Forwards Safety Insp Rept 50-440/85-42 on 850622-0802 & Notice of Violation
ML20134D282
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20134D285 List:
References
NUDOCS 8508190174
Download: ML20134D282 (2)


See also: IR 05000440/1985042

Text

_____ __

i

'

l

AUG .t 3 3935

1

Docket No. 50-440 1

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group ,

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:  ;

This refers to the routine safety inspection conducted by D. E. Hills,

G. F. O'Dwyer, and R. D. Lanksbury of this office on June 22 through

August 2,1985, of activities at Perry Nuclear Power Plant authorized

by NRC Construction Permit No. CPPR-148 and to the discussion of our

findings with Mr. M. D. Lyster and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

.CII0i n R Signed by J. J. II4FriSo4

4 w

8508190174 e50813

PDR ADOCK 05000440

0 PDR

C. J. Paperiello, Director

Division of Reactor Safety

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Report

No. 50-440/85042(DRS)

See Attached List For Distribution

\\

fW

-

...

I i:r

The Cleveland Electric Illuminating 2

AUG 131985

. Company.

Distribution

cc w/ enclosures:

J.-J. Waldron,. Manager, Perry.

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

-Operations Department

L. 0.~ Beck, General-Supervising

Engineer, Nuclear Licensing and

Fuel Management Section.

DMB/ Document Control Desk (RIDS)

desident' Inspector, RIII

~ Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

' Robert H.-Quillin, Ohio

Department of Health

9

.

tb

bh&kO'Dwyer

Hilld/kja  % $cE,

Lanksbury Rin , _nop F

h

r ison Paper 1ello

08/12/85- 6 l3 8 15

- _ _ _ _

.

O

t

6 9

e

' >

p.

I e #

l

t

t

.

P"

k *

\

v

F

b

> $ 1 ) .g 9

r' p ,^

+ - . . . . . , ,

  • g

N =

-

m. * f.* .

-

\ .

,

,

'

b * ' F lg -- I ( '_ &

, g

6 -

'] % ,] e (

f  % - *

, .

%,,

a . 'g

, c _ .

,

.

b

4

9

4

+ , s

'-

6

4

6 e

f f

n

'%

-a g

I< t.

$

I* e I . p' 1

I

- - ___ .._

W .

,

Appendix 2

Contrary to the above, the licensee failed to establish adequate

measures to insure that the Shift Test Engineer was aware of the

status of his system, with respect to temporary alterations, while

it is undergoing testing and to thereby insure that the required

testing demonstrated that the structures, systems and components

will perform satisf actorily in service (440/85042-07(DRS)).

.

This is a Severity Level IV violation (Supplement II).

3. 10 CFR 50, Appendix D, Criterion XIV, as implemented through the

licensee's CNQAP, Section 1400, requires that measures be established

to indicate the status of individualitems of a nuclear power plant.

Contrary to the above, the licensee failed to establish and implement

adequate measures to indicate the jurisdictional status of equipment

within the Control Roorr.. Adequate controls had at one time existed,

but aue to a chance in an Operations administrative procedure, these

controis were negated (440/85042-06(DRS)).

Tnis is a Severity Levei V violation (Supplement II).

Pursuant to the Drovisions of 10 CFE 2.201, you are required to submit to

this office witnin thirty days of tne date of this Notice a written statement'

or explanation in reply, including for each item of noncompliance: (1) cor-

rective action taken and the results achieved; (2) corrective action to be

taken to avoid furtner noncompliance; and (3) the date wnen full compliance

will De achieved. Consideration may be given to extending your response time

for good cause shown.

y

\

AUG 131985

{' hfu ",10'

Dated C. J. Paperiellc, Director

Division of Reactor Safety