ML20154P916

From kanterella
Jump to navigation Jump to search
Forwards Restart Readiness Assessment Rept for Facility. Rept to Be Discussed at 880929 Public Meeting in Plymouth,Ma.W/O Encl
ML20154P916
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Golden W
MASSACHUSETTS, COMMONWEALTH OF
References
NUDOCS 8810030226
Download: ML20154P916 (1)


Text

,n.

SEP 271988 The Honorable William B. Golden Commonwealth of Massachusetts Senate State House - Room 416B Boston, Massachusett, 02133

Dear Mr. Golden:

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assess: rent Report for the Pilgrim Nuclear Power Station (FNPS).

Contents of this Report will be discussed at the Public Meeting scheduled for September 29, 198.3, in Plymouth, Massachusetts.

Sincerely,

  • DIGIML SIGNED By 0

Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encis:

Public Docu ent Room (POR) local Pubite Document Room (LPDR) bec w/o encls:

L. T. Doerflein DRP M. J. DiDonato, DRP M. T. Miller, SLO N RI:0RP RI:0RP 1

P L0cerflein/mjd JWiggins M lins 9AY/88 9/ /83 9/11/83 0FFICIAL RECORD COPY SENATOR GOLDEN - 0001.0.0 09/26/83 l

es10030226 800927 0

ACCCK05oSy3 f

FDR

-