SEP 27 ggg Plymouth Public Library ATTN: Ms. Grace Karbott 11 North Street Plymouth, Massachusetts 02360
Dear Ms. Karbott:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Power Station (PNPS).
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely.
08l0lNAL SIGNED By Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encis:
Public Document Room (POR)
Local Public Document Room (LPOR) bec w/o enc 15:
L. T. Doerflein, DRP M. J. DiDonato, ORP M. T. Miller, SLO i
2 RI:0RP RI:0RP
- jR L0oerflein/mjd JWiggins CM11 s 9/A /88 9/de/88 941/88 0FFICIAL RFCORD COPY LIBRARY PLYMOUTH - 0001.0.0 09/26/88 i $
i 003028sePgg o
a=ce C g
PDC,