MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000382/19900221990-10-23023 October 1990 Insp Rept 50-382/90-22 on 900905-1001.Violations Noted.Major Areas Inspected:Followup of Events,Monthly Maint & Surveillance Observation,Operational Safety Verification, Followup of Previously Identified Items & LER Followup IR 05000382/19900211990-10-12012 October 1990 Insp Rept 50-382/90-21 on 900910-14.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radwaste Mgt Program IR 05000382/19902001990-09-10010 September 1990 Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810. Major Areas Inspected:Plant Design Features,Sys,Equipment, Procedures,Operations Activities & Human Actions That Could Affect Initiation or Progress of Interfacing Sys LOCA IR 05000382/19900171990-08-27027 August 1990 Insp Rept 50-382/90-17 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program Including Changes to Emergency Plans & EPIPs & Changes to Emergency Facilities IR 05000382/19900111990-07-29029 July 1990 Insp Rept 50-382/90-11 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program.Licensee Implemented Effective Program & Personnel Highly Qualified & Motivated IR 05000382/19900141990-07-17017 July 1990 Insp Rept 50-382/90-14 on 900625-29.Violation Noted.Major Areas Inspected:Containment Local Leak Rate Testing Data, Surveillance Test & Calibr Program & Followup of Previous Insp Findings IR 05000382/19900101990-07-0505 July 1990 Cancelled Insp Rept 50-382/90-10 IR 05000382/19900091990-06-26026 June 1990 Errata to Insp Rept 50-382/90-09,inserting Page 6a.No Violations or Deviations Noted ML20055C7821990-06-14014 June 1990 Insp Rept 50-382/90-09 on 900501-31.No Violations or Deviations Noted.One Unresolved Item Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890231989-09-26026 September 1989 Insp Rept 50-382/89-23 on 890801-31.No Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification IR 05000382/19890251989-09-21021 September 1989 Insp Rept 50-382/89-25 on 890828-0901.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Qualification & Training & Licensee QA & Contractor Audits IR 05000382/19890161989-09-15015 September 1989 Insp Rept 50-382/89-16 on 890717-21.Violation Noted.Major Areas Inspected:Operations Procedures IR 05000382/19890221989-08-0909 August 1989 Insp Rept 50-382/89-22 on 890701-31.Violation Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification & LER Followup IR 05000382/19890201989-07-25025 July 1989 Insp Rept 50-382/89-20 on 890705.No Violations or Deviations Noted.Major Areas Inspected:Svc Failure of Shaft in Chilled Water Pump B IR 05000382/19890171989-07-14014 July 1989 Insp Rept 50-382/89-17 on 890601-30.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890181989-07-13013 July 1989 Insp Rept 50-382/89-18 on 890626-30.Noncited Violation Noted.Major Areas Inspected:Corrective Action Program & Licensee Actions on Previously Identified Findings IR 05000382/19890151989-07-0606 July 1989 Insp Rept 50-382/89-15 on 890605-09 & 20-21.No Violations or Deviations Noted.Major Areas Inspected:Storage of Emergency Diesel Generator Fuel Oil,Containment Bldg Temp Profiles & Action on Previously Identified Insp Findings IR 05000382/19890141989-07-0303 July 1989 Insp Rept 50-382/89-14 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Effluent Control Programs & Review of Special & Semiannual Effluents Repts IR 05000382/19890131989-06-14014 June 1989 Insp Rept 50-382/89-13 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings & Licensee Expeditious Actions Re Generic Ltr 88-17, Loss of Dhr ML20244C6951989-06-0808 June 1989 Insp Rept 50-382/89-12 on 890416-0531.Violations Noted. Major Areas Inspected:Monthly Maint Observation,Monthly Surveillance Observation,Onsite Followup of Events & Evaluation of Licensee QA Program Implementation IR 05000382/19890081989-05-16016 May 1989 Insp Rept 50-382/89-08 on 890301-0415.Violations Noted. Major Areas Inspected:Status,Monthly Maint Observation,Event Followup,Esf Walkdown & LER Followup IR 05000382/19890111989-05-0808 May 1989 Insp Rept 50-382/89-11 on 890327-31.Violations Noted.Major Areas Inspected:Engineering & Technical Support Activities & QA Audits of Activities IR 05000382/19890041989-04-18018 April 1989 Insp Rept 50-382/89-04 Cancelled ML20245C7281989-04-12012 April 1989 Insp Rept 50-382/89-07 on 890227-0303 & 890313-17.Violation Noted.Major Areas Inspected:Previously Identified Findings, Licensee self-assessment Capabilities & Procurement Activities ML20244A7551989-04-0303 April 1989 Insp Rept 50-382/89-09 on 890308-09.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings Associated W/Testing,Low Recirculation Flow Condition & Corrective Maint of HPSI Pump B ML20247K3951989-03-25025 March 1989 Insp Rept 50-382/89-06 on 890201-28.Violations Noted.Major Areas Inspected:Plant Status,Monthly Maint Observation, Operational Safety Verification,Onsite Followup of Events, ESF Walkdown & Followup of Previously Identified Items IR 05000382/19890101989-03-15015 March 1989 Cancels Insp Rept 50-382/89-10.No Insp Rept Will Be Issued for Rept Number ML20247A5101989-03-14014 March 1989 Insp Rept 50-382/89-05 on 890213-17.Violation Noted.Major Areas Inspected:Licensee Action on Previously Identified Violations & Unresolved Items Re Equipment Qualification of Electric Equipment IR 05000382/19890011989-03-14014 March 1989 Insp Rept 50-382/89-01 on 890117-0210.Violations Noted.Major Areas Inspected:Maint Performance,Overall Plant Performance Re Maint,Mgt Support of Maint & Maint Implementation ML20235Z7771989-03-0303 March 1989 Insp Rept 50-382/89-02 on 890109-13.Violations Noted.Major Areas Inspected:Followup of Previous Insp Items,Followup of NRC Info Notices & Bulletins Applicable to Procurement & Insp of 10CFR21 Activities ML20235M7561989-02-16016 February 1989 Insp Rept 50-382/89-03 on 890101-31.Violations Noted.Major Areas Inspected:Plant Status,Monthly Surveillance Operation, Onsite Followup of Events,Diesel Generator Fuel Oil QA & NRC Bulletin 87-002 & LER Followup IR 05000382/19880271988-11-22022 November 1988 Insp Rept 50-382/88-27 on 881017-27 & 881101-07.Violations Noted.Major Areas Inspected:Licensee Actions on Previously Identified Items Re Equipment Documented in NRC Insp Rept 50-382/86-32 on 870416 ML20195J6561988-11-17017 November 1988 Insp Rept 50-382/88-25 on 880917-1031.Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000382/19880261988-11-16016 November 1988 Insp Rept 50-382/88-26 on 881024-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings,Lers,Steam Generator Noise,& Replacement of Valve in Letdown Flow Sys IR 05000382/19880241988-11-0909 November 1988 Insp Rept 50-382/88-24 on 881011-13.No Violations or Deviations Noted.Eight Deficiencies Identified.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000382/19880211988-10-12012 October 1988 Insp Rept 50-382/88-21 on 880801-0916.Violation & Deviation Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Followup of Previously Identified Items,Operational Safety Verification & Monthly Maint Observation IR 05000382/19880231988-09-27027 September 1988 Insp Rept 50-382/88-23 on 880822-26 & 0919-23.Violations Noted.Major Areas Inspected:Potential Enforcement Findings Identified by Vendor Insp Branch in Insp Rept 50-382/87-19 ML20153D4311988-08-19019 August 1988 Insp Rept 50-382/88-19 on 880618-0731.Violations Noted. Major Areas Inspected:Enforcement Followup on Quality Verification Function Insp,Monthly Maint Observation, Allegation Followup & Operational Safety Verification ML20153C2521988-08-17017 August 1988 Insp Rept 50-382/88-20 on 880710-15.No Violations or Deviations Noted.Major Areas Inspected:Transportation of Radioactive Matls & Low Level Radwaste Mgt IR 05000382/19880181988-08-0909 August 1988 Insp Rept 50-382/88-18 on 880706-14.No Violations or Deviations Noted.Major Areas Inspected:Facility Emergency Operating Procedures,Including Control Room & Plant Walkdown,Simulator & Human factors-related Guidance ML20151E2391988-07-14014 July 1988 Insp Rept 50-382/88-13 on 880501-0617.Violations Noted.Major Areas Inspected:Monthly Maint Observation,Ler Followup, Containment Integrated Leak Rate Test,Plant Status & Followup of Previously Identified Items IR 05000382/19880171988-06-14014 June 1988 Insp Rept 50-382/88-17 on 880531-0603.One Violation & No Deviations Noted.Major Areas Inspected:Startup Testing IR 05000382/19880141988-06-13013 June 1988 Partially Withheld Insp Rept 50-382/88-14 on 880523-27 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Testing & Maint Program,Facility Lighting,Security Training & Qualification Plan & Safeguards Info Program IR 05000382/19880081988-06-0202 June 1988 Insp Rept 50-382/88-08 on 880316-0430.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Refueling Activity Observation,Esf,Sys Walkdown & Plant Status IR 05000382/19880101988-06-0101 June 1988 Insp Rept 50-382/88-10 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Effectiveness IR 05000382/19880121988-05-27027 May 1988 Insp Rept 50-382/88-12 on 880501-06.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Cycle 2 Refueling Outage ML20154S2301988-05-27027 May 1988 Insp Rept 50-382/88-16 on 880512-20.Potential Violation & Deviation Noted.Major Areas Inspected:Events Which Occurred & Actions Taken by Util Prior To,During & Subsequent to 880512 Incident Re Possible Loss of Shutdown Cooling IR 05000382/19882001988-05-16016 May 1988 Insp Rept 50-382/88-200 on 880201-12.Weaknesses Noted.Major Areas Inspected:Quality Verification Organization Ability to Identify,Resolve & Prevent Recurrence of safety-significant Deficiencies in Functional Areas of Plant Operations IR 05000382/19880111988-05-16016 May 1988 Insp Rept 50-382/88-11 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Inservice Insp & 10CFR21 ML20153E3091988-04-26026 April 1988 Insp Rept 50-382/88-09 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Licensee Surveillance Procedures & Records & Verification of RCS Leak Rates 1990-09-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
Text
1
. .
APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-382/86-06 License: NPF-38 Docket: 50-382 Licensee: Louisiana Power & Light Company (LP&L)
317 Baronne Street P. O. Box 60340 New Orleans, Louisiana 70160 Facility Name: Waterford Steam Electric Station, Unit 3 (W3 SES)
Inspection At: Taft, Louisiana Inspection Conducted: March 1-31, 1986 Inspectors-
'C (E Lueliman, Senior Resident Inspector Dat'e
=% w 9Y$o/k H. F. Bundyi Project Insp(ctor, Project Date Section C, Reac ~ ts Branch Approved: - o (
G. L 4Wnftable, Chief, Project Section C, D'at(
Reactor Projects Branch Inspection Summary Inspection Conducted March 1-31, 1986 (Report 50-382/86-06)
Areas Inspected: Routine, unannounced inspection of: (1) Followup on Potential Generic Problems, (2) Plant Status, (3) Licensee Event Report (LER) Followup, (4) Followup on Previously Identified Items, (5) Monthly Maintenance, (6) Monthly Surveillance, (7) ESF System Walkdown, (8) Routine Inspection, and (9) Inspection & Enforcement (I&E) Circular Results: Within the areas inspected, no violations or deviations were identified. One unresolved item was identified in paragraph 9 involving j deficiencies in a component cooling water valve lineup lis PDR ADOCK 05000382 G PDR ..
- _ _ _ . - _. -
. .
-2- '
DETAILS Persons Contacted ,
Principal Licensee Employees G. W. Muench, Acting Director, Nuclear Operations
- R. P. Barkhurst, Plant Manager, Nuclear T. F. Gerrets, Corporate QA Manager
- S. A. Alleman, Assistant Plant Manager, Plant Technical Services
- N. S. Carns, Assistant Plant Manager, Nuclear, Operations and Maintenance J. N. Woods, QC Manager A. S. Lockhart, Site Quality Manager R. F. Burski, Engineering and Nuclear Safety Manager K. L. Brewster, Onsite Licensing Engineer G. E. Wuller, Onsite Licensing Coordinator T. H. Smith, Maintenance Superintendent, Nuclear
- Present at exit interview In addition to the above personnel, the NRC inspectors held discussions with various operations, engineering, technical support, naintenance, and administrative members of the licensee's staf . Followup on Potential Generic Problems The NRC inspector made the licensee aware of problems involving the design adequacy of the auxiliary pressurizer spray system at Palo Verde Nuclear Generating System. At Palo Verde, the power supplies to certain valves were nonsafety grade, the auxiliary pressurizer spray system was lost during a loss of power tes No violations or deviations were identifie . Unresolved Items An unresolved item is a matter about which more infonnation is require'd to determine whether it is acceptable or may involve a violation or deviatio One unresolved item was identified during this inspection and is discussed in paragraph . Plant Status On March 7,1986', at 12:00 p.m. (CST)<the licensee commenced a functional test of the reactor power cutback system (RPCS). With the plant at full power, one of the two main feedwater pumps was secured. As expected, the
__ -
.
__- . . = .- - - . -
. .
l-3-
!
RPCS dropped a control element assembly (CEA) group to reduce reactor l power. The combination of an automatic turbine runback and steam bypass
- valve actuation stabilized the secondary plant. Following the successful completion of the test, the reactor was shut down for a maintenance outage
- with cold shutdown being reached at 11
- 26 p.m., March 8, 198 .
On March 22, 1986, after completing the 2 week outage, the licensee placed I
the plant in Mode 4. Because of electrical problems with two control
- element assembly drive systems, the plant was again placed in Mode l After the required repairs were made, the plant again entered Mode 4 on i
'
March 27, 1986, the reactor was taken critical on March 30, 1986, and synchronized with the grid at 7:20 p.m. the same da No violations or deviations were identifie i Licensee Event Report (LER) Followup
,
The following LERs were reviewed and close The NRC inspectors verified
! that reporting requirements had been met, that causes had been identified,
,
that corrective actions appeared appropriate, that generic applicability
- had been considered, and that the LER forms were complete. Additionally,
the NRC inspectors confirmed that no unreviewed safety questions were
- involved and that violations of regulations or
- Technical Specification (TS) conditions had been identified.
i'
(Closed) LER 382/85-21 - Automatic Actuation of Reactor Protective System.
The NRC inspector verified that Station Modification SMP-464 has been completed. This modification installed a time delay in the main feedwater pump low suction trip logic which should prevent pump trips due to momentary perturbations in the condensate and condensate polisher system Because of similar events reported in LERs 85-10 and 85-20, the licensee is also pursuing the corrective actions which are detailed in those i reports. The actions include procedure changes as well as a modification
- of the vibration trip for the feedwater pump ! (Closed) LER 382/85-48 - Control Room Isolation. This event is one of
,
several similar events the licensee has reported. Sometimes during normal planned plant stack releases the wind direction is such that sogie of the j released gases are directed into the control room ventilation intake.
Although such events are not desirable, the amount of gas is small and the
- events infrequent. The licensee has been examining what changes, if any,
! can be made to correct the problem. However, location of permanent plant j structures seems cc play a major role and these cannot easily be change ,
No violations or deviations were identifie . Followup on Previously Identified Items I (0 pen) Violation 382/8520-04 - The NRC inspector has reviewed the licensee's response as well as the Region IV reply to that lette Because of problems with both the control room ventilation ammonia and
,
_, , , -
_.. _ . _ . _ _ . - - . _ _ . , - , _ _ ~ . - , , , _ _ _ , , _ . _ . _ . . _ . . . _ - . , _ - _. -
, ,
t-4-chlorine monitors, the licensee continues to operate t,he control room ventilation in the recirculation mode for extended periods of time. This configuration is permitted for an indefinite amount of time by both Technical Specifications (TS) 3.3.3.7.1 and 3.3.3.7.2. When operating in this configuration, the control room emergency outside air intakes are kept shut for toxic gas considerations by the problem ammonia and chlorine monitors, thereby preventing the automatic pressurization of the control room with the ventilation in the high radiation mode of operation. This being the case, the licensee has analyzed t%e consequence of dispatching an operator to manually open the emergency' air intakes, if require Though this task has been analyzed and can safely be accomplished, the licensee has not proceduralized the evolutio If the licensee is forced to continue to ' operate in control room recirculation for long periods of time, procedures should be updated to ensure the emergency air intakes are cpened manually if a toxic gas sipal prevents immediate automatic switchover. The Office of Nuclear Reactor 3 Regulation (NRR) is currently evaluating control room habitability including these normal, recirculation and pressurized modes of operatio In reply to the licensee's response to this violation, W Region IV suggested the licensee review the process used to perform 10 CFR t
Part 50.59 reviews. The licensee responded by performing various QA audits of different aspects of the proces Observation (c) of Audit SA-W3-QA-85-58A indicated that no formal 10 CFR Part 50.59 evaluation training has been given to those individuals tasked with makinq
'; or approving the reviews. The NRC inspector discussed this observation with the assistant plant manager for technical services. The need to provide such training is being evaluate ~'
(Closed) Open Item 50-382/8602-02 - This item involved correction of deficiencies identified in the startup report by the NRC inspector The licensee submitted the required changes to the NRC Regional Administrator s
on March 14, 1986, via Cover Letter W3P86-004 (Closed) Deviation EA 85-10 - This deviation, involving failure to complete certain hydrostatic tests in accordance with FSAR commitments, was included in an enforcement package. The licensee responded individually to it by letter on June 21, 1985, and Region IV accepted this response on October 8, 198 The NRC inspector verified that all actions had been satisfactorily completed with the exception of issuance of the FSAR change It is closed on the basis that the FSAR changes have been made and placed in the suspense fil No violations or deviations were identifie . Monthly Maintenance Station maintenance activities affecting safety-related systems and, ,
components were observed / reviewed to ascertain that the activities were
. , .
-5-conducted in accordance with approved procedures, regulatory guides and industry codes or standards, and in conformance with T The NRC inspector observed a portion of the work done on Valves SI-4128 and SI-125B under Procedure ME-7-008, " Motor Operated Valves." In addition to verifying calibration of measuring and test equipment (M&TE)
used, the NRC inspector reviewed the procedure with the electrician to verify his familiarity with the work in progres No violations or deviations were identifie . Monthly Surveillance The NRC inspectors observed / reviewed TS required testing and verified that testing was performed in accordance with adequate procedures, that test instrumentation was calibrated, that limiting conditions for operation (LCO) were met, and that any deficiencies identified were properly reviewed and resolve On the morning of March 7,1986, the A Emergency Diesel Generator (EDG)
tripped while loaded for Surveillance Test OP-903-068, " Emergency Diesel Generator Operability Verification." The NRC inspector verified that the requirements of Technical Specification (TS) 3.8.1.1, Action a, were perfonned by observing the operability test of the EDG and by reviewing the verification done of the breaker alignment between the offsite transmission network and on,ite Closs IE distribution (0P-903-066).
The NRC inspector reviewed a number of the plant surveillance procedures including OP-903-069, Revision 3, " Integrated EDG/ Engineered Safety Features." Step 7.5.1.1 of that procedure requires that the EDG be run loaded for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with the load for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 4840 KW. This portion of the surveillance procedure is conducted to meet the requirements of Technical Specification (TS) Requirement 4.8.1.1.2.d.7. W3 SES Final Safety Analysis Report (FSAR) states, in paragraph 8.3.1.1.2.13.k, that 4840 KW is the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> out of 24 supplementary power rating with 4400 KW being the continuous power rating. The NRC inspector brought to the licensee's attention that the surveillance procedure has no upper bound on EDG power output when conducting the surveillance. Potentially, the EDG could be run in an overload condition while performing the test. The EDG power and supplementary power ratings illustrate that there is significant drop in allowable time with only a 10 percent increased load. The NRC inspector suggested that LP&L consider how far above 4840 KW the EDG can be safely run and for how long and whether a change of the EDG surveillance procedure to incorporate an upper limit on EDG output is warrante No violations or deviations were identifie l l
.
>
I
...
-6- ESF System Walkdown On March 18-21, 1936, the NRC inspectors reviewed the component cooling water system standby valve lineup (OP-2-003, Revision 3, Attachment 8.1), ,
reviewed the applicable plant drawings (LOU-1564 G-160, Sheets 1-3) and performed a walkdown of selected essential and accessible portions of the system to verify operabilit At the completion of the system inspection, the inspectors had the following observations: OP-2-003, Revision 3, Attachment 8.1, has many incorrect drawing j sheet and grid number reference The procedure contains numerous typographical and other nomenclature
,
error A number of valves are listed to be checked more than once on the l valve lineu '
\
j Tne following valves are not on the valve lineup, but are on the
- drawings
CC-309A CC-309B CC-4148 CC-613 CC-937B CC-1791B CC-1891A CC-1891B CC-1981B CC-2001 CC-5351A CC-5251B CC-6012 CC-6013 CC-8021 CC-8061 CC-8062 CC-8063 CC-9011B CC-80310B CC-80313B It appears many of these valves have been added to the drawing by station modifications (SMs). CC-309A and B do appear on the monthly lineup check, OP-903-049, Attachment 1 The following valves are on the valve lineup but appear not to be on the drawings:
CC-199B CC-4178 CC-560 CC-7201 CC-8036A CC-8038A CC-8039A CC-8039B All main flow path valves were correctly identified in the valve lineup and found correctly positioned during the walkdow The above deficiencies are ihntified as an unresolved item (URI)
50-382/8605-0 No violations or deviations were identifie . Routine Inspection By observation during the inspection period, the NRC inspectors verified that the control room manning requirements were being met. In addition,
.- . = . - ._ - . .
. .. .
j -7-the NRC inspectors observed shift turnover to verify that continuity of system status was maintained. The NRC inspectors periodically questioned shift personnel relative to their awareness of the plant condition Through log review and plant tours, the NRC inspectors verified compliance with selected TS and limiting conditions for operation During the course of the inspection observations relative to protected and vital area security were made including access controls, boundary integrity, search, escort, and badgin On a regular basis, radiation work permits (RWP) were reviewed and the specific work activity was monitored to assure the activities were being conducted per the RWP Selected radiation protection instruments were periodically checked and equipment operability and calibration frequency were verifie The NRC inspectors kept informed on a daily basis of overall status of plant and of any significant safety matter related to plant operations.
'
Discussions were held with plant management and various members of the operations staff on a regular basi Selected portions of operating logs and data sheets were reviewed dail The NRC inspectors conducted various plant tours and made frequent visits of the control room. Observations included: witnessing work activities
- in progress; verifying the status of operating and standby safety systems
'
and equipment; confirming valve positions, instrument and recorder readings, annunciator alarms; and housekeepin Additionally, during the maintenance outage, the NRC inspector made a tour of the reactor containment. During this tour, area cleanliness and work in progress were observed. A brief inspection was made of the pressure boundary closure studs on one of the reactor coolant pumps (RCPs) to assess the extent of boric acid buildup due to possible primary fluid leakage from gasket joints on the RCP. Some boric acid buildup was observed but it was judged not to be excessive. The 2B RCP has apparently had an appreciable amount of leakage at the seal cooling heat exchanger and consequently Combustion Engineering, Inc. (CE) recommended inspection of that gasket joint during the maintenance outage followed by inspection of all bolted closures on the seal cooling heat exchangers and seal cartridge joints auring refueling outages. Further, CE recommended that, as long term corrective actions, the present stainless steel gaskets be replaced with Inconel/Grafoil gaskets and that the present carbon steel closure studs be replaced with studs made of 17-4 precipitation hardened (PH) stainless steel. The new gaskets are felt to be better because they have a greater springback capability and are more likely to remain leak tight in an area that has some differential in expansion / contraction during heatup/cooldown. The 17-4 PH stainless steel
'
studs and those made of Inconel 718 are superior to the present studs because increased resistance to boric acid wattage. The 17-4 PH stainless steel studs are recommended over the ones made of Inconel 718 chiefly because of the smaller probability of galling problems.
J
, - . . . -y - - - - , , . ,y
..__ _ _ _ _ . _ _ _ _ . _ . . . - _ _ _ - _ . . . _ . _ . _ . _ _ _ ._ . _ _ _ . ._ _
.
- ..
. .. .
,
-8-l
'
The licensee has inspected all the RCPs and found the smaller diameter studs (which are stainless steel), such as those on the control bleedoff line, to be in good condition. The amount of boric acid buildup around
'
- the nuts on the larger carbon steel studs was found to be acceptable. The
! licensee presently has plans to replace the gaskets and carbon steel studs beginning the first refueling outage.
No violations or deviations were identifie . Inspection & Enforcement (IE) Circulars
- The licensee's actions on the following IE Circular has been reviewed and the IE Circular is considered closed because it is not applicable to
J W3 SES.
j (Closed) IEC 78-14 - HPCI Turbine Reversing Chamber Hold Down Bolting.
i No violations or deviations were identifie . Exit Interview i
The inspection scope and findings were summarized on March 31, 1986, with
'
those persons indicated in paragraph 1 above. The licensee acknowledged the NRC inspectors findings. The licensee did not identify as proprietary any of the material provided to or reviewed by the NRC inspectors during this inspection.
'
!
,
!