Text
_ _ _ _ _ _ _ _ _
i e.
-
.
.
.
.,,
,
'
ATTACHMENT
-
6a
!
s deluge system design with the thought of redirecting the nozzles to l
solve the problem.
The inspectors will monitor the licensee's
!
corrective actions in this area.
!
'
t
'
No violations or deviations were identified.
f 4.
-Monthly Maintenance Observation (62703)
The station maintenance activities affecting safety-related systems and components listed below were observed and documentation reviewed to ascertain that the activities were conducted in accordance with approved work authorizations (WAs), procedures, TS, and appropriate industry codes or standards.
.a.
WA 01045315. On May 9, 1990, the inspector observed work in progress on Charging Pump A.
The pump had been taken out of service to work
-
several outstanding WAs. The work in progress was the reassembly of j
the speed changer gear housing after replacement of oil seals to correct a reported oil leak.
The inspector reviewed the work package s
to determine that it was adequate for the work being done. The work l
was properly authorized and completed steps were
,
,
!
,
l
<
1 '
'
,
I i
9007030033 900626 PDR ADOCK 05000392 O
FDC n
.
-
-
..