branch
(
Enc o res: (see n
- age)
,
i
EC k
SJ :RPB/A
R:'RP /A
PI:RPB/Appf
CRBA
C:RPB d
hDChamberlaihWJones
WRBennett
JPJaudon
MEEmerson JEGagliardo
g/ b/86
/0/p /86
4/u./86
jo//t)/86
4/9/86
/d/23 ,861
f
l
/
1
(.
-
,
.
.
.
s
.
.
Gulf States Utilities
-2-
.
.
Enclosures:
1.
Appendix A - Notice of Violation
,
2.
Appendix B - NRC Inspection Report
50-458/86-27
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- SectionChief(RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- W. R. Bennett
- R&SPB
- RIV File
M. E. Emerson, RIV
- w/766