ML20195D604

From kanterella
Jump to navigation Jump to search

Discusses EOI Request That Attachment 4,NEDC-32549P, Safety Review for River Bend Station Cycle 7 Final Feedwater Temp Reduction, Rev 0,be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld
ML20195D604
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/03/1999
From: Robert Fretz
NRC (Affiliation Not Assigned)
To: Edington R
ENTERGY OPERATIONS, INC.
References
TAC-MA1594, NUDOCS 9906090219
Download: ML20195D604 (4)


Text

___ ______ __ _ _ _________

. .- .i.'

A Cfr ug a 'N1 UNITED STATES f j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

,o June 3, 1999 Mr. Randall K. Edington Vice President - Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION (RBS), UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MA1594)

Dear Mr. Edington:

By Entergy Operations, inc's. (EOl's), application dated April 9,1998, and General Electric Company's (GE's) affidavit dated May 5,1997, executed by George B. Stramback, EOl submitted an application for amendment on " Final Feedwater Temperature Reduction Analysis,"

and requested that Attachment 4, NEDC-32549P, " Safety Review for River Bend Station Cycle 7 Final Feedwater Temperature Reduction," Revision 0, be withheld from public disclosure pursuant to 10 CFR 2.790.

On January 13,1999, EOI submitted Revision 1 to Attachment 4, dated October 1998 that contains additional information regarding the feedwater nozzle fatigue evaluation as well as 4 changed the report sections containing GE-proprietary information. The January 13,1999, submittal superceding Revision 0 to Attachment 4, also provided GE's affidavit dated October 15,1998, executed by George B. Stramback, and requested that Attachment 4, NEDC-32549P, " Safety Review for River Bend Station Cycle 7 Final Feedwater Temperature Reduction," Revision 1, be withheld from public disclosure pursuant to 10 CFR 2.790. The information considered proprietary by GE is identified in Attachment 4 by enclosing the phrase with cingle brackets (e.g., "[ GENE proprietary information]").

The October 15,1998, affidavit stated that the submitted information should be considered exempt from mandatory public disciosure for the following reasons:

(4) a. [The] information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by. General Electric's competitors without license from -

General Electric constitutes a competitive economic advantage over other companies.

b. [The] information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

(8) The information...is classified as proprietary because it contains detailed results of analytical models, methods and processes, including computer codes, which GE has developed, obtained NRC approval of, and applied to 9906090219 990603 PDR ADOCK 05000458 L P PDR E _ _ _ _ _ _ _ _ _ _ _

q . (,

R. K. Edington perform evaluations of different plant conditions and parameters for the l BWRs [ boiling water reactors).

The development and approval of the BWR models, methods, processes and computer codes was achieved at a significant cost, on i the order of a million dollars, to GE. I The development of the evaluation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.

We have reviewed your application and the material in accordance with the requirements of ,

10 CFR 2.790 and, on the basis of your statements, have determined that the submitted j information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Attachment 4, NEDC-32549P, " Safety Review for

' River Bend Station Cycle 7 Final Feedwater Temperature Reduction," Revision 1, marked as

. proprietary (e.g., "[ GENE proprietary information]"), will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as '

amended.- The original report, Attachment 4, Revision 0, will be destroyed in accordance with EOl's and GE's request detailed in a May 18,1999, telephone call between Ms. Patricia Campbell, EOi, and R. J. Fretz, NRR Project Manager.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the i consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should

- promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that i

. the NRC may have cause to review this determination in the future, for example, if the scope of  ;

a Freedom of Information Act request includes your information. In all review situations, if the

- NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1324.  ;

. Sincerely, )

/ ,

Robert J. Fretz, Project Manager, Section 1 Project Directorate IV & Decommissioning

Division of Licensing Project Management-
Office of Nuclear Reactor Regulation Docket No. 50-458 - .

cc: See next page

r,

" June 3,1 999

' a ' R. K. Edington perform evaluations of different plant conditions and parameters for

' the BWRs [ boiling water reactors).

The development and approval of the BWR models, methods, processes and computer codes was achieved at a significant cost, on the order of a million dollars, to GE.

The development of the evaluation process along with the interpretation and application of the analytical results is derived from

.the extensive experience database that constitutes a major GE asset.

'We have reviewed your application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be

~ withheld from public disclosure. Therefore, Attachment 4, NEDC-32549P, " Safety Review for River Bend Station Cycle 7 Final Feedwater Temperature Reduction," Revision 1, marked as proprietary (e.g., "[ GENE proprietary information]"), will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. The original report, Attachment 4, Revision 0, will be destroyed in accordance with EOl's and GE's request detailed in a May 18,1999, telephone call between Ms. Patricia Campbell, EOl, and R. J. Fretz, NRR Project Manager.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this

'information to our consultants working in this area. We will, of course, ensure that the

. consultants have signed the appropriate agreements for handling proprietary information. I If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. in all review situations, if the . Il 7)

NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

' f you have any questions regarding this matter, I may be reached at (301) 415-1324.

I Sincerely, ORIG. SIGNED BY y., , ,_ . Robert J. Fretz, Project Manager, Section 1 0 ~' >; Project Directorate IV & Decommissioning Division of Licensing Project Management

Office of Nuclear Reactor Regulation

, Docket No. 50-458  : DISTRIBUTION!

SughgMW3 '

PUBLIC : PD4-1 r/f OGC cc: See next page M. P. Siemien K. Brockman ACRS' DOCUMENT NAME: G:\PDIVJ1\RiverBend\LTRA1594.WPD -

To receive e cop r of his document, hdicate in he box C= Copy w/o attachment /erriosure E. Copy with attachment / enclosure N = No copy OFFICE ? PM/PDIV-in E LA/PDIVdr E SRXB , E: OGC- h SC/PDIV-1 O NAME RFretz:db h LBerry, ' b ~ JW M il" MPSiemidh RGramrh DATE f / S) /99 h/ /99 . [/ f /99 ( 5/ h /99 h/ V /99 OFFICIAL RECORD COPY-

]lY

r

', e'.

Mr. Randall K. Edington Entergy Operations, Inc. River Bend Station cc: l l'

Winston & Strawn Executive Vice President and 1400 L Street, N.W. Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Station General Manager - Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bead Station '

P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

President of West Feliciana River Bend Station ,

Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Suppert Regional Administrator, Region IV Entergy Operations, Inc.

U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attorney General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive Pc O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095

' Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 ,

P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135 i

i 1

1 j

L j