ML20195H009

From kanterella
Jump to navigation Jump to search
Forwards Transcript of NRC 880929 Public Meeting in Plymouth,Ma Re Technical & Mgt Issues at Plant & Transcript of 881005 Meeting in Rockville,Md Re Status of Readiness for Restart of Plant.W/O Encl
ML20195H009
Person / Time
Site: Pilgrim
Issue date: 11/16/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pillsbury M
MASSACHUSETTS, COMMONWEALTH OF
References
NUDOCS 8811300180
Download: ML20195H009 (2)


Text

,. _ _ _ - _ _ _ _ _ _ _

-, + ,

I J

, NOV1giggg Wareham Free Library ATTN: Ms. Mary Pillsbury

'75 High Street Wareham, Massachusetts 02571 De e Ms. Pillsbury:

This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory .Commi ssion (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by' NRC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.

Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely, OR$ mal SIGMD BY Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encls:

Public Document Room (POR) local Public Document Room (LPDR) bec w/o encis:

L. T. Doerflein, ORP M. J. DiDonato, DRP M. T. Miller, SLO 4

0FFICIAL RECORD COPY LIBRARY WAREHAM - 0001.0.0 I

11/16/88 8911300100 881116 V PDR ADOCK 0500C293 PNU

{0 P

J

. Wireham Free Library 2 k0 II:0RP di>

R ,mtQ3P RI:DRP tQstRI:0RP LDoerflein/mjd gilBlough hJWiggins p111ns 11A4/88 11/Ib/88 11/lb/88 11 $ /88

' OFFICIAL RECORD COPY LIBRARY WAREHAM - 0002.0.0 11/16/88

'