ML20247R264
| ML20247R264 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/28/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20247R268 | List: |
| References | |
| RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 8908070416 | |
| Download: ML20247R264 (2) | |
See also: IR 05000458/1989028
Text
__
~
,
.
.
-
.
JUL 281989
In Reply Refer To:
Docket: 50-458/89-28
Gulf. States Utilities.
ATfN: Mr. James C. Deddens
1 Senior Vice President (RBNG)
P.O. Box 220
St. Francisv111e, Louisiana 70775
g
Gentlemen:
. This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones
.of this< office during the period June 1-30, 1989, of activities authorized by
NRC Operating License NPF-47 for River Bend Station, and to the discussion of
our findings with you and other members of your st 'f at tne conclusion of the
inspection.
Areas examined during the inspection included followup of events, operational
safety verification, and maintenance and surveillance test observation. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspectors. The inspection findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of ynor activitics were in
violation of NRC requirements. Consequently, you ara required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in tne Notice of
Violation enclosed with this letter.
In addition, it was found that while certain other activities were in violation
of NRC requirements, you had identified the problems and were taking
appropriate corrective actions within a reasonable period of time.
Because the
NRC wants to encourage and support licensee initiative for self-identification
and correction of problems, a Notice of Violation will not be issued on this
item. This action is being taken in accordance with Appendix C,
paragraph V.G.1, of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 7 of the enclosed report.
890B07o416 8907ps
+
R
G
ADOCK 05000458
PNuc
- RIV: SRI
- RI
- C:DRP/C
D RP
/
EJFord
WBJones
GLConstable
JLMil can
01
/ /89
/ /89
/ /89
1/q, 89
pht
l
- previously. concurred
i
_-
_-_-_-
- _ _ _ _ .
t
. ' *-
-
.
- .
3
,
'
.
Gulf States Utilities'
-2-
'Should you'have any questions concerning this. inspection, we will be pleased to
' discuss them with you.
Sincerely.
Original Signed By:
James L. Milhoan
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
' Appendix - NRC Inspection Report
50-458/89-28
-cc w/ enclosure:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
River Bend Oversight
P.O. Box 2951
Beaumont, Texas 77704
' Gulf States Utilities
-ATTN:
Les England Director
Nuclear Licensing - RBNG
P.O. Box 220
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
Louisiana. Radiation Control Program Director
bcctoDMB'(IE01)
bec 'distrib. by RIV:
~
- RRI
- R. D. Martin, RA
- Section Chief (DRP/C)
Lisa Shea, RM/ALF
- MIS System
- RPB-DRSS
- RSTS Operator
'* Project Engineer, DRP/C
- RIV File
- W. Paulson, NRR. Project Manager (MS: 13-D-18)
- DRS'
- w/766-
l
l
'
,
')