SEP 271988 The Honorable William B. Golden Commonwealth of Massachusetts Senate State House - Room 416B Boston, Massachusett, 02133
Dear Mr. Golden:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assess: rent Report for the Pilgrim Nuclear Power Station (FNPS).
Contents of this Report will be discussed at the Public Meeting scheduled for September 29, 198.3, in Plymouth, Massachusetts.
Sincerely,
- DIGIML SIGNED By 0
Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encis:
Public Docu ent Room (POR) local Pubite Document Room (LPDR) bec w/o encls:
L. T. Doerflein DRP M. J. DiDonato, DRP M. T. Miller, SLO N RI:0RP RI:0RP 1
P L0cerflein/mjd JWiggins M lins 9AY/88 9/ /83 9/11/83 0FFICIAL RECORD COPY SENATOR GOLDEN - 0001.0.0 09/26/83 l
es10030226 800927 0
ACCCK05oSy3 f
FDR
-