Ack Receipt of 870422 Ltr Transmitting Response to NRC Insp Rept 50-458/87-04.Explains Transition Process from Unresolved to Violation. Unresolved Items 458/8629-02 Closed But Reopened as Violation 458/8723-01
ML20149L890
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8802250111
Download: ML20149L890 (2)


See also: IR 05000458/1987004

Text

,

FEB I 91988

' In Reply Refer To: -

Docket: 50-458/87-04

Document Contains

SAFEGUARDS INFORMATION

Gulf States 'Jtilities

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing

P.O. Box 220

St. Francisville, Louisiana 70775

.

Gentlemen:

Thank you for your letter dated April 22, 1987, in response to our letter

dated March 17, 1987, transmitting inspection report 50-458/87-04.

Your letter makes reference to two previously identified findings, unresolved

items (458/8629-02) and (458/8629-03) and one new open item (458/8704-01). We

wish to make further reference to another inspection report 50-458/87-23,

because it explains the transition process from "unresolved" to "violation."

The effect of that process is set out in the next paragraph.

Your response to the unresolved item (458/8629-02), Testing and Maintenance,

was helpful in resolving this issue. We also received guidance from the NRC

Office of Nuclear Reactor Regulation (NRR). The item has been closed but for

accounting purposes only. It has been reopened as a violation which is

numberea (458/8723-01). We will expect a separate response to that violation

identified in NRC inspection report 50/458/87-23, page 6, paragraph 7.

Unresolved item (458/8629-03), Communications, remains open awaiting response

from NRR concerning your filing of an amendment to the operating license

pursuant to 10 CFR 50.90. Progress will be reviewed during a future

inspection.

Thank you for the report of your review of open item (458/8704-01),

Identification and Authorization / Badge Issuance. You appear to have a strong

system and this matter will be discussed during an upcoming inspection.

Sincerely,

Original Signed By

L J. Callan

L. J. Callan, Director

Division of Reactor Projects

cc: (see next page)

0802250111 880219 0

PDR ADOCK 050

RI B C:PS B C:R C:DRP/C 0:DRPY

JAFKelly/jt RJEv et LAY 1 EJHoller LJCallan

g/g/88 1./p/88 t/lW88 p / ly/88 7 /d/88

i

l

\

ENCLOSURE CONTAINS

Document Contains SAFEGUARDS INFORMATION. D

SAFEGUARDS INFORMATION UPON SEPARATION THIS hI  !

PAGE IS DECONTROLLED. h Ihj

.,.

,

'

Gulf States Utilities -2-

cc:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

River Bend Oversight

P.O. Box 2951 ,

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec w/ copy of licensee's response w/ safeguards:

RIV Security File

P. A. Starcher, RSGB/NRR

Resident Inspector

R. D. Martin, RA

R. L. Bangart, DRSS

Security Inspector

Chief, RPSB

RPSB Security File

bec w/ copy of licensee's response w/o safeguards:

DMB IE-04

DRP

Lisa Shea, RM/ALF

MIS

Section Chief, DRP/C

RIV Files

RSTS Operator

RPSB

DRS

R. E. Hall, DRSS

Project Engineer, DRP/C

S. Stern, NRR Project Inspector

1

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION,

UPON SEPARATION THIS

PAGE IS DECONTROLLED.

O O

,

eguar8s

OttflallOrt

'

GULF STATES UTILITIES COMPANY }

arvta $(%Q $f AhC% PC$1Offdl801123 $7 IR A%D$V1LLI Lov'5 TAN A 70776

A4E A COOT SN 636 6094 144 8411

.

April 22, 1987

RBG- 2S800

File Nos. G9.5, G15.4.1

U.S. Nuclear Regulatory Commission '

Document Control Desk

Washington, D.C. 20555

gg gg I

'

'

'

'

Gentlemen: A;.9 30EN

-

River Bend Station - Unit 1 ._ _5

Refer to: Region IV

Docket No. 50-458/ Report 87-04

Attached is Gulf States Utilities Company's (GSU) response to Nuclear

Regulatory Commission (NRC) Inspection report No.

inspection 50-458/87-04 The

was performed by Mr. James A. F. Kelly on February 2-6, 1987

of activities authorized by NRC Operating License NPF-47 for River Bend

Station Unit No. 1.

GSU's g >

responses to two previously identified findings, unresolved items

458/8629-02 and 03,'and one new open item 458/8704-01~ are provided in ' ~

the attachments. In accordance with 10CFR73.21, information contained

in these attachments has been determined to contain safeguards

information

response to and should be hsndled accordingly. This completes GSU's

the report,

,

Sincerely.

)

l

l

. C. Deddens

Senior Vice President '

River Bend Nuclear Group

Attachment

cc: Mr. Robert D. Martin, Regional Administrator

U.S. Nuclear Regulatory Commission

Region IV

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

NRC Resident Inspector

This page not subject to protective requirements when separated

from material containing SAFEGUARDS INFORMATION

f.h)hb---