ML20206L998
| ML20206L998 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/16/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corcoran D MARSHFIELD, MA |
| References | |
| NUDOCS 8811300335 | |
| Download: ML20206L998 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NOV 161988 Ventress Memorial Library ATTN:
Mr. Dennis Corcoran Director Library Plaza Marshfield, Massachusetts 02050
Dear Mr. Corcoran:
This letter forwards a copy of the transcri,,ts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by NRC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS, Please place this material with the copy of the PNPS Restart Plan and Self-Assassment Report, which were previously provided, and make it available for put,'. ic review.
Thank you for your continuing cooperation in this matter.
Sincerely, OMGWL SIGHED BY Samuel J. Collins, Deputy Director Division of Rea6 tor Projects
Enclosures:
As stated cc w/o encis:
Public Document Room (POR)
Local Public Document Room (LPDR) bec w/o encls:
L. T. Doerflein, DRP M. J. DiDonato, DRP M. T. Miller, SLO OFFICIAL RECORD COPY LIBRARY MARSHFIELD - 0001.0.0 l2A'22Mggig,
/ 'f 11/16/83
/'
- o
'o '. k Ventress Memorial Library 2
NOV 16198's i
tkI ds RI:0RP RI:DRP
$1:DRP l ^RP LDoerflein/mjd (14Blough JWiggins as 11/t <,3/88 11/1G/88 11/lb 88 11/ %"/88
/
0FFICIAL RECORD COPY LIBRARY PARSHFIELD - 0002.0.0 11/16/S8
,