ML20195H568
| ML20195H568 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/16/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Levin R MARSHFIELD, MA |
| References | |
| NUDOCS 8811300478 | |
| Download: ML20195H568 (2) | |
Text
_
g, s, -
l
~
NOV 161988 l
Board of Selectmen ATTN: Mr. Richard Levin t
Chairman 870 Moraine Street Marshfield, Massachusetts 02050
Dear Mr. Levin:
This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by NRC on October 5,1988, in i
Rockville, Maryland, on the status of readiness for restart of PNPS.
This material is provided for your information. Copies of this material have also been sent to the Public Libraries within the Emergency Planning Zone (EPZ), which had previously received copies of the PNPS Restart Plan and Self-Assessment Report, for pubite review.
Your continuing cooperation and interest in this matter is appreciated.
5 Sincerely, ORIGMAL SIGifED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encis:
Public Document Room (POR)
Local Public Document Room (LPOR)
{
[
}
bec w/o encis:
}
L. T. Doerflein ORP N. J. OtDonato, DRP j
M. T. Miller, SLO j
[
i 4
0FFICIAL RECORD COPY SELECTMEN MARSHFIELD - 0001.0.0 11/16/88 3g51 8811300478 881116
{Q ADOCK O g3 pR
i NOV 161988
'M'. Richard Levin 2
r
$ftb d
RI:DRP RI:DRP s I:DRP R.
P LDoerflein/mjd
{n RBlough JWiggins ti s 11/ils/88 11/lt, /88 11/lb/88 11M /88 0FFICIAL RECORD COPY SELECTMEN KARSHFIELO - 0002.0.0 11/16/88