ML20195G674
| ML20195G674 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/10/1999 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20195G678 | List: |
| References | |
| 50-440-99-03, 50-440-99-3, NUDOCS 9906160143 | |
| Download: ML20195G674 (3) | |
See also: IR 05000440/1999003
Text
'
.
3,
p tatu
UNITED STATES 1
- j
ig
NUCLEAR REGULATORY COMMISSION
,
[
REGION lil
o
y
801 WARRENVILLE ROAD
- 4
D
e
LISLE, ILLINOIS 60532-4351
(e....'/
'
' June 10, 1999
Mr. Lew W. Myers
Vice President - Nuclear
FirstEnergy Nuclear Operating Company
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
. PERRY INSPECTION REPORT 50-440/99003(DRP)
Dear Mr. Myers:
On May 17,1999, the NRC completed a routine safety it,spection at the Perry Nuclear Power
Plant. The enclosed report presents the results of that inspection.
During this 6-week inspection period, the conduct of activities at the Perry facility was
professional with an appropriate focus on safety. The plant staff safely and effectively
conducted refueling operations. Lessons leamed were applied from the previous refueling
outage in the areas of communications, operator performance, safety tagging, and work
control. The plant staff was also effective in inspecting, locating, and correcting the previously
identified fuel failures and steps were taken to minimize the potenkt for future fuel damage.
Detracting from the otherwise good performance during this inspr dw period were examples
where procedural requirements were not properly adhered to.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred.- These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. !f you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, D.C. 20555-0001, with copies to the Regional Administrator, Region Ill, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
D.C. 20555-0001.
.
9906160143 990610
ADOCK 05000440
0
,
Q?.
- . .
_
o
i
L. Myers
-2-
l
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
!
enclosure, and ycur response (if you choose to provide one) will be placed in the NRC Public
Document Room.
Sincerely,
/s/ T. J. Kozak
Thomas J. Kozak, Chief
l
Reactor Projects Branch 4
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 50-440/99003(DRP)
cc w/ encl:
H. Hegrat, Manager,
Regulatory Affairs
R. Schrauder, Director,
Nuclear Engineering Department
W. Kanda, General Manager,
Nuclear Power Plant Department
N. Bonner, Director,
Nuclear Maintenance Department
H. Bergendahl, Director,
Nuclear Services Department
Ohio State Liaison Officer
!
R. Owen, Ohio Department of Health
C. Glazer, State of Ohio
Public Utilities Commission
I-
l
DOCUMENT NAME: G:\\PERR\\PER99003.DRP
l
To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E"a Copy with enclosure"N"= No copy
'
DFFICE
Rill
l6
Rill
_.
lrd
NAME
Lipa/djp/co TE4/ Kozak *
DATE
06/to/99
06/ad99
OFFICIAL RECORD COPY
\\:
.
.
.
...
.
. . . . . -.
'
p
o.
e
L. Myers
3-
- Distribution!
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
B. Clayton, Rlli w/encI
SRI Perry w/enci
DRP w/enci
DRS w/ encl
Rlli PRR w/enct
PUBLIC IE-01 w/ enc!
- Docket File w/encI
j
GREENS
'
IEO (E-Mail) .
DOCDESK (E-Mail)
I
-
f
,
'r
.
p'3 O I'O I
l
l
l
l
b_-
J