ML20154P860
| ML20154P860 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/27/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Neubauer J DUXBURY, MA |
| References | |
| NUDOCS 8810030205 | |
| Download: ML20154P860 (1) | |
Text
!
l SEP 271988 Duxbury Library ATTN: Ms. Janice Neubauer 147 St. George Street Ouxbury, Massachusetts 02332
Dear Ms. Neubauer:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim NuclearPowerStation(PNPS).
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
j t
Sincerely,
'0RIGINAL SIGNED BY I
Samuel J. Collins, Deputy Dirtetor Division of Reactor Projects
Enclosures:
i As stated cc w/o encis-Public Document Room (PDR)
Local Public Document Room (LPOR) l
, bec w/o encists I_
A'M.J.010onato,DRP~'g' T.,Seerftetm. OE j
M. T. Miller, SLO i
i l
dd hl:0RP I:0RP RP l
L0cerflein/mjd 0 JWiggins 11tns l
9/26/88 9/0/88 9/jt/88 0FFICIAL RECORD COPY LIBRARY OUXBURY - 0001.0.0 09/26/88 8910030205 680927 I
I y
PDR ADOCK 05000293 L
P PDC 7 65l'
. - - -