IR 05000382/1986011
| ML20203D674 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/16/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Muench G LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20203D678 | List: |
| References | |
| NUDOCS 8607210265 | |
| Download: ML20203D674 (2) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
.
.
JUL 161996 In Reply Refer To:
Docket:
50-382/86-11 Louisiana Power & Light Company ATTN:
G. W. Muench, Director Nuclear Operations 317 Baronne Street P. O. Box 60340 New Orleans, Louisiana 70160 Gentlemen:
This refers to the inspection conducted by Messrs. J. G. Luehman, H. F. Bundy, B. A. Breslau, and T. R. Staker of this of fice during the period May 1-31, 1966, of activities authorized by NRC Operating License NPF-38 for Waterford Steam Electric Station, Unit 3, and to the discussion of our findings with Mr. R. P. Barkhurst and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status; Licensee Event Report followup; monthly surveillance; routine inspection; license conditions; licensee's response to selected safety issues; licensee followup on previously identified items; report of facility changes, tests, and experiments; monthly maintenance; surveillance testing and calibration control program; and ESF system walkdown. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
These findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
One unresolved item is identified in paragraph 5 of the enclosed inspection report.
Action on previously identified Unresolved Item 8606-01 is discussed in paragraph 13.
We have also examined actions you have taken with regard to previously identified inspection findings.
The status of these items is identified in paragraph 9 of the enclosed report.
RIV:RPB/0 C:
C:RPB BABreslau GLConstable JEGagl ro
'
q / /86 1/1} /86 g///f j
\\
g0
gngs S$hk Ni a
j
_
_
_
_
,
,
.
Louisiana Power & Light Company-2-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
.
Sincerely,
'
Crigi.,ai signed ay J. E. Gagilardo J. E. Gagliardo, Chief Reactor Projects Branch Enclosure:
Appendix - NRC Inspection Report 50-382/86-11 cc w/ enclosures:
Louisiana Power & Light Company Licensing Coordinator ATTN:
R. P. Barkhur:t, Plant Manager P. O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company ATTN:
G. E. Wuller, Onsite P. O. Box B Killona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally P. O. Bcx 6100 New Orleans, Louisiana 70161 Louisiana Power & Light Company ATTN:
K. W. Cook, Nuclear Support and Licensing Manager 317 Baronne Street P. O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE01)
bec distrib. by RIV
- RPB RSB i
- Resident Inspector R. D. Martin, RA i
- Section Chief (RPB/C)
ORSP
- EP& PPB
- RIV File
'
- MIS System
- RSTS Operator D. Crutchfield, NRR
- H.
Bundy
- w/766
.
.
-
.