ML20154Q312
| ML20154Q312 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/27/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corcoran D MARSHFIELD, MA |
| References | |
| NUDOCS 8810030363 | |
| Download: ML20154Q312 (1) | |
Text
--_
.\\
SEP 271938 Ventress Memorial Library ATTN: Mr. Dennis Corcoran Ofrector Library Plaza Marshfield, Massachusetts 02050
Dear Mr. Corcoran:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Pcwer Station (PNPS).
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely, OPIGINAL SIGNED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encls:
Public Document Room (POR) local Public Document Room (LPOR) bec w/o encls:
L. T. Doerflein, DRP M. J. OtDonato, ORP M. T. Miller, SLO NI:
P RI:0RP P
LDoerflein/mjd JWiggins ins 9h4 /88 94b/88 4
9/1 /88 0FFICIAL RECORD COPY LIBRARY MARSHFIELO - 0001.0.0 09/26/88 l[
f5Y$$$EA8E8fgf PDC
- _ -_-___ ___ _________ _ -