Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000382/19900221990-10-23023 October 1990 Insp Rept 50-382/90-22 on 900905-1001.Violations Noted.Major Areas Inspected:Followup of Events,Monthly Maint & Surveillance Observation,Operational Safety Verification, Followup of Previously Identified Items & LER Followup IR 05000382/19900211990-10-12012 October 1990 Insp Rept 50-382/90-21 on 900910-14.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radwaste Mgt Program IR 05000382/19902001990-09-10010 September 1990 Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810. Major Areas Inspected:Plant Design Features,Sys,Equipment, Procedures,Operations Activities & Human Actions That Could Affect Initiation or Progress of Interfacing Sys LOCA IR 05000382/19900171990-08-27027 August 1990 Insp Rept 50-382/90-17 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program Including Changes to Emergency Plans & EPIPs & Changes to Emergency Facilities IR 05000382/19900111990-07-29029 July 1990 Insp Rept 50-382/90-11 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program.Licensee Implemented Effective Program & Personnel Highly Qualified & Motivated IR 05000382/19900141990-07-17017 July 1990 Insp Rept 50-382/90-14 on 900625-29.Violation Noted.Major Areas Inspected:Containment Local Leak Rate Testing Data, Surveillance Test & Calibr Program & Followup of Previous Insp Findings IR 05000382/19900101990-07-0505 July 1990 Cancelled Insp Rept 50-382/90-10 IR 05000382/19900091990-06-26026 June 1990 Errata to Insp Rept 50-382/90-09,inserting Page 6a.No Violations or Deviations Noted ML20055C7821990-06-14014 June 1990 Insp Rept 50-382/90-09 on 900501-31.No Violations or Deviations Noted.One Unresolved Item Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890231989-09-26026 September 1989 Insp Rept 50-382/89-23 on 890801-31.No Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification IR 05000382/19890251989-09-21021 September 1989 Insp Rept 50-382/89-25 on 890828-0901.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Qualification & Training & Licensee QA & Contractor Audits IR 05000382/19890161989-09-15015 September 1989 Insp Rept 50-382/89-16 on 890717-21.Violation Noted.Major Areas Inspected:Operations Procedures IR 05000382/19890221989-08-0909 August 1989 Insp Rept 50-382/89-22 on 890701-31.Violation Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Operational Safety Verification & LER Followup IR 05000382/19890201989-07-25025 July 1989 Insp Rept 50-382/89-20 on 890705.No Violations or Deviations Noted.Major Areas Inspected:Svc Failure of Shaft in Chilled Water Pump B IR 05000382/19890171989-07-14014 July 1989 Insp Rept 50-382/89-17 on 890601-30.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation & Operational Safety Verification IR 05000382/19890181989-07-13013 July 1989 Insp Rept 50-382/89-18 on 890626-30.Noncited Violation Noted.Major Areas Inspected:Corrective Action Program & Licensee Actions on Previously Identified Findings IR 05000382/19890151989-07-0606 July 1989 Insp Rept 50-382/89-15 on 890605-09 & 20-21.No Violations or Deviations Noted.Major Areas Inspected:Storage of Emergency Diesel Generator Fuel Oil,Containment Bldg Temp Profiles & Action on Previously Identified Insp Findings IR 05000382/19890141989-07-0303 July 1989 Insp Rept 50-382/89-14 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Effluent Control Programs & Review of Special & Semiannual Effluents Repts IR 05000382/19890131989-06-14014 June 1989 Insp Rept 50-382/89-13 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings & Licensee Expeditious Actions Re Generic Ltr 88-17, Loss of Dhr ML20244C6951989-06-0808 June 1989 Insp Rept 50-382/89-12 on 890416-0531.Violations Noted. Major Areas Inspected:Monthly Maint Observation,Monthly Surveillance Observation,Onsite Followup of Events & Evaluation of Licensee QA Program Implementation IR 05000382/19890081989-05-16016 May 1989 Insp Rept 50-382/89-08 on 890301-0415.Violations Noted. Major Areas Inspected:Status,Monthly Maint Observation,Event Followup,Esf Walkdown & LER Followup IR 05000382/19890111989-05-0808 May 1989 Insp Rept 50-382/89-11 on 890327-31.Violations Noted.Major Areas Inspected:Engineering & Technical Support Activities & QA Audits of Activities IR 05000382/19890041989-04-18018 April 1989 Insp Rept 50-382/89-04 Cancelled ML20245C7281989-04-12012 April 1989 Insp Rept 50-382/89-07 on 890227-0303 & 890313-17.Violation Noted.Major Areas Inspected:Previously Identified Findings, Licensee self-assessment Capabilities & Procurement Activities ML20244A7551989-04-0303 April 1989 Insp Rept 50-382/89-09 on 890308-09.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings Associated W/Testing,Low Recirculation Flow Condition & Corrective Maint of HPSI Pump B ML20247K3951989-03-25025 March 1989 Insp Rept 50-382/89-06 on 890201-28.Violations Noted.Major Areas Inspected:Plant Status,Monthly Maint Observation, Operational Safety Verification,Onsite Followup of Events, ESF Walkdown & Followup of Previously Identified Items IR 05000382/19890101989-03-15015 March 1989 Cancels Insp Rept 50-382/89-10.No Insp Rept Will Be Issued for Rept Number ML20247A5101989-03-14014 March 1989 Insp Rept 50-382/89-05 on 890213-17.Violation Noted.Major Areas Inspected:Licensee Action on Previously Identified Violations & Unresolved Items Re Equipment Qualification of Electric Equipment IR 05000382/19890011989-03-14014 March 1989 Insp Rept 50-382/89-01 on 890117-0210.Violations Noted.Major Areas Inspected:Maint Performance,Overall Plant Performance Re Maint,Mgt Support of Maint & Maint Implementation ML20235Z7771989-03-0303 March 1989 Insp Rept 50-382/89-02 on 890109-13.Violations Noted.Major Areas Inspected:Followup of Previous Insp Items,Followup of NRC Info Notices & Bulletins Applicable to Procurement & Insp of 10CFR21 Activities ML20235M7561989-02-16016 February 1989 Insp Rept 50-382/89-03 on 890101-31.Violations Noted.Major Areas Inspected:Plant Status,Monthly Surveillance Operation, Onsite Followup of Events,Diesel Generator Fuel Oil QA & NRC Bulletin 87-002 & LER Followup IR 05000382/19880271988-11-22022 November 1988 Insp Rept 50-382/88-27 on 881017-27 & 881101-07.Violations Noted.Major Areas Inspected:Licensee Actions on Previously Identified Items Re Equipment Documented in NRC Insp Rept 50-382/86-32 on 870416 ML20195J6561988-11-17017 November 1988 Insp Rept 50-382/88-25 on 880917-1031.Violations Noted. Major Areas Inspected:Plant Status,Onsite Followup of Events,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000382/19880261988-11-16016 November 1988 Insp Rept 50-382/88-26 on 881024-26.No Violations or Deviations Noted.Major Areas Inspected:Followup to Previous Insp Findings,Lers,Steam Generator Noise,& Replacement of Valve in Letdown Flow Sys IR 05000382/19880241988-11-0909 November 1988 Insp Rept 50-382/88-24 on 881011-13.No Violations or Deviations Noted.Eight Deficiencies Identified.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000382/19880211988-10-12012 October 1988 Insp Rept 50-382/88-21 on 880801-0916.Violation & Deviation Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Followup of Previously Identified Items,Operational Safety Verification & Monthly Maint Observation IR 05000382/19880231988-09-27027 September 1988 Insp Rept 50-382/88-23 on 880822-26 & 0919-23.Violations Noted.Major Areas Inspected:Potential Enforcement Findings Identified by Vendor Insp Branch in Insp Rept 50-382/87-19 ML20153D4311988-08-19019 August 1988 Insp Rept 50-382/88-19 on 880618-0731.Violations Noted. Major Areas Inspected:Enforcement Followup on Quality Verification Function Insp,Monthly Maint Observation, Allegation Followup & Operational Safety Verification ML20153C2521988-08-17017 August 1988 Insp Rept 50-382/88-20 on 880710-15.No Violations or Deviations Noted.Major Areas Inspected:Transportation of Radioactive Matls & Low Level Radwaste Mgt IR 05000382/19880181988-08-0909 August 1988 Insp Rept 50-382/88-18 on 880706-14.No Violations or Deviations Noted.Major Areas Inspected:Facility Emergency Operating Procedures,Including Control Room & Plant Walkdown,Simulator & Human factors-related Guidance ML20151E2391988-07-14014 July 1988 Insp Rept 50-382/88-13 on 880501-0617.Violations Noted.Major Areas Inspected:Monthly Maint Observation,Ler Followup, Containment Integrated Leak Rate Test,Plant Status & Followup of Previously Identified Items IR 05000382/19880171988-06-14014 June 1988 Insp Rept 50-382/88-17 on 880531-0603.One Violation & No Deviations Noted.Major Areas Inspected:Startup Testing IR 05000382/19880141988-06-13013 June 1988 Partially Withheld Insp Rept 50-382/88-14 on 880523-27 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Testing & Maint Program,Facility Lighting,Security Training & Qualification Plan & Safeguards Info Program IR 05000382/19880081988-06-0202 June 1988 Insp Rept 50-382/88-08 on 880316-0430.Violations Noted.Major Areas Inspected:Onsite Followup of Events,Monthly Maint Observation,Monthly Surveillance Observation,Refueling Activity Observation,Esf,Sys Walkdown & Plant Status IR 05000382/19880101988-06-0101 June 1988 Insp Rept 50-382/88-10 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Effectiveness IR 05000382/19880121988-05-27027 May 1988 Insp Rept 50-382/88-12 on 880501-06.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Cycle 2 Refueling Outage ML20154S2301988-05-27027 May 1988 Insp Rept 50-382/88-16 on 880512-20.Potential Violation & Deviation Noted.Major Areas Inspected:Events Which Occurred & Actions Taken by Util Prior To,During & Subsequent to 880512 Incident Re Possible Loss of Shutdown Cooling IR 05000382/19882001988-05-16016 May 1988 Insp Rept 50-382/88-200 on 880201-12.Weaknesses Noted.Major Areas Inspected:Quality Verification Organization Ability to Identify,Resolve & Prevent Recurrence of safety-significant Deficiencies in Functional Areas of Plant Operations IR 05000382/19880111988-05-16016 May 1988 Insp Rept 50-382/88-11 on 880418-22.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Inservice Insp & 10CFR21 ML20153E3091988-04-26026 April 1988 Insp Rept 50-382/88-09 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Licensee Surveillance Procedures & Records & Verification of RCS Leak Rates 1990-09-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
Text
.__ _ _ _ - - _ _ _ _ _ _ - _ _ _ _ _
. .
APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION
REGION I
NRC Inspection Report: 50-382/86-31 License: NPF-38 Docket: 50-382 Licensee: Louisiana Power & Light Company (LP&L)
N-80 317 Baronne Street New Orleans, Louisiana 70160 Facility Name: Waterford 3 Inspection At: Taft, Louisiana Inspection Conducted: December 1-11, 1986 Inspectors: ~7_ 2 6 [
H. W. Kerch, Lead Reactor Engineer Date'
'
__
. HarrTs,'NDE Technician
-
I A/2d/f7 Date
' '
Approved: _ 2- Md' 2d5/67 R. Strosnider, Chief, M & P.S., EB, DRS Date Inspection Summary Inspection Conducted December 1-11, 1986 (Report 50-382/86-31)
Areas Inspected: A special, announced independent verification inspection of plant modifications and inservice inspection was performed using the NRC Nondestructive Examination Mobile Van. Two Regional based inspection personnel assisted by two contractor NDE personnel were utilized during this inspectio The purpose of this inspection was to evaluate the plant modification program and ascertain the condition of plant materials through various NDE technique Results: Within the two areas inspected, two violations were identified (failure to follow instructions and failure to control nonconforming components, paragraph 3).
8703100227 870304 PDR ADOCK 05000382 G PDR _
.__ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _
. _ _ -
,
-.- .
, 2 DETAILS Persons Contacted Louisiana Power & Light-(LP&L)
- Schultz, Station-Supervisor
- Forgala, Shift Supervisor
- A. S. Lockhart, Nuclear Support Manager
- J. D. Dewease, Senior Vice President -_ Nuclear
- R. C. Barkhurst, Vice President - Nuclear
- N. S. Carns, Plant Manager - Nuclear
- R. F. Burski, Engineering Manager
- G. W. Robin, Inservice Inspection
- T. F. Gerrets, Nuclear QA Manager
- J. G. Dickinson, NDE Level III J. R. McGaha, Assistant Plant Manager G. E. Wisler, Licensing L. L. Bass, Nuclear Operations Engineer T. H. Smith, Maintenance Superintendent U.S. Nuclear Regulatory Commission
- L. D. Gilbert, Reactor Inspector, RIV
- B. A. Breslau, Reactor Engineer, RIV
- T. R. Staker, Resident Inspector, RIV
- J. I. Tapia, Reactor Inspector, RIV
- Denotes those present at exit meetin . Purpose of Inspection-The purpose of this inspection was to evaluate the licensee's modification program and its implementation as demonstrated by the installation of a supplemental fuel pool heat exchanger performed during the plant outag The inspection included review of procedures, review of modification records, review of the ISI program, and review of quality assurance activitie The inspection activities included various independent nondestructive examinations (NDE), observations of work in progress, and
- review of record . NRC Conducted Nondestructive Examinations During the period of December 1-11, 1986, an onsite inspection was conducted at Waterford Power Plant Unit 3. The inspection included independent nondestructive examinations of safety related piping and supports to verify their acceptability and the effectiveness of the licensee NDE and QA/QC program _ . . - ..
_ ,
k
. .
, ,
T
'
i 3-
,
~
A random sample of f safety related pipe weldsents and associated ' supports was selected from the plant modification package (SMP-107)Lfor installation'of a supplemental fuel pool cooling heat exchanger. I addition to the above,;other safety related' piping included in the. plant Inservice Inspection Program was selected for independent' inspection by the NR All items selected were previously inspected and accepted by the licensee, based on information_ supplied (QA/QC records) by the license Nondestructive. examinations were performed'using NRC procedure , , Isometrics and drawings supplied by-the licensee were used in conjunction
-
with the procedure The following examinations were performed by two NRC-inspectors and two
, contracted NDE personnel.+
~
It was intended that, to'the extent practicable,.these inspections would be conducted in a similar manner, i.e., using the same. techniques and code specified procedures and acceptance criteria, as the original examination '
Liquid Penetrant Thirty-six safety-related pipe weldments and adjacent base material 4 (1/2 inch on either side of:the weld) were examined by.the visible dye method per NRC procedure NDE-9, Revision 0, and' Westinghouse procedure WTR-ISI-11, Revision 0. Samples' included in this selection were
, ASME Code Class 1, 2, and 3 carbon and stainless steel weldment Results: No violations were identifie Thickness Measurements:
Seventeen safety-related pipe weldments and adjacent base material (1/2. inch on either side of the weld) were examined using a NOVA-D 100 digital thickness gauge per NRC procedure NDE-11, Revision 0. The
' required minimum wall thickness was determined by use of an ASTM standard pipe size and nominal thickness chart.
,
Results: No violations were identified.
.
Ferrite Measurements:
. Ten' safety-related pipe weldments were examined for delta ferrite content using a type II ferrite indicator (Severn Gauge). This test is intended to ' verify that the welding filler metal composition had achieved an as-deposited delta ferrite content sufficiently high to eliminate hot
< crackin Results: No violations were identified.
!'
. . .. . . . - . . . - . , . - - - - ~ -- . . - - . - - - . - - - - . . .. , . _ ., - - - - - - , _ , , , - , - - _ _ - , . .
o .
..- .
-
Hardness Test:
Seven safety related pipe weldments and adjacent base material were tested using the'Equo-Tip, hardness tester per NRC procedure NDE-12, Revision ~
Measurements taken;from the impact. device are processed into "L" values as a digital readout; the "L" valuesf are then converted to Brinell hardness
- values and approximate tensile strengths by means of a conversion tabl 'Results
- .No violations were identifie' . Ultrasonic Examination: ,
Ten safety-related pipe weldments were ultrasonically examined using a Sonic Mark'1 ultrasonic flaw detector per NRC-procedure NDE-1, Revision 0, Westinghouse procedure WTR-ISI-206, Revision 0, and associated ultrasonic data reports. LInstrument calibration (linearity-verification) was performed using NRC procedure NDE-2, Revision 0, and the distance amplitude correction (DAC) function was constructed using the licensee's calibration blocks,.UT-115, UT-105, UT-119 and UT-141 for this examination. Instrument settings and search unit (transducer) were matched as nearly as possible to those indicated by the licensee's ultrasonic data reports in order to attempt to duplicate the original ultrasonic examination Results: Welds61-073 and 61-080 on drawing WTR-2-4107, welds56-040 and 56-042 on drawing WTR-2-4211 and weld 52-019-900 on drawing WTR-2-4205 could not be examined ultrasonically with complete coverage due to physical restrictions. These restrictions were noted in the' licensee's ultrasonic data reports and verified during the NRC inspectio No violations were identifie Visual Examination:
l Forty-six safety-related pipe weldments and adjacent base material were examined for cracks, gouges, linear indications, reinforcement and surface condition that could interfere with the performance of inservice inspection. Visual examinations were performed using NRC procedure NDE-10, Revision 0, in conjunction with site documents. Samples in this examination include ASME Code Class 1, 2, and 3 carbon and stainless steel pipin A sample of 14 supports that were part of the supplemental Fuel Pool Heat Exchanger modification were selected for detailed review (see attachment 2). The supports had been installed and quality control (QC)
accepted. The supports selected were ASME III Class 3, Seismic
'
Category I. The Supports were examined for member size; configuration and dimensions; installation of pins and locknuts; weld appearance and clearances.
L _
- - ,= . -
+_
-_
g 3 ,
"
%
QL
'
,
> q. Q , y _
- -
,
.. .. # -
~
. .
T ff^
.
g ,
,
.
g -
. c
~
yi b -
.
J' '
' .Results_
,;v -
'm
,
.In general, the modifications met the requirements for design drawing ~"
.However, discrepancies were identifiedLon the following hardware:
~
.
- , .
A; '
.q 1S upport number FSRR-4001: - Drawing required lock nut missing ,
~
'
. Support number FSRR-4004: Locknuts not engaged-per specification.and
<
'
~ Cotter, Keys'not installed properl *
." -' Support number FSRR-4010: _ Required weep hole not drille :
Support number.CCRR-4521: . Locknuts not engaged per specification and
..,. Cotter keys.not installe These-items are considered a violation of 10 CFR,. Appendix'B, Criterion'V'
-(382/8631-01).-
" Also, the following discrepancies in documentation were identified:
. Welds FSRR-4002-FW1 and FSRR-4002-FW2 were rejected by QC, however,
. -the' weld records indicated that the completed welds were acceptable without having been reinspected by-QC for the rejectable attribut *
Welds FS-SM-107-M3-FW6'and FS-SM-107-M4-SW8 were rejected due to'
-
excessive _ fit up gap (greater than 5/32 of an inch). Proper disposition was not documented for these nonconforming conditions in
, accordance.with. site administrative' procedure QP-015-001, Revision 3, Nonconformances and Corrective Action Results:
~
These items'are considered a violation.of 10 CFR, Appendix B, Criterion XV (382/8631-02).
' Review of Procedures >
The procedures listed in Attachment Number 3 were reviewed to verify their technical adequacy and conformance to regulation and code requirement ,
-
Results:
Review of Procedure QA.2.4, Revision 0, Qualification and Certification of
-
-
Visual Examination Personnel for Preservice and Inservice Inspections,
-indicated the procedure does.not meet the industry standard nor are there
. precedents within the referenced ASNT and ANSI documents for the liberties taken. The following are examples:
-
The procedure allows reduction of experience by 33-1/3 percent in
-
accordance with ANSI 45.2.6 (1978). However, the procedure permits further reduction of the required experience by an additional
a w % -. w.2, - --w, e-ev-- tw~+-~'te* --e--+*'- P+ 1--ww & ==---,==w--Nn -w 'er-+-wm*-,-www w-* -4--w~- w--w---
- .- .
m
m L50 percent :if the individual 'is certified to Level II for'at 'least three NDE method There is no apparent basis why an-individual who is certified Level II in PT, MT, and UT should have the require experience' level for VT3 and VT4 reduced by 50 percen *
iFurthermore, the p'rocedure eliminates the requirement for an
~
individual to take a practical-exam if he has a specified amount of
' training. . There is no basis presented for this relaxation in
, requirement This-issue is considered unresolved pending the licensee's evaluation and justification and subsequent NRC review (382/8631-03).
5. -Review of Modification SM-107 Inspection was concentrated on the installation of a Backup Spent Fuel Fool Cooling heat exchange Cooling water lines and related accessories on the 35-foot elevation in the Fuel Handling Building were inspecte The heat exchanger and its interconnecting piping are safety-related equipment and were designed to ASME Section III, Class-3 requirement The backup spent fuel pool cooling system is a Seismic Category I installatio .
The following documents were reviewed in order to-determine if the licensee's program for control of design changes and modifications-had been adequately implemente Ebasco's independent design verification for modification SM-10 *
Ebasco's Quality Assurance review of the independent design verification for modification SM-10 *
Ebasco's procedure control for design changes and modifications E6 The NRC inspectors examined the as-built configuration of the system and compared this configuration to the piping and hanger isometric drawings and specifications. Several discrepancies were noted as discussed in
-
Section 3. The type of discrepancies found indicate that site installation procedures were not properly implemented to ensure that quality requirements were me . Review of the Inservice Inspection (ISI) Program The Waterford 3 ISI program was prepared and is implemented by the licensee. The plan meets the requirements of ASME Section XI 1980 edition including addenda through Winter 1981. This outage was the first in the first 10 year interval of the ISI progra ,. . _ - - _ - . - - . .- -
- - . ;
o s,
Organization and Staffing of ISI Program The Waterford 3 Plant Manager - Nuclear has the prime responsibility for coordinating and conducting the ISI Program. The inspector concluded that Waterford 3 has adequate staff comprised of site personnel, augmented by contract personnel, to properly execute the ISI progra Quality Assurance Audits of ISI The inspector reviewed the documents. listed below to. ascertain that ISI vendors are audited by the QA department prior to their being considered as a-qualified supplier of ISI service LP&L Audit report on Westinghouse for ISI Contract (dated January 8-10, 1985).
.
LP&L Audit report on Westinghouse for ISI Contract (dated August 29, 1986).
The audit reports indicated that various aspects of the ISI Program were examined, audit findings were properly closed out, and that the licensee's ISI vendor was properly qualified as a supplier of ISI service ISI Personnel Record Review The inspector reviewed 24 nondestructive examination ~(NDE) personnel qualification and certification records.- One individual was identified for which additional information was required to justify marginal experience at the' time of his certification. The individual had received adequate experience since his certificatio The inspector had no further concerns on this ite Inservice Inspection (ISI) Data Review During this inspection the inspector reviewed all the ISI data that had been taken as of December 9, 1986. The total count was:
24 ultrasonic examinations
- 117 visual examinations l
19 liquid penetrant examinations
i 2 magnetic particle examinations The inspector verified that the examinations were done in compliance with governing procedures and that applicable ASME code and Regulatory requirements were met. The review also was undertaken to verify that the licensee had properly recorded the evaluations. A licensee employee with a Level III NDE certification reviewed all NDE ISI data and his signature on each of the NDE data reports was required for acceptance of those report __ _ _ , _ - . - - - .
. _ _ . . . - _
,
. ,
,
. l 8 l Overall, the. inspector found that the Inservice Inspection Pro' gram at
~
Waterford 3 including its documentation,is being performed adequately and that the_ objectives of the ISI program are being met. No violations were identifie . Attachments:
Attachment No.'1 is a tabulation of piping weldments inspected and the results. Attachment Nc. 2 is a tabulation of_ specific pipe supports inspected during this inspection and the inspection results. Attachment
.No.' 3 is a list of procedures reviewed during this inspectio . Unresolved Items Unresolved' items are those for which more information is necessary for the
-
NRC to determine whether the item or items are acceptable, a violation or a deviation. An unresolved item is contained in Section . Exit On December 11,-1986, the NDE Van personnel attended an exit meeting with the. licensee: staf . The findings of this' inspection were described' at
'this meetin No written material was~provided;to-the licensee during this inspectio .
1 ~
~
S
'3 K R
d A r M 2 E
'f R r
e t
a W L A
U C C C C C C C C C C C C
- S C C C C C C C C C C C C E
T I
V A, A A A A A A A A A A A I
S II1 S
S E-N D A C C A A A A A A A A A R / C C / / / / / / / / /
A- N A A N N N N N N N N N H
_
_
,
, . C C C C C C C C C C C C C C C C C C C C C C C C A A A A A A A A A A A A P
. A A A A A A A A A A A A
/ / / / / / / / / / / /
U N N N N N N N N N N N N
_
. A A A A A A A A A A A A
/ / / / / / / / / / / / N N N N N N N N N N N N R
. A A A A A A A A A A A A
/ / / / / / / / / / / / N N N N N N N N N N N N M
M A
R G K O C C C C C C C C C A A A A R I C C C C C C C C / / / /
P H A A A A A A A A N N N N T
T N
E M
E E R T U I C C C C C A A A C A C C S R C C C C C / / / C / C C A R A A A A A N N N A N A A E E M F T
N E
D N OL A A A A A A A A A A A A E LA / / / / / / / / / / / /
P LN N N N N N N N N N N N N E AA D
N I
S S
A 3 3 3 3 3 3 3 3 3 3 3 3 L
C
f c R E
8 #
1 B 3 2 MO M M t 3 US - - n g NI 7 7 e
/ 0 0 m P DE 1 1 h LN - - 0 1 3 6 7 c EI S1 1 2 2 3 S9 1 6 1 1 2 2 a WL CW RF W
S N W S
W F
CW RF W
F W
F W
F W
F W
S W
S t
t illA
'
. _
- S 3 K R A r M c E f R'
r z
t+
a W L A
U C C C C C C C C C C C
- S C C C C C C C C C C C E I A A A A A A A A A A A T
I V
S lll j S
S E-N D A A A A A A C C C C C R / / / / / / C C C C C A- N N N N N N A A A A A H
il
. .C C C C C C C C C C C C C C C C C C C C C C A A A A A A A A A A A P
. A A A A A A A A A A A
/ / / / / / / / / / /
U N N N N N N N N N N N
. A A A A A A A A A A A
/ / / / / / / / / / / N N N N N N N N N N N R
. A A A A A A A A A A A
/ / / / / / / / / / / N N N N N N N N N N N M
M A
R G K O C .A A C C C C C C C C C R I -
/ / C C C C C C C C C P H N N A A A A A A A A A T
T N
E M
E E R T U I A A A A A A C C A A S R / / / / / / C C / A /
A R N N N N N N A A N / N E E N M F T
N E
D Y .
N OL A A A A A A A A A A A E LA / / / / / / / / / / /
P LN N N N N N N N N N N N E AA D
N I
S S
A 3 L 3 3 3 3 3 3 3 3 3 3 C
f c R E
8 #
2 B 2 4 MO M M t
g US - - n
NI 7 7 e
/ 0 0 m P DE 1 1 h LN 6 8 - c EI S1 1 1 2 3 2 S1 1 2 3 4 a WL CW RF W W S
W S
W S
W S
CW W W W W t F RF S S S F t A
, . _ , . . _ , . _ _ . .
. . , _ _ < . , . . . - ., ,.
. ' '
.
~7 ~
, , , .
'
-INDEPENDENT MEASUREMENT PROGRAM [
Pag 3 3 cf 4 SITE: 'Wat; o rd 3 ,
,
I l
-
l WELD NUMBER CLASS l ALLOY FERRITE THICK ' . HARDNESSl VISUAL REMARK 'LlNE/ ISO I ANA WTR-2-4107 I . . .
Limited. exa N/A N/A- N/A N/ N/A ACC N/A N/A - l'.ACC due to weIdf I crown confi-gu ra t io '
<
'61-074 2 N/A N/A N/A N/A N/A- ACC N/A _ l N/A l.ACC '
. l l
- 1 I
'
I .
I Limited exa N/A N/A N/A N/A N/A ACC N/A .N/A ACC due.to wel Crown confi-'
gu ra t io J (~
l 61-128 2 N/A N/A N/A N/A N/A ACC l' N/A- N/A ACC ,
I WTR-2-4211 .
Sweep-0-Le N/A N/A N/A N/A N/A ACC N/A N/A ACC A6180' f rom i datum point-1 rest r ict i ng '
'
100%
cove rag :56-043 2 N/A N/A N/A N/A N/A ACC N/A N/A ACC: i
. <-
1 WIR-2-4205 i 52-017-900 2 N/A N/A -N/A N/A N/A AC N/A N/ ACC i
j 52-018 2 N/A N/A N/A N/A N/A ACC N/A . N/A ACC
.
.. .
Limited exam.
! 52-019-900 N/A N/A N/A N/A N/A ACC N/A N/ ACC- due to poor i g rind ing and
'
valv WTR-2-4211 Limited exam.
!56-040 2 N/A N/A N/A N/A N/A .ACC N/A N/A- .ACC due to
'
reducer to --
valve and weld-1 C rown.
!
Attachaient #1
!
!
-
w
,
'
_ _ .m _ - _ _ . _ . ]
.
S 3 K R
.d k r H-z E t R
.r e l I1 t
a -
W L A
U- C C C C C C C C C C C C C
- S C C C C C C C C C C C C C E I A A A A A A A A A A A A A T
I V
S l'
I
~
S S
E N
D A A A A A A A A A A A A A R / / / / / / / / / / / / /
A N -N N N N N N N N N N N N H
. C C C C C C C C C C C C C C C C C C C C C C C C C C A A A A A A A A A A A A A P
.
T. -
A A A A A A A A A A A A A
/ / / / / / / / / / / / /
U N N N N N N N N N N N N N
. A A A A A A A A A A A A A
/ / / / / / / / / / / / / N N N N N N N N N N N N N R
l
. A A A A A A A A A A A A A
/ / / / / / / / / / / / / N N N N N N N N N N N N N M
I M
A R
G K O C A A A A A A A A A A A A A R I
/ / / / / / / / / / / / /
P H N N N N N N N N N N N N N T
T
E M
E E R T U- I A A A A A A A A C A A A A S R / / / / / / / / C / / / /
A R N - N N N N N N N A N N N N E E M F T
N E
Z Y .
N OL A A A A A A A A A A A A A E LA / / / / / / / / / / / / /
P LN N N N N N N N N N N N N N E AA _
D _
N 1 I _
_
_
S S
A 2 1 1 L 2 2 1 1 1 1 1 1 1 1 C
IlI 4 l f
c R 1 E #
4 B 1 0 2 4 4 5 MO 1 1 0 0 0 0 t 3 US 1 1 1 1 1 1 n 9 NI 4 4 4 4 4 4 e 2 / - 1 1 9 9 6 1 2 9 0 - 1 4 5 7 m P DE 25 20 0 12 6 7 7 14 5 15 15 5 5 h LN - 0 0 0 0 0 0 0 0 0 - 0 0 0 0 c EI R- R- - R- - - - R- - R- R- - - a WL T5 T4 4 T1 1 1 1 I8 8 T8 T1 1 1 t W5 W6 6 W2 2 2 2 W1 1 W1 W2 2 2 t A
,l
,
k
,_
l
~ .
,
.
'3'
d8 r3 a-r0 r5
t',
ao WN s t
- e 3k tc d i
o e r
SD n do i eS P w
et er ro re cN ut o s ct n s eo i
s fo sC S lP T s a to N i hr on E
m e ni st s M t tt ts O u uo ui C N NC Nm n
i o
t c
e p
s 1 1 1 1 1 0 0 0 n 4 4 3 3 3 4 3 3 3 3 3 3 3 3 I
M M M M M M M M M M M M M M O - - - - - - - - - - - - - -
r S 7 7 7 7 7 7 7 7 7 7 7 7 7 7 e I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a /. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 n - - - - - - - - - - - - - -
a G S S S S S S S S S S S S S S
'H W C C C C C C C C C C C C C C D R R R R R R R R R R R R R R I
S I
.
O N
.
K M 1 3 6 9 0 4 7 8 9 0 1 3 4 6 0 0 0 0 1 0 1 1 1 2 2 2 2 2 T 0 0 0 0 0 0 5 5 5 5 5 5 5 5 R 4 4 4 4 4 4 4 4 4 4 4 4 4 4 O - - - - - - - - - - - - - -
P R R R R R R R R R R R R R R P R R R R R R R R R R R R R R U S S S S S S C C C C C C C C S F F F F F F C C C C C C C C gn gn gn gn gn gn no no no no no no a o a a a a a a ii ii ii ii ii ii n n n n n n n n l t lt l t lt lt l t i i i i i i i i oa oa oa oa oa oa d d d d d d d d 2
- oc oc oc oc oc oc o o o o o o o o #
1 Ci Ci Ci Ci Ci Ci C C C C C C C C f f f f f f t f li li li li li li t t t t t t t t n c or or or or or or n n n n n n n n e ou ou ou ou ou ou e e e e e e e e m 1 M PP PP PP PP PP PP n n n n n n n n h s
E op o op op o
p o
p o o c T ld ld ld ld ld ld p p o a g S en en en en en en m m m m m m m m t a
P Y ua ua ua ua ua ua o o o o o o o o t S F F F F F F C C C C C C C C A
_
'
.:.- . i
,
-
.
, ..,
Attachment No. 3: List of Procedures Reviewed
'
.
Title (We'stinghouse Procedures)
Preservice and Inservice Examination Documentation WTR-0PS-101, Revision 0 Qualification of Ultrasonic Manual WTR-ISI-10, Revision 0
" Equipment
. Manual Ultrasonic Examination of Welds WTR-ISI-206, Revision 0 Manual Ultrasonic Examination of Welds WTR-ISI-47, Revision 0 in Vessels Manual Ultrasonic Examination of Vessel WTR-ISI-247, Revision'0 Nozzle Inside Radius (Training) Qualification and WTR-QA-2.2, Revision 1 Certification of NDE Personnel Visual Examination WTR-ISI-8, Revision 0 Magnetic Particle Examination WTR-ISI-70, Revision 0 Liquid Penetrant Examination WTR-ISI-11, Revision 0 Qualification and Certification of Combustion Engineering Procedures Visual Examination Personnel for PSI QA.2.4, Revision 0 Certification of NDE Personnel NQA 1 (Louisiana Power and Light Company Procedures)
Section IV Repairs and Replacement PE-1-001 Modification MP-107, Revision 0, 1, 2 Control of Inservice Inspection PE-1-003 l Modification SM-107, Revision 0, 1, 2 l
Penetrant Examination PT QI-009-011, Revision 3 Administration Control of ISI PE-003, Revision 2-(Louisiana Power and Light Company Procedures)
Administration Plant Engineering PE-2-006, Revision 8 Station Modification
'
(EBASCO Procedures)
!*
I
!
-- . - . . -. _ -.- -.
- -
n
-
-
. j'( -
- , .
- . ;
-
.-
,.
h ,'
" % ': 2-Structural Steel LOU 1564.723 Specification Station Piping, Hanger ' LOU 1564.100 and Supports Welding :M 1-050, Revision 3 -
PC-I General Power Piping hCR-MP-2050
'
(GE0 Proce'dures)
- Penetrant Examination PT-23, A. 58, Revision 23
.
m_ _ _ _ _ . - _ _ _ _ _ - - - - - _ - - - - - -_ - - - -