ML20210K135
| ML20210K135 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/30/1999 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20210K139 | List: |
| References | |
| 50-458-99-09, EA-99-150, NUDOCS 9908060026 | |
| Download: ML20210K135 (5) | |
See also: IR 05000458/1999009
Text
.
,
d"%g
UNITED STATES
t
e
3
i
NUCLEAR REGULATORY COMMISSION
,
f
REGloN IV
k,
[
611 RYAN PLAZA DRIVE, suite 400
,g
ARLINGTON, TEXAS 76011-8064
,,,g
July 30,1999
EA 99-150
Randall K. Edington, Vice President - Operations
I
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
,
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-09
,
I
i
Dear Mr. Edington:
'
This refers to the inspection conducted May 10 to 28,1999, at the River Bend Station facility,
with followup and inoffice inspection until July 1,1999. The purpose of the inspection was to
review a previous NRC concern relating to testing and cleaning of the auxiliary building unit
coolers. The enclosed report presents the results of the inspection.
Based on the results of this inspection, the NRC has determined that three Severity Level IV
violations of NRC requirements occurred. These violations are being treated as noncited
violations, consistent with Append;x C of the Enforcement Policy. If you contest the violations
)
or severity level of these noncited violations, you should provide a response within 30 days of
the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory
Commission, ATTN: Document Control Desk Washington, DC 20555-0001, with copies to the
Regional Administrator, Region IV, and the Director, Office of Enforcement, United States
Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector
at the River Bend Station.
The findings from this inspection revealed that problems involving the design capability of a
number of safety-related room coolers were not resolved in a timely manner. Specific findings
from this inspection included examples of failing to: (1) resolve room cooler test result
deficiencies; (2) perform adequate operability determinations; (3) initiate condition reports for
conditions adverse to quality; (4) maintain the licensing basis current; (5) make appropriately
conservative judgments regarding the implementation of the Generic Letter 89-13 program; and
(6) sufficiently justify or document engineering conclusions and evaluations.
!
'
l
Other recent NRC inspections have identified instances of failing to resolve long-standing,
safety-related equipment problems (NRC Inspection Report 50-458/98-13) and instances of not
identifying or not documenting long-standing radiological work permit program implementation
'
problems in condition reports (NRC Inspection Report 50-458/98-10). This latter issue will be
I
one of the subjects to be discussed by NRC and Entergy Operations, Inc., during a meeting,
which is scheduled to be conducted in the Region IV Office on August 5,1999.
gR08060026 990730
0
ADOCK 05000458
j
.
.
Entergy Operations, Inc.
-2-
The findings from this inspection, as well as other recently completed NRC inspections, are
indicative of potentially broad-based problems associated with the ability to effectively identify,
analyze, and correct both hardware and programmatic deficiencies. Accordingly, we encourage
you to review the overallimplementation effectiveness of your program and processes for
identifying, analyzing, and correcting problems.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you,
y .
//
Arthur T, Hot e l~
, Direct. "
Division of Rector Safety
Docket No.:
50-458
License No.: NPF-47
Enclosure:
NRC Inspection Report No.
50-458/99-09
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River. Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
_
.
.
- Entergy Operations, Inc.
-3-
!
Director - Nuclear Safety
River Bend Station
l
- Entergy Operations, Inc.
l
P.O. Box 220
St. Francisville, Louisiana 70775
!
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
Manager- Licensing
River Bend Station
. Entergy Operations, Inc.
P.O. Bcx 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H.' Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana -
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
Ronald Wascom, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
,
L
i
l
,
.
.
Entergy Operations, Inc.
-5-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01
bec distrib. by RIV:
!-
Regional Administrator
Resident inspector
l
DRP Director
DRS Director
RITS System
Branch Chief (DRP/B
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
,
Sanborn: EA Files
OE: EA Files (0-14E1)
Lieberman (0-14E1)
i
DOCUMENT NAME: R:\\_RB\\RB909RP.MFR
- see prior concurrence
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV: SRI:EMB
RI:EMB
C:EMB
E
EO yA
C:PBB
D:DRS
..
f
MFRunyan/imb
PAGoldberg
DAPowers*
GS
g
DNGr
s
ATH
V
07/ /99
07/ /99
07/ /99
07/I % 9
07/d/99
07](799
OFFICIAL RECORD COPY
l
j
I~ .ll
.
Entergy Operations, Inc.
-5-
l
t
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)-
E-Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01
l
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS Director
RITS System
Branch Chief (DRP/B
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Sanborn: EA Files
OE: EA Files (0-14E1)
Lieberman (0-14E1)
)
,
i
i
1
a
DOCUMENT NAME: R:\\_RB\\RB909RP.MFR
- see prior concurrence
To receive copy of document, Indicate in box: *C" = Copy without enclosures *E* = Copy with enclosures "N" = No copy _
RIV: SRI:EMB
Rl:EMB
C:EMB
E
et
C:PBB
D:DRS a
MFRunyan/imb
PAGoldberg
DAPowers*
GSptfgtp3
DNGr .ves
ATH
,
07/ /99
07/ /99-
07/ /99
07/lY99
07/1J99
071()99
OFFICIAL RECORD COPY
050024
l
)