ML20151P365

From kanterella
Revision as of 01:51, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-22 & 50-368/88-22 on 880711-15 & Notice of Violation
ML20151P365
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML17222A807 List:
References
NUDOCS 8808100005
Download: ML20151P365 (2)


See also: IR 05000313/1988022

Text

{{#Wiki_filter:'d.

       -
  .
          .
.
    In Reply Refer To:                       g'gg     4 jgc8
    Dockets:   50-313/88-22
               50-368/88-22
    Arkansas Power & Light Company
    ATTN: Mr. Gene Campbell
            Vice President, Nuclear
              Operations
    P.O. Box 551
    Little Rock, Arkansas 72203
    Gentlemen:
    This refers to the inspection conducted by Messrs. H. F. Bundy, R. V. Azua and
    M. E. Murphy of this office during the period July 11-15, 1988, of activities
    authorized by NRC Operating Licenses DDR-51 and NPF-6 for the Arkansas Nuclear
    One facility, and to the discussion of our findings with Mr. J. M. Levine, and
    other members of you,' staff at the conclusion of the inspection.
    Areas examine; luring the inspection included startup testing and surveillance
    testing procedures and records. Within these areas, the inspection consisted
    of selective examination of procedures and representative records, interviews
    with personnel, and observations by the NRC inspectors. Tha inspection
    findings are documented in tho enclosed inspection report.
    During this inspection, it was found that certain of your activities were in
    violation of NRC requirements. Consequently, you are required to respond to
    these violations, in writing, in accordance with the provisions of
    Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
    Federal Regulations. (our response should be based or the specifics contained
    in the Notice of Violation enclosed with this letter.
    The response directed by this letter and the accompanying Notice is not subject
    to the clearance procedures of the Office of Management and Budget as required
    by the Papemork Reduction Act of 1980, PL 96-511.
    Should you have any questions concerning this inspection, we will be pleased to
    discuss them with you.
                                              Sincerely,
                                             0.+ i mi St y ed 11y
                                                 i n. Un.ch
                                           [L. J. Callan, Director
                                            (DivisionofReactorProjects
     Enclosures:   (see next page)
    *RIV:RI          *RI            *C:TPS           *D:DRS         D:DRP
    HFBundy:gb       MEMu rphy      WCSeidle         JLMilhoan      LJCallan
       / /88           / /88          / /88            / /88        8 /9 /88
     *previously concurred                                                            '\
         8808100005 880804
         {DR ADOCK0500g3                                                           {{g
                             .                        _
 3     '
             _
                                                                          i
                                                                          1
     .   .
               ,
   .
                                                                           .
         Arkansas Power & Light Company                 2
                                                                          l
         Enclosures:
         1.      Appendix A - Notice of Violation                         i
         2.      Appendix B - NRC Inspection Repcrt                       i
                   50-313/88-22                                           1
                   50-368/88-22
         cc w/ enclosures:
         Arkansas Nuclear One
         ATTN:      J. M. Levine, Director
                       Site Nuclear Operations
         P.O. Box 608
         Russellville, Arkansas 72801
         Arkansas Radiation Control Program Director
         bec to DMB (IE01) -
         bcc distrib. by RIV:
         *RRI                                    R. D. Martin, RA
         *RPB-DRSS                             *Section Chief (DRP/A)
           Lisa Shea, RM/ALF                   *RIV File
         *DRP                                  * MIS System
         *RSTS Operator                        *ProjectEngineer,DRP/A
         *G. Dick,     NRR Project Manager     *DRS
         *TSS                                   G. F. Sanborn, E0        .
         *H. F. Bundy                          *R. V. Azua
         *W.     C. Seidle                     *M. E. Murphy
         *w/766

, 1

                                                                         i
                                                                      _.

}}