Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F0481990-11-19019 November 1990 Advises That SR Peterson Replacing C Poslusny as Project Manager for Facility,Effective 901105 ML20216K0001990-11-13013 November 1990 Forwards Insp Repts 50-313/90-30 & 50-368/90-30 on 900905- 1016 & Notice of Violation ML20058G8471990-11-0808 November 1990 Forwards Insp Repts 50-313/90-32 & 50-368/90-32 on 900924-29.No Violations or Deviations Noted IR 05000313/19900321990-11-0808 November 1990 Ack Receipt of Outlining Steps to Provide Addl Technical Support for Radiation Protection Manager.Planned Actions Acceptable as Documented in Insp Repts 50-313/90-32 & 50-368/90-32 ML20058G1631990-11-0707 November 1990 Forwards Summary of Current Status of Unimplemented Generic Safety Issues at Plant ML20058E2881990-11-0101 November 1990 Rejects 900302 Request for Amend to Tech Specs to Revise Power Calibr Requirements for Linear Power Level & Core Protection Calculator delta-T Power & Nuclear Power Signals ML20062D5761990-10-31031 October 1990 Forwards Insp Repts 50-313/90-40 & 50-368/90-40 on 901015-19.No Violations Noted ML20062D5631990-10-31031 October 1990 Forwards Insp Repts 50-313/90-37 & 50-368/90-37 on 901015-19.No Violations Noted ML20062D5511990-10-31031 October 1990 Forwards Insp Repts 50-313/90-31 & 50-368/90-31 on 901001-04.No Violations Noted ML20059P0441990-10-16016 October 1990 Authorizes Use of Inconel 690 (I-690) as Alternate to I-600 in Steam Generator Tube Sleeves/Plugs Per 10CFR50.55a(a)(3) ML20058A5211990-10-16016 October 1990 Forwards Insp Repts 50-313/90-38 & 50-368/90-38 on 901001- 05.Violation Considered for Escalated Enforcement Action ML20058A0811990-10-15015 October 1990 Forwards Questions Re 900808 License Amend Request to Increase Reactor Power to 100% for Response ML20062A5511990-10-10010 October 1990 Forwards SER Re Util 890403,13 & 0717 Responses to Station Blackout Rule.Issue of Conformance Still Open IR 05000313/19900011990-10-0404 October 1990 Ack Receipt of 900420 & 0914 Ltrs Re Validation of Nonlicensed Operator Staffing Per Insp Repts 50-313/90-01 & 50-368/90-01 ML20059M0441990-09-26026 September 1990 Approves 900809 Request to Withhold 86-1179795-01, ANO-1 HPI Flow Rate Requirements (Ref 10CFR2.790(b)(5)) ML20059K3851990-09-14014 September 1990 Forwards Insp Repts 50-313/90-28 & 50-368/90-28 on 900827-31.No Violations or Deviations Noted.Some Weaknesses Identified in Areas of Alternate Safe Shutdown Procedure & Associated Training for Unit 2 ML20059J2431990-09-14014 September 1990 Discusses Programmed Enhancements for Generic Ltr 88-17, Loss of Dhr. Changes in Completion Schedule Should Be Submitted to NRC ML20059J9901990-09-13013 September 1990 Forwards Info Re Generic Fundamentals Exam of Operator Licensing Written Exam to Be Administered on 901010.W/o Encl ML20059G2951990-09-0606 September 1990 Advises That Rev 10 to Emergency Plan,Contained in ,Acceptable.Rev Consists of Changes Resulting from Reorganization,Relocation of Personnel from Little Rock Ofc & Improvements from Annual Emergency Preparedness Exercise ML20059E8621990-08-31031 August 1990 Forwards Insp Repts 50-313/90-27 & 50-368/90-27 on 900813-17.No Citations Issued for Violation ML20059D1551990-08-30030 August 1990 Forwards Request for Addl Info to Continue Review of 891019 Application for Amend Extending Insp Frequency of Spent Fuel Pool from Once Per 18 Months to Once Per 60 Months.Response Requested within 45 Days IR 05000313/19900161990-08-29029 August 1990 Discusses 900823 Meeting Re Unresolved Item Concerning Missed Surveillance Tests,Per Insp Repts 50-313/90-16 & 50-368/90-16.Violation of Tech Spec Requirements Noted But Not Cited Due to Listed Reasons ML20059D6381990-08-29029 August 1990 Ack Receipt of Re Proposed Changes to Unit 1 Tech Spec 6.12.2.6(b) & Unit 2 Tech Spec 6.9.3.1.Proposed Changes Appear to Improve Quality of Semiannual Radioactive Effluent Release Repts ML20059E5901990-08-29029 August 1990 Forwards Summary of 900823 Quarterly Performance Meeting at Plant Re NRC Authorized Activities.Meeting Provided Better Understanding of Current Implementation Status of Program Changes at Plant.List of Attendees & Viewgraphs Encl ML20059F3441990-08-29029 August 1990 Forwards Insp Repts 50-313/90-23 & 50-368/90-23 on 900716-20.No Violations or Deviations Noted ML20059B8461990-08-23023 August 1990 Responds to Re Violations Noted in Insp Repts 50-313/89-33 & 50-368/89-33.Violations Remain Applicable ML20056B4921990-08-22022 August 1990 Forwards Request for Addl Info Re Util 900618 Response to NRC Questions on Condensate Storage Tank Seismic Qualification.Response Should Be Provided within 45 Days to Facilitate Completion of NRC Effort ML20056B4131990-08-21021 August 1990 Forwards Summary of 900718 Meeting Re Exercise Weaknesses Noted in Insp Repts 50-313/90-08 & 50-368/90-08 ML20056B4641990-08-21021 August 1990 Ack Receipt of Advising NRC of Current Status of Security Perimeter Improvements,Per Insp Repts 50-313/87-31 & 50-368/87-31.Implementation of Design Change DCP 90-2001 for Perimeter Lighting Will Be Monitored for Adequacy Later ML20059A7011990-08-17017 August 1990 Forwards Sser Concluding That Rochester Instrument Sys Model SC-1302 Isolation Device Acceptable for Use at Plant for Interfacing SPDS W/Class IE Circuits ML20058P2601990-08-13013 August 1990 Forwards Insp Repts 50-313/90-26 & 50-368/90-26 on 900730-0803.No Violations or Deviations Noted.Rept Does Not Include Specific Insp Followup for Any Diagnostic Evaluation Team Findings ML20058N9741990-08-10010 August 1990 Forwards Insp Repts 50-313/90-19 & 50-368/90-19 on 900601- 0715 & Notice of Violation.Util Should Respond to Failure to Adequately Implement Surveillance Test Required by Tech Specs IR 05000313/19900041990-08-0909 August 1990 Ack Receipt of 900611 & 0731 Ltrs Re Steps Taken to Correct Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04 ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 ML20055J3571990-07-31031 July 1990 Forwards Review of C-E Topical Rept Cen 387-P, C-E Owners Group Pressurizer Surge Line Flow Stratification Evaluation, Per NRC Bulletin 88-011.Adequate Basis Not Provided for Meeting Pressurizer Surge Line Code Limits ML20055J3981990-07-31031 July 1990 Discusses Util 890602 Response to Item 1.b of NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification. Sufficient Info Provided to Justify Continued Plant Operation Until Final Rept for Unit 1 Completed ML20056A0211990-07-30030 July 1990 Ack Receipt of 890307 & s Informing NRC of Steps Taken to Correct Violation Noted in Insp Repts 50-313/88-47 & 50-368/88-47 ML20055J1201990-07-24024 July 1990 Advises That Operational Safety Team Insps 50-313/90-24 & 50-368/90-24 Scheduled at Plant Site on 900910-21 ML20055H9511990-07-23023 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/90-01 & 50-368/90-01 ML20055H9471990-07-20020 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02 ML20058P7261990-07-19019 July 1990 Forwards Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 900606 ML20055G1801990-07-17017 July 1990 Confirms 900718 Mgt Meeting in Region IV Ofc Re Exercise Weaknesses Noted During Mar 1990 Emergency Exercise ML20055F8011990-07-13013 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/89-27 & 50-368/89-27.Security Officer Training Will Be Evaluated During Future Insps ML20055E5171990-07-0909 July 1990 Advises That 900607 Control Element Assembly Failure at Maine Yankee Not Applicable to Facility.Nrc Understands That Util Does Not Plan to Use Any old-style Control Element Assemblies in Future ML20055D5081990-06-29029 June 1990 Forwards Insp Repts 50-313/90-18 & 50-368/90-18 on 900521-25.No Violations or Deviations Identified.Two Open Items in Areas of Procedures & Personnel Dosimetry Noted ML20055D1661990-06-27027 June 1990 Forwards Insp Repts 50-313/90-10 & 50-368/90-10 on 900514-0601.No Violations or Deviations Identified ML20059M8331990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20062C8291990-05-24024 May 1990 Forwards Safety Evaluation Granting Relief from Certain Inservice Insp Requirements of ASME Code,Section Xi,Per 881103 & 890823 Requests ML20248H7521989-10-0404 October 1989 Forwards Insp Repts 50-313/89-33 & 50-368/89-33 on 890828-0901 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21) ML20247R7251989-09-26026 September 1989 Informs That NRC to Perform Independent Verification Insp During Period 891016-27 Using NRC Mobile NDE Trailer & Team. Supplemental Info Encl 1990-09-06
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 ML20209D8521999-07-0707 July 1999 Responds to Util 990706 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by TS 3.7.2, Auxiliary Electrical Sys. NOED Warranted & Approval Granted for Extension of Allowed Outage Time to 14 Days ML20209A8561999-06-25025 June 1999 Refers to Investigation Rept A4-1998-042 Re Potential Falsification of Training Record by Senior Licensed Operator at Arkansas Nuclear One Facility.Nrc Concluded That Training Attendance Record Falsified IR 05000313/19990071999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/99-07 & 50-368/99-07 Issued on 990514.Adequacy of Min Staffing Levels May Be Reviewed During Future Insps ML20196D4241999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SOP-43716 Issued on 990325.Believes That NRC Concerns Have Been Adequately Addressed at Present ML20207H3551999-06-10010 June 1999 Forwards Insp Repts 50-313/99-05 & 50-368/99-05 on 990411-0529.No Violations Noted ML20195G3481999-06-0909 June 1999 Ack Receipt of ,Transmitting Changes to Facility Emergency Plan,Rev 25,under Provisions of 10CFR50,App E, Section V IR 05000313/19993011999-06-0909 June 1999 Discusses Arrangements for Administration of Licensing Exam During Wk of 991213,per Telcon of 990602.As Agreed,Exams Repts 50-313/99-301 & 50-368/99-301 Will Be Prepared Based on Guidelines in Rev 8 of NUREG-1021 ML20195F1631999-06-0808 June 1999 Forwards Insp Repts 50-313/99-06 & 50-368/99-06 on 990524-28.Violation Identified & Being Treated as Noncited Violation ML20207G3111999-06-0707 June 1999 Ack Receipt of Changes to ANO EP Implementing Prcoedure 1903.010,Emergency Action Level Classification,Rev 34 PC-2, Received on 981218,under 10CFR50,App E,Section V Provisions. No Violations Identified ML20207G7951999-06-0707 June 1999 Forwards Notice of Violation Re Investigation Rept A4-1998-042 Re Apparent Violation Involving Initialing Record to Indicate Attendance at Required Reactor Simulator Training Session Not Attended ML20207E7131999-06-0202 June 1999 Discusses EOI 990401 Request for Alternative to Requirements of Iwl for Arkansas Nuclear One,Pursuant to 10CFR50.55a(g)(6)(ii)(B) & ASME BPV Code Section XI & Forwards Safety Evaluation Accepting Proposed Alternative ML20207B9521999-05-26026 May 1999 Discusses GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. Staff Will Conduct Limited Survey in to Identify Sampling ML20207B4171999-05-24024 May 1999 Forwards Corrected Cover Ltr to Insp Repts 50-313/99-07 & 50-368/99-07 Issued 990514 with Incorrect Insp Closing Date ML20207A7771999-05-24024 May 1999 Forwards Insp Repts 50-313/98-21 & 50-368/98-21 on 981116-990406.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206U4541999-05-17017 May 1999 Discusses Util & Suppl Re Changes to License NPF-06,App a TSs Bases Section.Staff Offers No Objection to These Bases Changes.Affected Bases Pages,B 202, B 2-4,B 2-7,B 3/4 2-1,B 3/4 2-3 & B 3/4 6-4,encl ML20206S4721999-05-14014 May 1999 Forwards Insp Repts 50-313/99-07 & 50-368/99-07 on 990426- 30.No Violations Noted.However,Nrc Requests That Util Provide Evaluation of Licensee Provisions to Maintain Adequate Level of Response Force Personnel on-site ML20207B4271999-05-14014 May 1999 Corrected Ltr Forwarding Insp Repts 50-313/99-07 & 50-368/99-07 on 990426-30.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program ML20206R4741999-05-13013 May 1999 Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC ML20206N7011999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206M7581999-05-11011 May 1999 Forwards SE Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 ML20206S1761999-05-11011 May 1999 Responds to Informing of Changes in Medical Condition & Recommending License Restriction for Senior Reactor Operator.No Change Was Determined in Current License Conditions for Individual ML20206N4161999-05-11011 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-related Logic Circuits, for Plant,Units 1 & 2 ML20206S4211999-05-10010 May 1999 Forwards Insp Repts 50-313/99-04 & 50-368/99-04 on 990228- 0410.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206H1031999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheet & Results to Appropriate Individuals.Without Encl ML20206F0611999-04-29029 April 1999 Forwards SE Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20205R6331999-04-20020 April 1999 Ack Receipt of Which Transmitted Rev 39 to ANO Industrial Security Plan,Submitted Under Provisions of 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M6881999-04-12012 April 1999 Forwards Safety Evaluation on Second 10-year Interval Inservice Insp Request Relief 96-005 ML20205L7711999-04-0909 April 1999 Forwards Insp Repts 50-313/99-03 & 50-368/99-03 on 990202- 17.No Violations Noted ML20205K7681999-04-0606 April 1999 Forwards RAI Re risk-informed Alternative to Certain Requirements of ASME Code 11,table IWB-2500-1 ML20205G8871999-04-0202 April 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant, Units 1 & 2.Response Requested within 60 Days of Date of Ltr 1999-09-22
[Table view] |
See also: IR 05000313/1986018
Text
, , ,
l o ,
EAR 2 71987 -
l
l
! In Reply Refer To:
Dockets:- 50-313/86-18
-
50-368/86-19
,
Arkansas Power & Light Company
l ATTN: Mr. Gene Campbell
Vice President, Nuclear
l Operations
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
Thank you for your letters of August 29, 1986, and March 11, 1987, in
response to our letters and Notice of Violation dated July 25, 1986, and
January 9,1987. We have reviewed your reply and find it responsive to the
concerns raised in our Notice of Violation. We will review the implementation
of your corrective actions during a future inspection to determine that full
compliance has been achieved and will be maintained.
'l
Sincerely, I
.
Orlz?nd sivua 2, '
J. E. Gca!!ardo ,
J.: E. Gagliardo, Chief
Reactor Projects Branch
cc:
J. M. Levine, Director.
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bectoDMB(IE01) $$40jDobk!OS$313
O PDR , .
bec distrib. by RIV:
RPB RRI R. D. Martin, RA
R&SPB SectionChief(RPB/B) D. Weiss, RM/ALF-
RIV DRSP RSB
MIS System RSTS Operator Project Inspector
R. Hall .
PI C:RPBh C:RPB -
h
ME urphy cs QRHunter JEGagl do / I
' g'
3/77/87 3A7/87 3/4187 ,
_. I
,--_
, c- ,
AAKANSAS POWER & UGHT COMPANY
{
,
POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 3714000 ,.
'
August 29, 1986
\ .-
50l@20W2W
SCAN 088614
fJj SEP -81506 fj
Mr. J. E. Gagliardo, Chief L
Reactor Projects Branch
U. S. Nuclear Regulatory Commission
Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76011
SUBJECT: Arkansas Nuclear One - Units 1 & 2
Docket Nos. 50-313 and 50-368
j-
..
License Nos. DPR-51 and NPF-6
-
Response to Inspect.on Report
50-313/86-18 and 50-368/86-19
Dear Mr. Gagliardo:
The subject report has been reviewed. A response to the Notice of Violation
is attached.
Very truly yo s,
f f^- ~
y J. T os, Manager
Nuc)ea Engineering and Licensing
JTE:RJS:lw
Attachment
.
i
h
- - , - - ,1 .......
.
_ _ _ _ _ _ . . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - ,
C# ,
3.-
'
p' .
, ,
.
' '
! i
I i _,
'
~
.
,
.1
NOTICE OF VIOLAT10N ,
/ !
j
,
- -
r p ,
1
DuringanNRCinspectionconductedduringtheperiodMa/h31,N986,
M .J#V, ' I
-
violations of the NRC requiremamts were identified. Th.: violations involved pM ! ,,'j
failure to lock a manual valve. in position as requirsd ', fe'flure to heee
adequate controls over the installation of temporsry sc /fsids in the
j
vicinity of safety-related eq',ipment, and 'f ack o/ calibrt. tion data tha*. g/[, g
l.
would demonstrate the accuracy of measurement'of,the admixture liquW
l' dispenser being utilued at the concrete supplier's facility. The specific
finaings and AP&L's rasponse to each are listed below. ..
I,
.
, _
. t;
A. 10 CFR 50, Appendix B.0triterion-V Mates, in part, "ActiviUes
affecting quality shall be prescrited by documented instructions, ,
procedures, ... of a type appropriat'e to the circumstances and shall be ,,
accomplished in 'accordance with thesa instructions;jreteJures. ... ANO /
procedures 1000.04, " Procedural Program Requirements," Movisiod 20, jnd -
- 1000.06, " Procedure Review, Approval, and Revision' Control," Revis hn ,l' !
l 22, implemented these requirements.. '
. / .L
! t- 1
1 Con'
t pary to the above, c .*,usber of deficiencies were foundin ver fus
i procedures which could result in perfn mence errors. The following are 1 ;
j examples: c
-
N.
'
1
,
'
y
i 1. The last sentence in paragraph 5.2.2 of roceduce 1000.09,?
'
w
- _;,,,. " Surveillance Test Program Control " is prammatically inc'or m.t ,
j and should be considered for deletion. Paragraph 6.2,3 conttins ,
-
the accurate statement. Additionally, paragraphs.6.2.6 and 6f.l '
8e, ,;
} referred to nonexistent procedutas. i
'
'
'
u \ , ,
2. Pages 22.end 24 of Attachovnt 2 te procedure 1022.06, "ASME Codo >
'
Section'XI. Insoryice Testing Program Unit 1," were incorrect? ,
The correct informativ. (pa{e 24) was not included. , , ;
l 3. Paragraphs 2.0, 3.0, and 3.3 of p?ocedure 1032.07, ."ISI Program
f ,\ \ i'\. '
)
- Requirements," do+it net referent.w',oracedure'1022.tfr (Unit 2) even '
!
though procedute IM2.07 was writ, ten for3oth unit's. 5. l \
'
C \ \ ,,
'
- .
]
l 4. Forms 1000.068 ar.d 1000.06C in prore' dure 1000.06 ,"hscedure i I
Review, Approval,, and Revision CoM,rol," scntained wording in the ,
'
Jl
1
10 CFR 50.59 applicability, felock that stated, in part; involves a
change to a itest or experiment" insted of " involves ) tset or I
l
i
1, experiment" which would be consistent Mth the 'lar.2ual,e in 10 CFR i
j 50.59, ; I
f
l 5. Question 2 in Form 1000.06E read, in part, "vould the ,r,coposed
i procedure change ... ." which does not addren the fan tlat
! 10 CFR 50.59 applies to both proposed prossdures and t.harges. -
>
-
+
- . , f "
i This is a Severity Level V violatlon. F
! 368/8619-02) ;
(Supplement ) 1.E)
.! #1*78418 02; (
-
5
>
i e i -
r. \
( ),
j s i i '
,f.
, .
, k * ki '
) ,
x
,
i -
s
1
}
.
-< ) %
, l p
'
'
. >
,p
1 > 3 y i '
, - . , - . . . - - , - - , , . . -,J, :
. _ _ _ - _ . , _ _ - . -Q _ __
r___ __
.
.
,.
a* ,
.
. -
..
.
'
8. 10 CFR 50.59(b) states, in part, "The licensee shall maintain records
o
of changes in the facility and of changes in procedures made pursuant
to this section ... The licensee shall furnish ... annually or at such
shorter intervals as may be specified in the licensee, a report
containing a brief description of such changes, tests, and experiments,
including a summary of the safety evaluation of each."
i
Contrary to the above, the licensee failed to submit a report of
activities for the years 1984 and 1985.
This is a Severity Level V violation (supplement I.E.) (313/8618-01;
368/8619-01)
-
RESPONSE
The preparation of the 1984 10CFR50.59 report was more extensive than in the
,
past to ensure that the report contained more detailed summaries of the
activities performed under the guidance of this regulation. This effort
required additional coordination between Licensing and the groups who
performed the safety evaluations. However, the result was a more accurate
reflection of the activities that occurred during 1984. Additionally, both
l the 244 and IR6 refueling outages began in 1984, during which an unusually
large number of design changes, processed under the provisions of
-
10CFR50.59, were implemented.
J.'
-
The 1984 Summary Report has now been completed and was issued to the NRC
July 15, 1986 (OCAN078604). The 1985 report, which will also contain the
more detailed summaries, is currently being prepared for issuance by
September 18, 1986.
In recognition of the problem of timely submittals and in an effort to make
. program improvements while maintaining the quality of the reports. AP&L is
currently undertaking corrective action to develop a more efficient and
systematic means of compiling 10CFR50.59 Summary Reports to avoid such
delays. Actions include additional staff guidance on tracking, compiling
and reporting 50.59 affected changes. These actions should ensure timely
reporting in the future.
1
-
l
l
.
b
e
0
,e
_. _
.
. -
e. ,
.
6
,
RESPONSE
The specific examples cited in the violation are discussed below:
1. The specific paragraphs of the administrative procedure 1500.09,
" Surveillance Test Program Control," noted in the violation are
provided below:
"6.2.2 Surveillance tests that are the scheduling responsibility
of WCC are controlled by this procedure. This includes
most tests with a test frequency of once per week or
longer. Those tests of shorter frequency are scheduled by
responsible departments should be controlled by
departmental procedures."
"G. 2. 3 Surveillance tests that must be performed more than once
per week are scheduled by the responsible department and
should be governed by departmental procedures."
The last sentence of paragraph 6.2.2 lacks the word "and" to be
grammatically correct and will be revised accordingly. As noted in the
violation, " Paragraph 6.2.3 contains the accurate statement." AP&L
-
contends that no performance error would have resulted as procedures
- 7.- are utilized as complete documents and the noted paragraphs would not
-
be taken out of context of the complete procedure.
The nonexistent procedures cited in the violation, specifically
paragraph 6.2.6 which references procedure 1015.06, "ASME Code Section
XI Operational Readiness Testing," and paragraph 6.2.8 which
references procedure 1005.01, "M&TE Calibration Program," do in fact
exist but have been assigned different numbers under a reorganization
of administrative procedures. Paragraghs 6.2.6 and 6.2.8 will be
revised to reference the appropriate procedure numbers. AP&L does not
have an automatic system that identifies all cross referenced
procedures. Several methods do exist for a user to correctly locate
cross referenced procedures. As an example, the procedure tab in the
station procedure manual for procedure 1015.06 contains a form which
informs the user of this procedure's deletion and references the i
appropriate replacement procedure number. Additionally the ANO Document
Control System contains the information needed to establish the
chronolagy of procedure issuance, deletion,' renumbering, etc., to
establish necessary cross referencing. AP&L co'n tends that the needed
procedure cross referencing updates cited, though desirable from an
ease of use perspective, would not have resulted in performance errors.
2. As noted in the Inspection Report, a reproduction error was made during
procedure 1022.06, "ASME Code Section XI Inservice Testing Program
ANO-1," copying for distribution. The data contained on page 24 of the
l procedure was a duplication of the data contained on page 23 of the
t- proceduro. This error was made when the data pages were reduced onto
the procedure form pages. Page 23 contained the correct data. The
correct data for procedure page 24 of the current revision has now been
distributed. This administrative procedure provides an overall I
.
. .
.
.
.
. ____
. -. - - - - -_ . . _ - _ . .-. _ - -
c. ,
.
&
.
description of the ANO-1 Inservice Testing Program and does not control
pump and valve testing. Actual in-service testing of pumps and valves
is performed utilizing plant operating procedures; therefore, AP&L
i contends this error would not have resulted in a performance error of
the testing program. ..
3. Procedure 1022.07, "ASME Code Section XI Inservice Testing Program
ANO-2," was originally issued on August 24, 1985. The current
revision of 1032.07, "ISI Program Requirements," was effective August
1, 1985. Therefore, procedure 1022.07 was not issued prior to the last
revision of 1032.07. The noted paragraphs of procedure 1032.07 cited
in violation as not containing a reference to procedure 1022.07 were
- paragraphs 2.0, 3.0 and 3.2. Paragraph 2.0 of procedure 1032.07
l details the scope of the procedure, specifically that "The pump and
l valve test program to meet Section XI of the ASME Code is not addressed
,
by this procedure, but rather is covered by procedure 1022.06 ...."
Paragraph (section) 3.0 of procedure 1032.07 details the references
used to develop procedure 1032.07 in paragraph 3.1 and related ANO
administrative procedures in paragraph 3.3. Procedure 1032.07
paragraph 3.2 does not require a reference to procedure 1022.07.
Procedure 1022.07 is not required for implementation of procedure
1032.07. Appropriate references to procedure 1022.07 will be added to
procedure 1032.07. AP&L contends that the omission of the references
to procedure 1022.07 would not have resulted in a performance error of
'
.,- i
t- the Inservice Inspection Program requirements. Additionally, procedure 1
-
1032.07 is an administrative procedure which describes the program and
is not a performance procedure.
4. Form 1000.068, Procedure / Work Plan Request, is designed to provide a
description of the purpose or reason for procedure development or
procedure revisions. It also documents the review and approval process
as delineated in procedure 1000.06. Form 1000.06C, Temporary Procedure
Change Request, is designed as a method for temporary changes to
procedures. It is not applicable to original procedure development.
The 10CFR50.59 applicability section of these two forms is formatted to
determine if an unreviewed safety question evaluation is required by
use of the following questions:
-
Involves a change to a procedure described in the FSAR
YES NO
-
Involves a change t, ' test or experiment not described in the
FSAR
YES NO
-
Involves a change that affects compliance with the Technical
l
'YES NO I
These forms are utilized for original procedure review but are
primarily structured for procedure changes. The wording of these three I
questions reflect this structure, and this should be recognized by the
l
l
"
_ - _ _ . _ _ _ .- _ .
e. .
.
..
.
procedure reviewers. For an incident in which a new procedure is
developed to perform a test or experiment not the FSAR and the
procedure writer misinterprets the question, the review process would
identify the error and return the procedure to the writer. This
process, by its basic design, would prevent performance errors from
resulting in approval procedure without the proper evaluation for an
j unreviewed safety question,
f 5. Form 1000.06E, Unreviewed Safety Question Determination, is designed to
document an evaluation of a procedure or a procedure change for an
unreviewed safety question. The form consists of seven yes or no
questions which directly paraphrase the guioance of 10CFR50.59.a.2.
Each question begins with the phrase "Would the proposed procedure or
change" except that in question 2 the word "or" has been inadvertently
omitted. Because the questions are applicable in the same sense to a
procedure or procedure change as directed by procedure 1000.06, the
procedure writer should answer the question appropriately. In fact,
without the word "or" in the question, for a new procedure a yes or no
answer would not be applicable. AP&L contends that this would not
result in a performance error and that even if it was misinterpreted by
the procedure developer, the review process would prevent a performance
error from resulting in an approved procedure with an inadequate
evaluation.
]S-' As the Inspector only speculated that performance errors could have resulted
and did not substantiate this inference in the scope of the inspection, AP&L
does not agree that a violation of 10CFR50, Appendix 8, Criterion V has
occurred.
.