Forwards Insp Repts 50-313/88-22 & 50-368/88-22 on 880711-15 & Notice of Violation
ML20151P365
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML17222A807 List:
References
NUDOCS 8808100005
Download: ML20151P365 (2)


See also: IR 05000313/1988022

Text

{{#Wiki_filter:'d. - . . . In Reply Refer To: g'gg 4 jgc8 Dockets: 50-313/88-22 50-368/88-22 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen: This refers to the inspection conducted by Messrs. H. F. Bundy, R. V. Azua and M. E. Murphy of this office during the period July 11-15, 1988, of activities authorized by NRC Operating Licenses DDR-51 and NPF-6 for the Arkansas Nuclear One facility, and to the discussion of our findings with Mr. J. M. Levine, and other members of you,' staff at the conclusion of the inspection. Areas examine; luring the inspection included startup testing and surveillance testing procedures and records. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the NRC inspectors. Tha inspection findings are documented in tho enclosed inspection report. During this inspection, it was found that certain of your activities were in violation of NRC requirements. Consequently, you are required to respond to these violations, in writing, in accordance with the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations. (our response should be based or the specifics contained in the Notice of Violation enclosed with this letter. The response directed by this letter and the accompanying Notice is not subject to the clearance procedures of the Office of Management and Budget as required by the Papemork Reduction Act of 1980, PL 96-511. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, 0.+ i mi St y ed 11y i n. Un.ch [L. J. Callan, Director (DivisionofReactorProjects Enclosures: (see next page)

  • RIV:RI
  • RI
  • C:TPS
  • D:DRS

D:DRP HFBundy:gb MEMu rphy WCSeidle JLMilhoan LJCallan / /88 / /88 / /88 / /88 8 /9 /88 '\\

  • previously concurred

8808100005 880804 {DR ADOCK0500g3 {{g

3 _ . _ ' i 1 . . , . . Arkansas Power & Light Company 2 Enclosures: 1. Appendix A - Notice of Violation i 2. Appendix B - NRC Inspection Repcrt i 50-313/88-22 1 50-368/88-22 cc w/ enclosures: Arkansas Nuclear One ATTN: J. M. Levine, Director Site Nuclear Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec to DMB (IE01) - bcc distrib. by RIV:

  • RRI

R. D. Martin, RA

  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • ProjectEngineer,DRP/A
  • G. Dick, NRR Project Manager
  • DRS
  • TSS

G. F. Sanborn, E0 .

  • H. F. Bundy
  • R. V. Azua
  • W. C. Seidle
  • M. E. Murphy
  • w/766

, 1 i _. }}