Discusses Insp 50-382/86-02 on 860101-31 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.LER 382/85-22 Did Not Precisely Describe Plant Conditions
ML20155G079
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/16/1986
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Muench G
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20155G085 List:
References
EA-86-050, EA-86-50, NUDOCS 8604300121
Download: ML20155G079 (4)


Text

. _ _ . . _ -. _ . - - _ _--_ .

,

e

  • c 4

_ ..

_

~NA6W ,

~

-Docket No.: 50-382 License No.: NPF-38 ,

EA 86-50

,

Louisiana Power & Light. Company ATTN:' G. W. Muench, Director Nuclear Operations

'142 Delaronde Street-New Orleans, Louisiana 70174 _

,

Gentlemen:

Subject: NOTICE OF VIOLATION AND PROPOSED . IMPOSITION OF CIVIL PENALTY (NRC INSPECTION REPORT 50-382/86-02)

This refers to the inspection conducted January. 1-31, 1986;of-activities-

~

authorized by Operating License NPF-38 for the Waterford Steam Electric Station, ,

Unit 3 by the Senior Resident Inspector and other. members of :the Region 137 staf As.a-result of~this. inspection, violations of NRC requirements were identifie e inspection findings were documented in Inspection Report 50-382/86-02 which ~ ,

was.acnt'to you on February 27, 1986. The. violation considered for escalated-enforcement was discussed with you at an enforcement conference held on March 5, 1986 in the Region IV offic Violation I in the enclosed Notice of Violation and Proposed Imposition of Civil Penalty occurred then you changed operational modes on December. 16,.1985 with an inoperable train of the containment spray system. Changing operational modes-while in reliance on an action statement of a limiting condition for operation

~

is a violation of Technical Specification 3.0.4. The root causes-of this event j were the failure to adequately control the condition and-the status of remot valve operators and the failure to follow the-appropriate annunciator procedure Whilewerecognizethatyourstafforiginal$yidentifiedand;reportedthis-  ;

violation,.the1(RC considers this event significant. :The discharge header valve (CS-111B) for Train B of the Containment' Spray-system remained closed due to.a disconnected reach rod. Our review indicated that some operations- -

personnel knew that reach rods in this area were disconnected, yetcno corrective actions were taken. Operations personnel also recognized:an alarming annunciator on the N annunciator panel indicated that one of twoJvalves1(CS-1115.or'CS-1175) -

was closed, yet timely and appropriate response'to the annunciator, indication was not made.- In addition, your. subsequent review of this event was deficient

^

,

in that1the-Licensee Event Report 382/85-55 that you submitted'did not precisely

' describe when'and how this. abnormal plant condition was. recognize ~

t

~ ' '

CERTIFIED NMIL , RETURN RECEIPT REQUESTED-

~

.

, F7  :

! B604300121 860416'

PDR ADOCK 05000382 .
r

G PDR g3 l

!

_

4 ,

. -

l, ,

,

.

.

.- ,

- l

"

-

-. ._ , ~ - - . . .

-

. . . , - . . :w . -, ,J

- . ..

. ,

o Louisiana Power & Light Company -2-To emphasize the need for you to vigorously pursue root causes of indicated abnormal plant conditions so that prompt and effective corrective actions can .

be taken, I have been authorized, after consultation with the Director, Office of Inspection and Enforcement, to issue the enclosed Notice of Violation and-Proposed Imposition of Civil Penalty ~in the amount of Fifty Thousand Dollars ($50,000) for the violation described in the enclosed Notice. In accordance with the " General. Statement of Policy and Procedure for NRC Enforcement Actions,"-

10 CFR Part 2, Appendix C'(1985), the violation described in the enclosed Notice has been categorized as a Severity Level III. violation. The base civil penalty for a Severity Level III violation'is $50,000. Although the escalation and mitigation factors in'the Enforce' ment Policy were considered, no adjustment in the civil penalty amount was deemed appropriate. Violation II_ involves inadequacies in certain maintenance procedures, and since it was of lesser; significance, is categorized as a Severity Level IV violatio You are required to respond to this letter and should. follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document.the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this. Notice, i including your proposed corrective actions, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirement In accordance with Section 2.790 of the NRC's " Rules of Practice," Part.2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo The responses directed by this letter and the enclosed Notice are not subjec to the clearance procedures of the.0ffice of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-31

Sincerely, Briginsi s1.gne31D Robert D. Mactbr

.

l Robert D. Martin Regional Administrator Enclosure:

Notice of Violation and Proposed Imposition of Civil Penalty

-

C See next page

,

- a

__

.. . . . -

%

...

e 3

>

Louisiana ~ Power'& LigNt Company -- - 3 ' -

cc w/ encl:

Louisiana Power & Light Company ATTN: .G.'E. Wuller, Onaite2 Licensing Coot inator P. O.' Box B Killona, Louisiana 70066 Louisiana Power & Light Company ATTN: R. P. Barkhurst, Plant Manager P. O. Box B,

-Killona, Louisiana 70066 Middle South Services ATTN: Mr. R..T. Lall P.~0. Box 61000 New Orleans, Louisiana-- 70161 Louisiana Power & Light Company ATTN: K. W. Cook, Nuclear Support and Licensing Manager .

142 Delaronde Street New Orleans, Louisiana 70174 Louisiana Radiation Control Program Director

'

,

a J-

L

+

4 N t

k t' h' ,

e-

'

< - , , . - -

__

,