ML20216F788
| ML20216F788 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/15/1999 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20216F792 | List: |
| References | |
| 50-458-99-10, NUDOCS 9909240110 | |
| Download: ML20216F788 (5) | |
See also: IR 05000458/1999010
Text
I.
,
p* "84
UNITED STATES
9
j
'
/
t
NUCLEAR REGULATORY COMMISSION
?,
i
l7,
j
e
REGloN IV
?
l
611 RYAN PLAZA DRIVE, sulTE 400
ARLINGTON, TEXAS 76011-8064
,, g
SEP 151999
Randal K. Edington, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC REQUALIFICATION TRAINING INSPECTION REPORT NO. 50-458/99-10
Dear Mr. Edington:
This refers to the inspection conducted on August 30 through September 3,1999, at the River
Bend Station facility. This inspection covered your licensed operators' requalification training
J
program and observation of requalification activities. The enclosed report presents the results
of this inspection,
j
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
j
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
l
!
John L. Pe!!et, Chief
Operations Branch
Division of Reactor Safety
Docket No.:
50-458
License No.: NPF-47
Enclosure:
NRC Inspection Report No.
50-458/99-10
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
f
Jackson, Mississippi 39286-1995
I
l
,
'
I
9909240110 99o915
{DR
ADOCK 05000458
,
<
>
-
..
,
.
Entergy Operations, Inc..
-2-
. Vice President
. Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson,' Mississippi 39286-1995-
General Manager .
Plant Operations
River Bend Station
- Entergy Operations, Inc.
P.O. Box 220 :
St. Francisville, Louisiana 70775 -
' R. Azzarello, Manager Training and
)
Entergy Operations. Inc.
' P.O. Box 220
St. Francisville, Louisiana 70775
1
Director - Nuclear Safety
)
. River Bend Station
Entergy Operations, Inc.
.
P.O. Box 220
St. Francisville, Louisiana 70775
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J.- Wetterhahn, Esq.
- Winston & Strawn
1401 L Street, N.W.-
' Washington, D.C.- 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
- The Honorable Richard P. leyoub
Attorney General
- Department of Justice
- State of Louisiana
,
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005'
.
-
.
.
Entergy Operations, Inc.
-3-
H. Anne P'ettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
.
I
President of West Feliciana
i
Police Jury
P.O. Box 1921
- St. Francisville, Louisiana 70775-
Ronald Wascom,"^dministrator
Louisiana Radiation Protection Division
P.0, Box 82135
Baton Rouge, Louisiana 70884-2135
.
1
.
' Entergy Operations, Inc.
-4-
l
E-Mail report to T. Frye (TJF)
l
E Mail report to D. Lange (DJL)
l
E-Mail report to NRR Event Tracking System (IPAS)
l
E-Mail report to Document Control Desk (DOCDESK)
l
l
bec to DCD (IE01) (IE42)
l
!
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
!
RIV File
l
DRS Director
RITS Coordinator
l
Branch Chief (DRP/B)
i
Project Engineer (DRP/B)
D. Trimble (HOLB)
L. Hurley (LOA)
'
Branch Chief (DRP/TSS)
!
1
!
l
l
l
l
l
DOCUMENT NAME: R:\\_RB\\RB910rp.hfb.wpd
l
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copmth enclosures "N" = No copy
i
RIV:SRE:OB
E
SRE:OB
E_ C:OB
M
C:PBB( k
C:OB
l
HBundy/Imb 99dlb
MMurphf]fV/ JPellet
J
WJohnsif
JPellet
09/IV/99
09/;3/99'
09/M99 F
09/ 799'
09/rs/99
OFFICIAL RECORD COPY
l
1
.
O
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
' E-Mail report to Document Control Desk (DOCDESK)
bec to DCD ($(IE42)
bec distrib. by RIV:
Regional Administrator
Resident inspector -
DRP Director
RIV File
DRS Director
~ RITS Coordinator
Branch Chief (DRP/B)
Project Engineer (DRP/B)
D. Trimble (HOLB)
i
L. Hurley (LOA)
Branch Chief (DRP/TSS)
'
i
)
\\
\\
DOCUMENT NAME: R:\\_RB\\RB910rp.hfb.wpd
(
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy 1%th enclosures "N" = No copy
RIV:SRE:OB
E
SRE:OB
E
C:OB
A/
C:PBB( kl
C:OB
HBundy/Imb 9pf@
MMurphyJW'/ JPeligt
J
WJohnsdA
JPellet
09/IV/99
09/S/99'
09/N99 W
09/l799~
09/ > /99
OFFICIAL RECORD COPY
,.,,~
n
j4b
'
o
,
h-