Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817
ML20210K464
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/03/1999
From: Robert Fretz
NRC (Affiliation Not Assigned)
To: Edington R
ENTERGY OPERATIONS, INC.
Shared Package
ML20210K467 List:
References
GL-95-07, TAC-M93511, NUDOCS 9908060129
Download: ML20210K464 (3)


Text

'

)

August 3, 1999 Da(>/d - j Mr. Randall K. Edington I 4(/f 1 I

Vice President - Operations Entergy Operations, Inc.

River Bend Station j P. O. Box 220 I St. Francisville, LA 70775 j

SUBJECT:

RIVER BEND STATION, UNIT 1 - SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER 95-07, " PRESSURE LOCKING AND THERMAL BINDING OF SAFETY- RELATED POWER-OPERATED GATE VALVES" (TAC NO. M93511)

Dear Mr. Edington:

i On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

In a letter of February 13,1996, Entergy Operations, Inc. (EOI), submitted its 180-day response to GL 95-07 for River Bend Station, Unit 1. The NRC staff reviewed the submittal and requested additional information in a letter dated May 20,1996. In a letter of June 28,1996, EOl provided the additional information.

The NRC staff has reviewed the original response and subsequent information. The staff finds that EOl has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed Safety Evaluation.

Sincerely, ORIG. SIGNED BY Robert J. Fretz, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 EMR r

Enclosure:

Safety Evaluation ' mr CENTER cap- /

cc w/ encl: See next page DISTRIBUTION:

Docket File K.Brockman, RIV OGC fOI PUBLIC ACRS R.Scholl (e-mail SE only)

PDIV-1 Reading S.- Tingen S. Richards (cover ltr only)

DOCUMENT NAME: G:\PDIV-1 \RiverBend\G L9507-M93511.wpd To receive a copy of mis document, indicate "C" in the box OFFICE PDIV-1/PM PDIV-1/LA y N EMSB y E PDIV-1/SC b NAME R.Fretz h '

L. Berry (/h D.Terack ' R.Gramm h DATE 7 / 7[ /99 ' f / Ik/99 \ N / * /99 i / 3 /99

( OFFICIAL RECORD COPY

~

9900060129 990003 PDR ADOCK 05000458 p PDR

r e

Q Ct:

p 4 UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20656 4001

'4 4 . . . . . ,d August 3, 1999 Mr. Randall K. Edington Vice President - Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER 95-07," PRESSURE LOCKING AND THERMAL BINDING OF SAFETY- RELATED POWER-OPERATED GATE VALVES" (TAC NO. M93511)

Dear Mr. Edington:

On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

In a letter of February 13,1996, Entergy Operations, Inc. (EOl), submitted its 180-day response to GL 95-07 for River Bend Station, Unit 1. The NRC staff reviewed the submittal and requested additional information in a letter dated May 20,1996. In a letter of June 28,1996, EOl provided the additional information.

The NRC staff has reviewed the original response and subsequent information. The staff finds that EOl has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed Safety Evaluation.

Sincerely, Robert J. Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 l

Enclosure:

Safety Evaluation cc w/ encl: See next page l

t

p-1-

1 4

i River Bend Station cc:

l Winston & Strawn Executive Vice President and 1400 L Street, N.W. Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Station General Manager - Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station P. O. Box 220 '

Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support l Regional Administrator, Region IV Entergy Operations, Inc.  !

U.S. Nuclear Regulatory Commission P. O. Box 31995 l 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 i Arlington,TX 76011  !

Attorney General i Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Louisiana Radiation Protection Division P. O. Box 82135 Baton Rouge, LA 70884-2135 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 l

May 1999

,