Forwards Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted
ML20248A305
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/26/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20248A309 List:
References
NUDOCS 8910020180
Download: ML20248A305 (2)


See also: IR 05000458/1989033

Text

- _ _ - _ _ _ _ _ _ _

,.

f.

l b .. l .

"

SEP 26 919

.

In Reply Refer To:

,

' Docket: 50-458/89-33

Gulf States Utilities

ATTN: Mr. James C. Deddens

SeniorVicePresident(RBNG)

P.O. Box 220

St. Francisville, Louisiana 70775

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Ford, W. B. Jones, and

G. L. Madsen of this office during the period August 1-31, 1989, of activities

authorized by NRC Operating License NPF-47 for River Bend Station, and to the

discussion oi' our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included followup of events, operational

safety verification, maintenance observation, surveillance test observation,

licensee event report followup, followup on 10 CFR Part 21 reports, and

followup.on NRC information notices. Within these areas, the inspection

consisted of selective examination.of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection ~ report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is ider.tified in

paragraph 10 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OriginalSigned By:

Thomas P. Gwynn

James L. Milboan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-458/89-33

s /

  • RIV: SRI * RI * DRP/C D RP

EJFord WBJones GLConstable LMilhoan i

/ /89 / /89 / /89 #/ /2c/89 jh\

  • previously concurred y$

/

\

8910020100 890926

POR ADOCK 05000458

G PNU

- _ - - _ _ _ - - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ - _ _ _ _ _ _ _ _ _ _______ - _ _ __ _ _ _ _____ _

q7-

-

. -- - - - -

.

,

,

y .,

'-', , m

gi[,l4 i -

F ih >

' Gulf' States Utilities Company ' -2-

.

-

cc w/encitiure:

Gtif States Utilities

Al ni: J. E. Booker, Manager-

- River Bend Oversight

P.0LBox-2951-

8eaumont, Texas: 77704

~

Gu1f States Utilities

ATTN: . Les England, Director

Nuclear Licensing '-- RBNG

" c-

,

, P.O. Box 220

St. Francisville,' Louisiana 70775

,

Louisiana State University,.

Government Documents. Department

. Louisiana Radiation Control . Program Director

bec to DMB (IE01)

bcc distrib. by RIV:-

1*DRP- *RRI

  • R.LD. Martin, RA- *SectionChief(DRP/C)

Lisa Shea, RM/ALF * MIS System

  • RPB-DRSS *RSTS Operator

4 * Project Engineer (DRP/C) *RIV File

  • W. Paulson, NRR Project Manager (MS: 13-D-18)
  • DRS
  • w/766

,

p

i

-

_.----_-----_-_.______-_____.___m.___,__ _ _ _ _ , _ _