Letter Sequence Request |
|---|
|
Results
Other: ML20205C876, ML20236F246, ML20236K212, RBG-26261, Submits Editorial Info Re 870511 & 15 Requests for Extension of Tech Spec Surveillance Intervals.Replacement Pages Encl, RBG-26300, Forwards Editorial Correction to 870310 Tech Spec Section 4.6.1.3.f,Page 3/4 6-5, RBG-26337, Forward Proposed Tech Specs W/Addl Editorial Info Re Util 870310 & 0511 Submittals on Requests for Extension of Tech Spec Surveillance Intervals, RBG-26357, Provides Addl Info to Attachment 4 to Util Re Efforts to Conduct Surveillances for Five Valves Subj to 10CFR50,App J Requirements,Per 870729 Discussion.Util Will Continue to Maintain List of Tests for Forced Outage
|
MONTHYEARML20205C8761987-03-10010 March 1987 Proposed Tech Specs Extending Interval for Subj Surveillance Requirement to Scheduled Refueling Outage Project stage: Other IR 05000458/19870041987-03-10010 March 1987 Partially Withheld Safeguards Insp Rept 50-458/87-04 on 870202-06 (Ref 10CFR73.21).No Violation or Deviation Noted. Major Areas Inspected:Security Plan & Implementing Procedures & Mgt Effectiveness.Details Withheld Project stage: Request RBG-25461, Application for Amend to License NPF-47,changing Tech Specs to Extend Surveillance Interval for Surveillance Requirements to First Refueling Outage Scheduled to Begin on 870915.Fee Paid1987-03-10010 March 1987 Application for Amend to License NPF-47,changing Tech Specs to Extend Surveillance Interval for Surveillance Requirements to First Refueling Outage Scheduled to Begin on 870915.Fee Paid Project stage: Request RBG-26070, Forwards Supplemental Info to Attachments 1 & 4 of 870310 Submittal Re Safety Relief Valves & Leak Rate Tests,Per NRC Request1987-06-0909 June 1987 Forwards Supplemental Info to Attachments 1 & 4 of 870310 Submittal Re Safety Relief Valves & Leak Rate Tests,Per NRC Request Project stage: Supplement ML20215E7701987-06-11011 June 1987 Notice of Consideration of Issuance of Amend to License NPF-47 & Proposed NSHC Determination & Opportunity for Hearing,Authorizing one-time Schedular Extension to Perform Surveillance Requirements in Tech Spec Section 4.6.6.2.C Project stage: Approval RBG-26186, Withdraws Five Previously Proposed Amends to License NPF-47, Extending Surveillance Intervals for Tech Spec Surveillance Requirements Until First Refueling Outage Scheduled for 870915.Proposed Changes Performed During Unscheduled Outage1987-06-30030 June 1987 Withdraws Five Previously Proposed Amends to License NPF-47, Extending Surveillance Intervals for Tech Spec Surveillance Requirements Until First Refueling Outage Scheduled for 870915.Proposed Changes Performed During Unscheduled Outage Project stage: Request RBG-26223, Provides Clarification to Description Portion of Util 870310 Attachment 4 Submittal.Five Valves Identified for Tech Spec Section 4.6.1.3.d Require Exemption for 10CFR50,App J Criteria1987-07-0808 July 1987 Provides Clarification to Description Portion of Util 870310 Attachment 4 Submittal.Five Valves Identified for Tech Spec Section 4.6.1.3.d Require Exemption for 10CFR50,App J Criteria Project stage: Supplement ML20235W2541987-07-15015 July 1987 Notice Granting Util Request for Withdrawal of 870310,18 & 0515 Applications for Amends to License NPF-47 Project stage: Withdrawal ML20235W2431987-07-15015 July 1987 Responds to Util 870630 Withdrawal of Portions of 870310 & 0515 Applications & Complete Withdrawal of 870318 Application for Amends to License NPF-47.Request Granted. Fr Notice Encl Project stage: Withdrawal RBG-26261, Submits Editorial Info Re 870511 & 15 Requests for Extension of Tech Spec Surveillance Intervals.Replacement Pages Encl1987-07-15015 July 1987 Submits Editorial Info Re 870511 & 15 Requests for Extension of Tech Spec Surveillance Intervals.Replacement Pages Encl Project stage: Other ML20236C9421987-07-21021 July 1987 Forwards Environ Assessment & Finding of No Significant Impact Supporting Proposed Exemption from Requirement of 10CFR50,App J to Conduct Type C Leak Tests,In Response to Util 870310,0609 & 0708 Ltrs Project stage: Approval ML20236C9591987-07-21021 July 1987 Environ Assessment & Finding of No Significant Impact Supporting Proposed Exemption from Requirement in 10CFR50, App J to Conduct Type C Tests on Five Reactor Coolant Pressure & Primary Containment Isolation Valves Project stage: Approval RBG-26300, Forwards Editorial Correction to 870310 Tech Spec Section 4.6.1.3.f,Page 3/4 6-51987-07-23023 July 1987 Forwards Editorial Correction to 870310 Tech Spec Section 4.6.1.3.f,Page 3/4 6-5 Project stage: Other RBG-26337, Forward Proposed Tech Specs W/Addl Editorial Info Re Util 870310 & 0511 Submittals on Requests for Extension of Tech Spec Surveillance Intervals1987-07-27027 July 1987 Forward Proposed Tech Specs W/Addl Editorial Info Re Util 870310 & 0511 Submittals on Requests for Extension of Tech Spec Surveillance Intervals Project stage: Other ML20236F2461987-07-27027 July 1987 Proposed Tech Specs Providing Editorial Info Discussed in Util 870310 & 0511 Submittals Requesting Extension of Tech Spec Surveillance Intervals Project stage: Other RBG-26357, Provides Addl Info to Attachment 4 to Util Re Efforts to Conduct Surveillances for Five Valves Subj to 10CFR50,App J Requirements,Per 870729 Discussion.Util Will Continue to Maintain List of Tests for Forced Outage1987-07-30030 July 1987 Provides Addl Info to Attachment 4 to Util Re Efforts to Conduct Surveillances for Five Valves Subj to 10CFR50,App J Requirements,Per 870729 Discussion.Util Will Continue to Maintain List of Tests for Forced Outage Project stage: Other ML20236K2191987-07-31031 July 1987 Safety Evaluation Supporting Amend 7 to License NPF-47 Project stage: Approval ML20236K2121987-08-0303 August 1987 Amend 7 to License NPF-47,authorizing One Time Extensions to Surveillance Intervals for Drywell Bypass Leakage Testing Project stage: Other 1987-07-21
[Table View] |
Text
_
.
-
.
.
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-458/87-04 License:
NPF-47 Docket:
50-458 Licensee: Gulf States Utilities P. O. Box 220 St. Francisville, Louisiana 70775 Facility Name:
River Bend Station (RBS)
Inspection At:
St. Francisville, Louisiana Inspection Conducted:
February 2-6, 1987
)
Inspector:
cw1 I'O_ a,
lI)le2 YO
J./ A. Fj. Kelly 7$enibr Php4M1 Security Date Specialist, Emergency Preparedness and
,
Safeguards Programs Section
iO/D Approved:
u Cu L. A. Yande' 1,' Chief, Emergency Preparedness Date and Safeguards Programs Section Inspection Summary l
Inspection Conducted February 2-6, 1987 (Report 50-458/87-04)
Areas Inspected:
Routine, unannounced inspection of security plan and implementing procedures, management effectiveness security program, records and reports, compensatory measures, access control personnel, and communications.
Results:
Within the six areas inspected, no violations or deviations were identified.
ENCLOSURE CONTAINS.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
8703200360 870317 PDR ADOCK 05000458 G
PDR
. _ _ _ _ _ _ _ _ _. _ _ _
.