Forwards Safety Evaluation Re 861022 Rev 2 to Process Control Program (PCP) & 861022 Response to Request for Addl Info on Rev 1 to Pcp.Program Acceptable on Interim Basis in Conjunction W/Tech Specs
ML20235V164
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/07/1987
From: Kintner L
Office of Nuclear Reactor Regulation
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20235V168 List:
References
TAC-63191, NUDOCS 8710150023
Download: ML20235V164 (2)


Text

'

10ctober ~7,1987 Docket No. 50-416 DISTRIBUTION CDocket:Rijet EJordan I Mr. Oliver D. Kingsley, Jr. NRC & Local PDRs JPartlow Vice President, Nuclear Operations PD22 Rdg ACRS (10)

System Energy Resources, Inc. SVarga Gray File 4 P.O. Box 23054 GLainas J. Lee Jackson, Mississippi 39205 DMiller LKintner

Dear Mr. Kingsley:

OGC-Bethesda 3

SUBJECT:

GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 - REVISION 0 TO THE PROCESS CONTROL PROGRAM (TAC NO. 63191)

By letter dated October 22, 1986, the licensee (Mississippi Power & Light Com-pany before December 20, 1986, and System Energy Resources, Inc. on or after that date) submitted for NRC review the GGNS Unit 1 Process Control Program (PCP), Revision 2. In addition, the October 22, 1986, letter transmitted the licensee's response' to the staff's request for additional information on Revision 1 to the PCP.

The NRC staff has completed its review of the October 2?,1986 submittal. The staff's safety evaluation is enclosed. The staff concludes that Revision 2 to the PCP complies with the GGNS Unit 1 Technical Specifications (TSs) and the current staff guidelines, and therefore is acceptable for use on an interim basis in conjunction with the GGNS Unit 1 TSs. The need for subsequent revision and staff review of the PCP will be indicated when staff guidelines are revised to fully incorporate the requirements of 10 CFR Part 61, t

The GGNS Unit 1 PCP states that contractor services are used for processing wet solid wastes. Within 30 days of receipt of this letter, you are requested to identify to the NRC staff the name of the contractor providing these services, and the NRC-approved licensing topical report that provides the contractor's PCP. If a different contractor is to be used, you are requested 1 to provide the above information to the staff prior to use of that contractor's '

services.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/s/

golkh ho 16 Lester L. Kintner, Project Manager p PDR Pro.iect Directorate 11-2 Division of Reactor Projects-I/II j

Enclosure:

As stated cc w/ enclosure:

See next page L qq2g 22 0:P Pj D Wr LKintner HR 3 ow

\0 /87 jr/y/87 $/1/87

-_____________m_ _ _ - _ _ _ _

,,, w U

7 ' '

4: <

  • ' 'Mr. Oliver D. Kingsley,'Jr.:
3' _
System Energy Resources .Inc.

Grand Gulf Nuclear Station (GGNS).' j

,i cc: -

  • Mr. Ted H; Cloninger

. . _ _ Mr. C.'R. Hutchinson j

' Vice President, Nuclear Engineering GGNS General l Manager ,

and Support -

1 .

System Energy Resources, Inc. ,

, System Energy Resources,_Inc. Post Office. Box 756 1 Post Office Box 23054 '  : Port'Gibson, Mississippi 39150 l Jackson, Mississippi 39205= ~!

a Robert B. McGehee, Esquire' The Honorable W!111am J. Guste, Jr. l Wise, Carter, Child, Steen and Caraway Attorney, General-P.O. Box 651 .

Department of Justice 1 hekson,~ Mississippi 39205 ' State of Louisiana Baton Rouge, Louisiana 70804

. Nicholas S.'Reynolds, Esquire Bishop,: Liberman, cook, Purcell' Office of the Governor

< and Reynolds .. State of Mississippi 1200.1'7th-Street, N.W.- Jackson,-Mississippi 39201 i w 1 Washington, D. C. 20036 .

y" _ Attorney General-Mr.. Ralph T. Lally Gartin Building

. Manager of Quality Assurance Jackson, Mississippi _39205 Middle South Utilities System

' Services, Inc.

1 LP.O.LBox 61000- Mr. Jack McMillan, Director ~ _

i

-New Orleans, Louisiana 70161 Division of. Solid Waste Management Mississippi' Department of Natural ,

Mr.. John G..Cesare . . Resources  !

. Director, Nuclear Licensing and Safety Bureau of Pollution Control 1

: System Energy Resources, Inc. Post Office Box 10385 P.O. Box 23054o . Jackson, Mississippi 39209 'l b Jackson, Mississippi 39205 l Alton B.'Cobb, M.D.  !

Mr. R. W. Jackson, Project Engineer State Health Officer j Bechtel Power Corporation State Board of Health j

'15740 Shady Grove Road P.O. Box 1700 l

Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr.-Ross'C.. Butcher President Senior' Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear ' Regulatory Comission Port Gibson, Mississippi 39150 1 Route 2, Box 399 i F Port Gibson, Mississippi 39150 Regional Administrator, Region II U.S. Nuclear Regulatory Comission j h 101_Marietta Street, N.W., Suite 2900 Atlanta ,' Georgia 30323 '

Mr. James E.' Cross GGNS Site Director System Energy Resources, Inc. i P.O.: Box 756 L ' Port Gibson, Mississippi 39150 l

_-