ML20197E427

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/86-06 on 860301-31.No Violations or Deviations Noted.One Unresolved Item Discussed in Paragraph 9
ML20197E427
Person / Time
Site: Waterford 
Issue date: 05/08/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Muench G
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20197E432 List:
References
NUDOCS 8605150254
Download: ML20197E427 (2)


See also: IR 05000382/1986006

Text

_

o

.

MAY 0 81986

In Reply Refer To:

Docket: 50-382/86-06

Louisiana Power & Light Company

ATTN:

G. W. Muench, Acting Director

i

Nuclear Operations

317 Baronne Street

P. O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. J. G. Luehman and H. F. Bundy

-

of this office during the period March 1-31, 1986, of activities authorized by

NRC Operating License NPF-38 for Waterford Steam Electric Station, Unit 3, and

to the discussions of our findings with Mr. R. P. Barkhurst and other members

of your staff at the conclusion of the inspection.

!

Areas examined during the inspection included followup on potential generic

1

problems, plant status, Licensee Event Report (LER) followup, followup on

1

previously identified items, monthly maintenance, monthly surveillance, ESF

system walkdown, routine inspection, and Inspection & Enforcement (I&E) Circulars.

Within these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspector. These findings are documented in the enclosed inspection report.

i

Within the scope of the inspection, no violations or deviations were identified.

One unresolved item is discussed in paragraph 9.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 6 of the enclosed report.

l

Should you have any questions concerning this inspection, we will be pleased to

i

discuss them with you.

j

Sincerely,

Original Signed By

)

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-382/86-06

cc:

(see next page)

hP

j

R V:

I

RP /

RPB

ehman

HFBundy

G

table

JEGagli

do

h/ o/86

h4

i

S

/ 9 /86

(

1 /86

//) /

i

'

g

8605150254 860508

I

DR

ADOCK 05000382

PM

,

!

-.

.

. _ .

.

.

.

Louisiana Power & Light Company

-2-

cc w/ enclosure:

Louisiana Power & Light Company

ATTH:

G. E. Wuller, Onsite

Licensing Coordinator

P. O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN:

R. P. Barkhurst, Plant Manager P. O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P. O. Box 6100

!

New Orleans, Louisiana 70161

Louisiana Power & Light Company

ATTN:

K. W. Cook, Nuclear Support

and Licensing Manager

317 Baronne Street

P. O. Box 60340

New Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

m

bec to DMB (IE01)

bcc distrib. by RIV

  • RPB

RSB

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/C)

DRSP

  • EP&RPB
  • RIV File
  • MIS System

D. Crutchfield, NRR

  • RSTS Oparator
  • 766

i

I

.

-

- -

- -

.

- -

-

- - - - -

.