ML20154Q312

From kanterella
Revision as of 11:22, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards NRC Rept, Pilgrim Restart Assessment Panel Restart Readiness Assessment Rept. W/O Stated Encl
ML20154Q312
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corcoran D
MARSHFIELD, MA
References
NUDOCS 8810030363
Download: ML20154Q312 (1)


Text

--_

.\

SEP 271938 Ventress Memorial Library ATTN: Mr. Dennis Corcoran Ofrector Library Plaza Marshfield, Massachusetts 02050

Dear Mr. Corcoran:

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Pcwer Station (PNPS).

Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely, OPIGINAL SIGNED BY Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encls:

Public Document Room (POR) local Public Document Room (LPOR) bec w/o encls:

L. T. Doerflein, DRP M. J. OtDonato, ORP M. T. Miller, SLO NI: P RI:0RP P LDoerflein/mjd JWiggins ins 9h4 /88 94b/88 9/14/88 0FFICIAL RECORD COPY LIBRARY MARSHFIELO - 0001.0.0 09/26/88 l[

f5Y$$$EA8E8fgf -

PDC

- _ -_-___ ___ _________ _ -