ML20153E362

From kanterella
Revision as of 02:21, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/88-18 on 880808-12 & Notice of Violation
ML20153E362
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/01/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20153E368 List:
References
NUDOCS 8809060304
Download: ML20153E362 (2)


See also: IR 05000458/1988018

Text

________________- _ - - _ _ _ _ _ _ _ _ _ _ _ .

b

. .

'

, .

,

, .- '

In Reply Refer To:

Docket: SEP - l 1988

50-458/88-18

J

^

Gulf States Utilities

ATTN: Mr. James C. Deddens l

,

Senior Vice President (RBNG) ,

P.O. Box 220 i

St. Francisville, Louisiana 70775 j

Gentlemen: -

This refers to the inspection conducted by Messrs. H. F. Bundy and R. V. Azua

of this office during the period August 8-12, 1988, of activities authorized by .

l NRC Operating License NPF-47 for the River Bend Station, and to the discussion

I of our findings with Mr. T. F. Plunkett and other members of your staff at the

i

conclusion of the inspection, t

.

I Areas examined during the inspection included surveillance proc 3dures and ['

!

records. Within these areas, the inspection consisted of selective examination

of procedures end representative records, interviews with personnel, and

. observations by the NRC inspectors. The inspection findings are documented in i

1 the enclosed inspection report. '

r

) During this inspection, it was found that certain of your activities were in >

violation of NRC requirements. Consequently, you are required to respond to i

this violation, in writing, in accordance with the provisions of Section 2.201 ,

of the NRC's "Rules of Practice," Part 2. Title 10 Code of Federal '

' Regulations. Your response should be based on the specifics contained in the

j Notice of Violation enclosed with this letter. i

,

'

The response directed by this letter and the accompanying Notice is not subject

) to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511. L

i

Should you have any questions concerning this inspection, we will be pleased to i

!

discuss them with you. f

I

1 Sincerely, r

1  :

J 6!N mnnu ny

1 i: n, a

i

! L. J. Callan, Director

Division of Reactor Projects

Enclosures: (seenextpage)

l )

IV:TPS/Rhd

g/ HFBundy/tw

Ri h

RVAzua

C:TPS

WCSeid

i D:DRS

JLMilho n

-

D \

LJ s' an

,

8/y/88 f Aq/88 O 'l/88 f/p/88 8/31/88  ;

1 ,

!

) ,

i

1 8809060304 880901 g

!

?

I

PDR ADOCK 05000453

PDC

( i

Q

I

,

.' M l l

.

- '

. .

.

, .

Gulf States Utilities -2-

Enclosures:

1. Appendix A - Notice of Viniation

2. Appendix B - NRC Inspection Report

50-458/88-18 w/attachaent

,

t

'

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Rive- Bend Oversight

,

P.O. Box 2951

! Beaumont, Texas 77704

'

Gulf States Utilities

ATTH: Les England, Director

4

Nuclear Licensing - RBNG

P.O. Box 220

St. Frar.cisville, Louisiana 70775 '

Louisiana State University,

Government Documents Department

l

Louisiana Radiation Control Program Director

5

bec to DMB (IE01) ,

bec distrib. by RIV:

  • DRP *RRI

j *R. O. Martin, RA *Section Chief (DRP/C) 1

Lisa Shea, RM/ALF * MIS System

"RPB-DRSS *RSTS Operator '

i

  • Project Engineer, DRP/C *RIV File '
  • W. Paulson, NRR Project Manager *DRS

i

  • H. Bundy *R. V. Azua -

,

  • W. C. Seidle
  • w/766

'

l

!

1  !

'

1

i

! I

i

,

!

l

1 ,

.