ML20206K364
| ML20206K364 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/16/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | MASSACHUSETTS, COMMONWEALTH OF |
| References | |
| NUDOCS 8811290378 | |
| Download: ML20206K364 (2) | |
Text
'
1, NOV 161988 Plympt)n Public Library ATTN:
Librarian 248 Mail Street Plympto.1, Massachusetts 02367 Gentlemen:
This letter forwards a copy of the transcripts of the Pubile Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by NRC on October 5,1988, in Rockville, Maryland, on th<s status of readiness for restart of PNPS.
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, whi:h were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely, ORW;fNAL SIGNED BY Samuel J. Collins, Deputy Director Division of Reactor Projects t
Enclosures:
As stated cc w/o encls:
Public Document Room (POR) i Local Public Document Room (LPOR) j bec w/o encls:
i L. T. Doerflein, ORP M. J. DiDonato, DRP l
M. T. Miller, SLO i
i
(
i O
1 P
g r
OFFICIAL RECORD COPY LIBRARY PLYMPTON - 0001.0.0 g u ne,ee a
t
~
' ' 'a.
ggy 16 I900 P.lympton Public Library 2
4 R1:0RP RI:URP
_ 8I:0RP f@RP L0cerflein/mjd g3 RBlough g%LaWiggins Cdlijns 11/lb/88 11/lb/88 11/jb/88 11/ \\4 88 0FFICIAL RECORD COPY LIBRARY PLYMPTON - 0002.0.0 11/16/88