ML20195H332
| ML20195H332 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/16/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mazzilli F CARVER, MA |
| References | |
| NUDOCS 8811300347 | |
| Download: ML20195H332 (2) | |
Text
..
NOV 161988 Board of Selectmen ATTN: Mr. Frank R. Mazzilli Chai rman Town Hall Main Street Carver, Massachusetts 02330
Dear Mr. Mazzilli:
This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power l
Station (PNPS), and of the public meeting held by NkC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.
This material is provided for your infornation.
Copies of this material have l
also been sent to the Public Libraries within the Emergency Planning Zone l
(EPZ), which had previously received copies of the PNPS Restart Plan and Self-Assessment Report, for public review.
l l
Your continuing cooperation and interest in this matter is appreciated.
Sincerely.
ORIGm1 SIGifED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encls:
Public Document Room (PDR)
Local Public Document Room (LPDR) bec w/o encis:
L. T. Doerflein, DRP M. J. DiDonato DRP M. T. Miller, SLO OFFICIAL RECORD COPY SELECTMEN CARVER - 0001.0.0 11/16/88 p2Ta:I "dapaa i o
.u.
8r. Fr:nx R. sazziiii 2
g C/
dd (
RI:0RP RI:URP RI:DRP L0oerflein/mjd gRBlough
.S^JWiggins ins 11/lb /88 11/to/88 11/}b/88 11/\\b/88 0FFICIAL RECORD COPY SELECTMEN CARVER - 0001.1.0 11/16/88