ML20155J974
| ML20155J974 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/26/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Thompson A PLYMOUTH, MA |
| Shared Package | |
| ML20155J978 | List: |
| References | |
| NUDOCS 8811010027 | |
| Download: ML20155J974 (2) | |
Text
,
.~
00T 261988 Office of the Selectmen ATTN: Ms. Alba C. Thompson Chairm4n Il Lincoln Street Plymouth, Massachusetts 02360
Dear Ms. Thompson:
This acknowledges your letter of September 27, 1988, in which you discussed the Board of Selectmen's concerns regarding the proposed restart of the Ptigrim a
1.
Nuclear Power Station.
Because the thrust of your concerns deals with the ongoing status of the emerg-ency preparedness program in the Pilgrim Emergency Planning Zone, I have for-warded your letter to Dr. Thomas Murley, Director of the NRC's Office of Nuclear Reactor Regulation, so that he may have the benefit of your views.
Thank you for your continued interest in this matter.
Sincerely, D IOP dl.' $f M E i
Samuel J. Collins, Deputy Director Division of Reactor Projects cc:
Senator E. Kennedy Senator J. Kerry Representative G. Studds Senator E. Kirby Representative P. Forman Secretary Barry, Massachusetts Department of Pubite Safety FEMA - Region I Plymouth Civil Defense Director cc w/ copy of 9/27/88 letter:
Dr. Thomas Murley, NRC:NRR i
\\
OFFICIAL RECORD COPY WIGGINS 362 10/24/C - 0001.0.0
)\\\\
10/24/88
[M$/
8811010027 esto26 ADOCK0500g3
/
r Alba C. Thompson 2
00T 2 61988 bec w/ copy of 9/27/88 Letter:
J. Wiggins, DRP R. Blough, ORP L. Doerflein, ORP R. Bellamy, DRSS R. Wessman, NRR F. Congel, NRR Mb RI:DRP RI:DRP DRP JWiggins/mjd RBellamy 11tns 10/Z'h88 104.[/88 10Ap/P' 0FFICIAL RECORD COPY WIGGINS 362 10/24/8h 302.0.0 10/24/88