ML20154Q055

From kanterella
Revision as of 11:13, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Restart Readiness Assessment Rept for Facility for Public Review.W/O Encl
ML20154Q055
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Karbott G
PLYMOUTH, MA
References
NUDOCS 8810030288
Download: ML20154Q055 (1)


Text

- _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ -

[,

W e.

SEP 27 ggg Plymouth Public Library ATTN: Ms. Grace Karbott 11 North Street Plymouth, Massachusetts 02360

Dear Ms. Karbott:

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Power Station (PNPS).

Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely.

08l0lNAL SIGNED By Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encis:

Public Document Room (POR)

Local Public Document Room (LPOR) bec w/o enc 15:

L. T. Doerflein, DRP M. J. DiDonato, ORP M. T. Miller, SLO i

2 RI:0RP RI:0RP :jR L0oerflein/mjd JWiggins CM11 s 9/A /88 9/de/88 941/88 0FFICIAL RFCORD COPY LIBRARY PLYMOUTH - 0001.0.0 09/26/88 i $

i ,

go 003028sePgg a=ce C -

PDC,