ML20153E374

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 880812.Violation Noted: Test Data for STP-051-4210,completed on 871013 Incomplete in That Page 24 of 60 Page Procedure Contained No Test Data
ML20153E374
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/01/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20153E368 List:
References
50-458-88-18, NUDOCS 8809060307
Download: ML20153E374 (2)


Text

.-

APPENDIX A NOTICE OF VIOLATION Gulf States Utilities Docket: 50-458 RiverBendStation(RBS) Operating License: NPF-47 4

1 During an NRC inspection conducted during the period Augurt 8-12, 1988, a violation of NRC requirements was identified. The violation involved failure to properly evaluate and document surveillance test results. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Activis," 10 CFR Part 2. Appendix C (1988), the violation is listed below:

1 Fa * 'a to Properly Evaluate and Document Surveillance Test Results Title 10 Part 50, Appendix B, Criterion XI, "Test Control," of the Code of Federal Reguletions states, in part, ". . . Test results shall be

, documented and evaluated to assure that test requirements have been i satisfied." Criterion XI is implemented by RBS Quality Assurance Directive (QAD)-11, Revision 5. "Test Control." This Directive also requires that recorded data reveal the adequacy of the equipment or systems to mtset the specified requirement in the acceptance criteria.

Further implementation of those documents is provided by RBS administrative procedures (ADMs) as discussed below. Section 8.3.1 of i ADM-0015 specifically disallows use of test exceptions when acceptance criteria cannot be met. Section 8.6 of ADM-0015 requires that all data, calculations, notes, etc., which are essential in proving the acceptability

' of a surveillance test procedure (STP), shall be recorded on the data line j provided or attached to the procedure.

1 i Contrary to the above, the following failures were identified:

A. Test data for STP-051-4210, completed on October 13, 1987, was j incomplete in that page 24 of the 60-page procedure contained no test data. This precluded ascertaining that the data had been properly i

documented and evaluated as required by 10 CFR 50, Appendix B.

1 Criterion XI, a

i B. Test exceptions were written for performance of Sections 7.3.4 and

7.5.4 of STP-403-0601, "Standby Gas Treatment System Annulus Mixing j System Functional Tests." Writing test exceptions on an acceptance criterion that cannot be met constituted a violation of Section 8.3.1 1 of ADM-0015. Also, the adequacy of the system to meet the specified requirements in the acceptance criteria was not revealed by the d

recorded data as required by QAD-11.

t C. The data and calculation for the average stroke rate of Valve 1833-HYVF0 GOB timed in Step 7.4.12 of STP-053-0601, "Rectre

! Flow Control Valve Operability Test," were not included in the data I package completed on October 24, 1987, as required by Section 8.6 of ADM-0015.

8809060307 eso901 PDR ADOCK 05000458

. O PDC

_ -m _

. 2 i

2 This is a Severity Level IV violation. (St'pplement I)(458/8818-01)

Pursuant to the provisions of 10 CFR 2.201, Gulf States Utilities is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this /2t day of Se $ c k 1988,