ML20153E362
| ML20153E362 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/01/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20153E368 | List: |
| References | |
| NUDOCS 8809060304 | |
| Download: ML20153E362 (2) | |
See also: IR 05000458/1988018
Text
________________- _ - - _
_ _ _ _ _ _ _ _ _ _ .
b
.
.
'
.
,
,
'
.-
,
In Reply Refer To:
SEP - l 1988
Docket:
50-458/88-18
J
^
Gulf States Utilities
ATTN: Mr. James C. Deddens
l
Senior Vice President (RBNG)
,
,
P.O. Box 220
i
St. Francisville, Louisiana 70775
j
Gentlemen:
-
This refers to the inspection conducted by Messrs. H. F. Bundy and R. V. Azua
of this office during the period August 8-12, 1988, of activities authorized by
.
l
NRC Operating License NPF-47 for the River Bend Station, and to the discussion
I
of our findings with Mr. T. F. Plunkett and other members of your staff at the
conclusion of the inspection,
t
i
.
I
Areas examined during the inspection included surveillance proc 3dures and
['
!
records. Within these areas, the inspection consisted of selective examination
of procedures end representative records, interviews with personnel, and
.
observations by the NRC inspectors.
The inspection findings are documented in
i
'
1
the enclosed inspection report.
r
- )
During this inspection, it was found that certain of your activities were in
>
violation of NRC requirements. Consequently, you are required to respond to
i
this violation, in writing, in accordance with the provisions of Section 2.201
,
of the NRC's "Rules of Practice," Part 2. Title 10 Code of Federal
'
Regulations. Your response should be based on the specifics contained in the
'
j
Notice of Violation enclosed with this letter.
i
,
'
The response directed by this letter and the accompanying Notice is not subject
)
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
L
i
Should you have any questions concerning this inspection, we will be pleased to
i
!
f
discuss them with you.
I
1
Sincerely,
r
1
J
6!N mnnu ny
1 i: n, a
!
L. J. Callan, Director
i
Division of Reactor Projects
l
Enclosures:
(seenextpage)
)
IV:TPS/Rhd
Ri h
C:TPS
i
D:DRS
-
LJ s'
\\
D
g/ HFBundy/tw
RVAzua
WCSeid
JLMilho n
an
8/y/88
f Aq/88
O 'l/88
f/p/88
8/31/88
,
1
,
)
!
i
,
!
1
8809060304 880901
g
?
ADOCK 05000453
(
i
I
Q
I
.' M l
l
,
-
- -
-
--
- -
-
--
.
-
'
.
.
.
.
,
Gulf States Utilities
-2-
Enclosures:
1.
Appendix A - Notice of Viniation
2.
Appendix B - NRC Inspection Report
50-458/88-18 w/attachaent
,
t
cc w/ enclosures:
'
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Rive- Bend Oversight
P.O. Box 2951
,
!
Beaumont, Texas 77704
Gulf States Utilities
'
ATTH:
Les England, Director
Nuclear Licensing - RBNG
4
P.O. Box 220
St. Frar.cisville, Louisiana 70775
'
Louisiana State University,
Government Documents Department
l
Louisiana Radiation Control Program Director
5
bec to DMB (IE01)
,
bec distrib. by RIV:
- DRP
- RRI
j
- R. O. Martin, RA
- Section Chief (DRP/C)
1
Lisa Shea, RM/ALF
- MIS System
"RPB-DRSS
- RSTS Operator
'
- Project Engineer, DRP/C
- RIV File
i
'
- W. Paulson, NRR Project Manager *DRS
i
- H.
Bundy
- R. V. Azua
-
- W. C. Seidle
,
- w/766
'
l
!
1
!
1
'
i
!
I
i
,
!
l
1
,
.
. -
.
. . . .