Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/86-05.Ref to NRC Corrected to NRC
ML20214L227
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/02/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Muench G
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8609090557
Download: ML20214L227 (2)


Text

. *

SEP 21996 In Reply Refer To:

Docket: 50-382/86-05 Louisiana Power & Light Ccmpany ATTN: G. W. Muench, Director Nuclear Operations 317 Baronne Street P. O. Box 60340 New Orleans, Louisiana 70160 Gentlemen:

Thank you for your letter dated August 15, 1986, in response to our letters dated April 2,1986, and July 16, 1986. We believe your reference to our letter of July 7,1986, was actually intended to be to our letter of July 16, 1986, discussed above. We have no further questions at this time and will review your corrective action during a future inspection.

Sincerely, Driginal S:gned Dj

'U. E. Gast! rdo l

- J. E. Gagliardo, Chief Reactor Projects Branch cc: (see next page)

.

.

RPB/CFM C: P 't C:RPB HBundy:cs LCdffstable JGagl rdo g 9/J./86 9/t/86 9/ X'

8609090557 DR 860902

ADOCK 05000382 PDR

. _ ._

,

  • s

. :>

Louisiana Power & Light Company -2-cc:

Louisiana Power & Light Company

. ATTN: G. E. Wuller, Onsite Licensing Coordinator P. O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company ATTN: R. P. Barkhurst, Plant Manager P. O. Box B Killona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally P. O. Box 61000 New Orleans, Louisiana 70161 Louisiana Power & Light Company ATTN: K. W. Cook, Nuclear Support and Licensing Manager 317 Baronne Street P. O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE01)

bec distrib. by RIV:

,

'

RPB D. Weiss,LFMB(AR-2015)

Resident Inspector R. D. Martin, RA Section Chief (RPB/C) DRSP i R&SPB RSB

'

MIS SYSTEM RSTS Operator H. Bundy l

l l

'

.

v &

-

. - - . - .__ . __ __

<

. - b 1 ygg:ggm

'

AUG l g1986

.

LOUISI AN A / 317 P O W E F1 & L I G H T BARONNESTREET NEW

  • P. O. BOX 60340 ORLEANS, LOUISlANA 70160 + (504)595-3100 U1$0$51sN!U August 15, 1986 W3P86-1945 A4.05 QA Mr. Robert Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Subject: Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 86-05 Reference: LP&L response to Violation 8605-01 in letter W3P86-0072, dated 5/2/86, K.W. Cook to R.D. Martin, NRC Region IV.

Dear Mr. Martin:

Attached is the Louisiana Power & Light Company (LP&L) supplemental response to Violation No. 8605-01 which was requested by NRC letter dated July 7, 1986, J.E. Cagliardo to G.W. Muench.

If you have any questions on the response, please contact G.E. Wuller, Onsite Licensing, at (504) 464-3499.

Very truly yours, r i K.W. Cook Nuclear Support & Licensing Manager KWC:KLB:ssf

, Attachment l cc: NRC, Director, Office of I&E G.W. Knighton, NRC-NRR ,

J.H. Wilson, NRC-NRR -

NRC Resident Inspectors Office {

..

B.U. Churchill k 9.

W.M. Stevenson '

"AN EQUAL OPPORTUNITY EMPLOYER" I

187 66

c

.

.

Sheet 1 of 1 LP&L SUPPLEMENTAL RESPONSE TO VIOLATION NO. 8605-01 NRC Request for Additional Information In response to the LP&L response to Violation No. 8605-01, the NRC requested that additional information be provided, "Specifically, you should address corrective actions associated with performance of the work without an adequate RWP and test procedure as required by the NOV."

LP&L Supplemental Response (1) Corrective Action That Will Be Taken Regarding the lack of an adequate RWP, LP&L will issue two letters.

The first letter will be issued to all plant personnel and they will be directed to ensure that they keep Operations personnel cognizant of work in progress and that Health Physics personnel are made aware of changes to the scope of work covered under a specific Radiation Work Permit particularly if such change increases the potential for changing the radiological conditions in the work area.

The second letter will be issued to appropriate Health Physics personnel to remind them of the importance of ensuring that they are knowledgeable of the total scope of a job to be performed inside the RCA and that they evaluate potential adverse consequences of such work particularly with regard to the need for additional radiological monitoring of the work area.

A test procedure for Station Modification SM-818 has been develcped which includes checks for leakage and crossed lines as well as provides for an integrated functional test of the system. This test procedure is expected to be reviewed and approved by PORC before August 22, 1986.

(2) Date When Full Compliance Will Be Achieved The two letters will be issued by September 15, 1986 and this will achieve full compliance.

.