ML20205G236

From kanterella
Revision as of 17:59, 29 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/88-25 on 880926-1014.No Violations Noted
ML20205G236
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/21/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20205G238 List:
References
NUDOCS 8810280217
Download: ML20205G236 (2)


See also: IR 05000461/1988025

Text

_ - _ _ _ _ _ __

_

__

. .

.

.

1

OCT 211988

Docket No. 50-461

Illinois Power Company

ATTh: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur IL 62525

.

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. H. Neisler of

this office on September 26 through October 14, 1988, of activities at the

Clinten Power Station authorized by NRC Operating License No. NPF-62 and to

the discussion of our findings with Mr. D. Hall and other members of your staff

at the conclusion of the inspection. The purpose of this inspection was to

examine the implementation of comitments to Generic Letter 83-28.

The enclosed copy of our inspection report identifies aret.s examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of HRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

1 fpff0Lh . (%ciI s* rt

J. J. Ilarrison, Chief

f

l

Engineering Branch

l

Enclosure: Inspection

f Report No. 50-461/88025(DRS)

!

See Attached Distribution

vtr

Rll ,1 Rlj! /

' Ril)g

y,' * LYI ' r 1"

Rf)il

' )s er/Jk Cb,(pe

u r Gardner Harrison

~

10/20/88 10/>l /88 10/21/88 10/q/88

gf I

l

8910280217 CG1021

PDR ADOCK 05000461

@ PDG .[$ C. l

r

.

. .

'

.

f

Illinois Power Company 2

OCT 211988

Distribution

cc w/ enclosure:

D. P. Hall, Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt,, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers