ML20211Q392
| ML20211Q392 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/08/1999 |
| From: | Johnson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20211Q396 | List: |
| References | |
| 50-458-99-08, NUDOCS 9909150057 | |
| Download: ML20211Q392 (5) | |
See also: IR 05000458/1999008
Text
- " "'4e
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
.
0
3
.
g
j
REGloN IV
[
'
611 RYAN PLAZA DRIVE, sulTE 400
,,,g
ARLINGTON, TEXAS 76011-8064
SEP - 81999
7
.
(
Randal K. Edington, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
--
P.O. Box 220
-
St. Francisville, Louisiana 70775
-
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-08
Dear Mr. Edington:
This refers to the inspection conducted on July 11 through August 21,1999, at the River Bend
Station facility. The enclosed report presents the results of this inspection.
Based on the results of this inspection, the NRC has determined that one Severity Level IV
violation of NRC requirements occurred. The violation is being treated as a noncited
violation (NCV), consistent with Appendix C of the Enforcement Policy. The NCV is described
in the subject inspection report. If you contest the violation or severity level of the NCV, you
should provide a response within 30 days of the date of this inspection report, with the basis for
.
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear
Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011
"
the Director, Office of Enforcement. United States Nuclear Regulatory Commission,
Washington, DC 20555-0001; and the NRC Resident inspector at the River Bend Station
facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if requested, will be placed in the NRC Public Document
.._
Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
r~
William D. Johnson, Chief
Project Branch B
Division of Reactor Projects
-
Docket No.:
50-458
License No.: NPF-47
9909150057 990908
ADOCK 05000458
-
G
_ . . . ..
,
...
.
"
Entergy Operations, Inc.
-2-
)
Enclosure:
'
NRC inspection Report No.
50-458/99-08
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
= Jackson, MissiWppi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station -
Entergy Operations, Inc.
P.O. Box 220
St.' Francisville, Louisiana 70775
Director - Nuclear Safety -
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
W'se, Carter, Child & Caraway
P.O. Box 651
~ Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
I
_
8
i
1
-
1
i
-
Enterr Operations,Inc.
-3-
1
The Honorable Richard P. leyoub
'
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
Ronald Wascom, Administrator
Louisiana Radiation Protection Division
i
P.O. Box 82135
i
Baton Rouge, Louisiana 70884-2135
i
'
l
'
1
-
Entergy Operations, Inc.
-4-
SEP - 8 1999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
t
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
'
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
'
DRS Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
l
!
i
!
1
!
f
DOCUMENT NAME: R:\\_RB\\RB908RP.NPG
To receive copy of document, Indicate in box: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RI:DRMB,
$F31:l6RP/B
C:DRP/B
fl
NPGarrett M/n
ME$urphy
WDJohnsoW
9/6 /99 4 J con
9/ / W 9 n%# 9/ O /99 '
OFFICIAL RECORD COPY
.
4
9 ~ ry
1
i
Entergy Operations, Inc.
-4-
SEP - 8 1999
j
l
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
l
,e
.
'
>
l
DOCUMENT NAME: R:\\_RB\\RB908RP.NPG
l
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
l
RIV:RI:DRFNB, l
$81:%RP/B
C:DRP/B f)
l
l
l
NPGarrett Mn
MElblurphy
WDJohnsod/
1
l9/6 /99 -dlJ co A
9/ / Y99
ri ;,,pd
9/ 0 /99 ~
O
OFFICIAL RECORD COPY
,